ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October 2010 1.

Slides:



Advertisements
Similar presentations
March 22, 2011 Mauro Pivi SLAC ALCPG11 Eugene Oregon March 19-23, 2011 Working Group plans.
Advertisements

Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
Global Design Effort 1 Summary of Technical and Collaboration Related Issues for the ILC Damping Rings N. Walker (for the Project Managers) INFN Frascati.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York ECLOUD Simulations for the Tune Shift Measurements of December.
First approach to the SuperB Rings M. Biagini, LNF-INFN April 26th, 2006 UK SuperB Meeting, Daresbury.
Damping Rings Baseline Lattice Choice ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
45 th ICFA Beam Dynamic Workshop June 8–12, 2009, Cornell University, Ithaca New York ECLOUD Simulations for the Tune Shift Measurements of December.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
ILC Damping Rings R&D Meeting: Cornell, September 2006 Andy Wolski University of Liverpool and the Cockcroft Institute 26 September, 2006.
Report on the Damping Ring Meeting at CERN, Nov , 2005 J. Gao IHEP, Beijing, China Nov. 24, 2005, ILC-Asia Meeting.
Proposed machine parameters Andrei Seryi July 23, 2010.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
SB2009/ Low energy running for ILC International Workshop on Linear Colliders 2010 Andrei Seryi John Adams Institute 19 October 2010.
March 23, 2010 CMAD a tracking and e-cloud beam instability parallel code (M.Pivi SLAC) Taking MAD(X) optics file at input, thus tracking the beam in a.
Global Design Effort DR Session Introduction S. Guiducci (LNF) ILC10, Beijing 27 March 2010.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
Damping Ring S. Guiducci AAP Review Tsukuba 20 April 2009.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
June 16, 2009 Today: Updates on Mitigations KEK – Y. Suetsugu Updates on photoe- estimates by Synrad3D – K. Harkay CesrTA last run and updates on mitigations.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
DR to RTML ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Nov 17, 2009 Webex Assessing the 3.2 km Ring feasibility: Simulation parameters for electron cloud Build-up and Instability estimation LC DR Electron Cloud.
S. Guiducci WG3b - Damping ring size and layout. DR configuration recommendation Circumference and layout ~ 17 km dogbone 3 km or 6 km ring Single rings.
Damping Rings Lattice Evaluation Mark Palmer Cornell University January 19, 2011.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Vacuum System S. Guiducci BTR, LNF 8 July RDR - electron damping ring:
Electron Cloud Issues for the 3.2km Positron Damping Ring Mark Palmer (Cornell University) GDE January 18, 2011 ILC Baseline Assessment Workshop 2 SLAC.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
2011 Damping Rings Lattice Evaluation WebEx Meeting May 24, 2011 Mark Palmer Cornell University.
LNF Frascati, July 8, 2011 DR Technical Baseline Rev. Global Design Effort 1 DR Technical Baseline Review INFN LNF · Frascati, Italy July 7 and 8, 2011.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 20, 2011.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
ILC e - and e + sources overview Jim Clarke STFC Daresbury Laboratory, UK On behalf of ILC Positron Sources Group.
The ILC Outlook Barry Barish HEP 2005 Joint ECFA-EPS Lisbon, Portugal 23-July-05.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
3 February 2010 ILC Damping Ring electron cloud WG effort Mauro Pivi SLAC on behalf of ILC DR working group on e- cloud ILC DR Webex Meeting Jan 3, 2010.
CLIC Re-baselining CSC, October Possible CLIC stages studied 2.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Positron Source for Linear Collider Wanming Liu 04/11/2013.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
Damping Ring Summary S. Guiducci, M. Palmer, M. Pivi, J. Urakawa
ILC DR instability simulations
Andy Wolski University of Liverpool and the Cockcroft Institute
ILC DR instability simulations
ILC Damping Ring electron cloud WG effort
CTA 09 - Introduction David Rubin Cornell Laboratory for
Barry Barish Paris ICHEP 24-July-10
Session Introduction & Damping Rings Baseline Lattice Decision
ILC DR instability simulations
DR Session Introduction
R&D GOALS AND MILESTONES TOWARDS A TECHNICAL DESIGN REPORT TDR (2008)
Presentation transcript:

ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October

ILC Damping Rings: Summary of Configuration Recommendations December 6, 2005 Circumference The positron damping ring should consist of two (roughly circular) rings of approximately 6 km circumference in a single tunnel. Electron-cloud effects make a single ring of circumference 6 km or lower unattractive, unless significant progress can be made with mitigation techniques. … The feasibility of the baseline depends on: further progress with developing techniques for suppressing electron cloud (positron rings); … Alternatives 1. If techniques are found that are sufficiently effective at suppressing the electron cloud, a single 6 km, or possibly smaller, ring can be used for the positron damping ring. 2 Changed to 1 ring Aug. 2006

Circumference 3 Summary of Configuration Recommendations December 6, 2005

DR Configurations Present Baseline since TILC08 –6.4 km DCO4 lattice, 2600 bunches, 6 ns bunch spacing SB2009 proposed as new baseline for TDP –3.2 km DSB3 lattice –Nominal - Low power option: 1300 bunches, 6 ns bunch spacing –Luminosity upgrade - High power option: 2600 bunches, 3 ns bunch spacing 4

BAW2 – SLAC Jan 2011 The Second Baseline Assessment Workshop will focus on proposed changes to the ILC Technical Design Baseline and will prepare recommendations to the Top Level Change Control (TLCC) evaluation panel (chaired by GDE Director) –1 Reduced Beam Parameter set –2 Positron Source Location Charges for DR –Evaluation of SB2009 performance with 6ns bunch spacing –Upgrade path: 3ns bunch spacing –R & D strategies –Cost impact –Performance impact 5

Goal of the meeting Prepare the recommendations for electron cloud mitigations in the positron damping ring with 6 ns bunch spacing Next steps (ready for BAW2) Give a risk evaluation for the high power option upgrade: 3 ns bunch spacing Identify items that need further R&D Mid 2011 Detailed report of e-cloud working group 6