P15453 11/24/14 Meeting. What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

Slides:



Advertisements
Similar presentations
Strategic Planning Process: An Overview
Advertisements

Facilitated by Joanne Fraser RiverSystems
Advanced Project Schedule Risk Analysis
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Work Breakdown Structures. Purpose The WBS shows different levels within the product hierarchy. For Government program managers levels 1-3 are of prime.
[Title of meeting] [Name of sponsor] [Date] For guidance on working with PowerPoint and reformatting slides, click on Help, then Microsoft PowerPoint Help,
Scrum. An evolutionary/iterative/incremental/agile software process The main roles in Scrum are: – Scrum team: Team of software developers – Scrum master.
Project Management Workshop. Nick Cook  Citigroup Corporate and Investment Bank  European Technology Business Office Manager Edinburgh University April.
Project Control Techniques
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
1 TiVi80 – Spot Analyzer Welcome to the presentation of.
Project Risk Management
Fundamentals of Information Systems, Second Edition
Recall The Team Skills Analyzing the Problem
Electric Circuits And Voltage
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Management and Scheduling
Barry Murash MBBit Nortel 2007
Project Evaluation and Control Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Instructions & Notes This template was created to help you: – Show the team where you are going via slides representing each planned activity. – Keep your.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Project Evaluation and Control
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
EPRI CIM for Dynamic Models Project Report Terry Saxton Xtensible Solutions May 13, 2009.
Client Logo LEAN ENTERPRISE Implementation Workshop.
Bulk facility SAG INFOTECH PVT. LTD. Service begins here…
Chapter 10 Contemporary Project Management Kloppenborg
INSURANCE DEFENSE PRACTICE AREA TEMPLATE for Time Matters ® /Total Practice Advantage ® By IP ASSOCIATES, LLC.
Chapter 6: Project Time Management
Team Skill 6: Building the Right System From Use Cases to Implementation (25)
Recap from last week Understand organizations, including the four frames, organizational structures. Explain why stakeholder management and top management.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
10/12/ Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 1. Interviews & questionnaires.
ICOM 5047 – Progress Report – The Smart Health Station November 2, Axel Vigo Josué Acevedo Pedro J. Franceschi Wilfredo Torres.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
An Introduction to Designing and Executing Workflows with Taverna Aleksandra Pawlik materials by: Katy Wolstencroft University of Manchester.
T Project Review WellIT PP Iteration
Chapter 14: Using the Scalable Decision Process on Large Projects The process outlined is meant to be scaleable. Individual steps can be removed, changed,
Project Management, March 3-5, 2003, Week 9 -Agenda. Exam review: Effective meetings – handout. Use when in groups. Risk management as part of planning.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
Project Schedules Chapter 4 Applied Software Project Management, Stellman & Greene See also:
Business Consulting Services Engagement Proposal & Letter of Agreement Project Management Timelines/GANNT Chart.
T Project Review RoadRunners [IM3] Iteration
P16221 – FSAE Shock Dynamometer Preliminary Detailed Design Review November 13, 2015.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Project Management Inspections and Reviews 1 February.
Project Management Organization Scheduling 31 January.
P16453 Subsystem Design Loading, Measurement, Control, and Test of a Journal Bearing Test Platform Kris Kidder | John Dolan | Shay Stanistreet | Anthony.
K-12 Teaching Application Support and Software Ongo-08 Client Dr. John Lamont Prof. Ralph Patterson Advisor Dr. Gregory Smith Team Members Sean Boyle Tony.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
Project Time Management
Water Flow GROUP A. Analogue input voltage results: Motor Input voltage( V) pin 12 Analogue input voltage (V) Display number
T Iteration Demo Group 1 Project Planning Iteration
DRIVER DRIVER DIAGRAM a framework for success A framework for success.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
3/21/20161 Project Title Team Name Team membership Customer (if you have a customer) EEL3923C Junior Design (S11) Date: Project #
Meet with groups and guide1 day9/11/2009 Identify team leader1 day9/11/2009 Decide on team norms and behaviors5.5 days9/11/20099/18/2009 Decide group.
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
A Brief intro to Project Management What can it do for you
Animation of a planning
Project management Software development typically includes:
Recall The Team Skills Analyzing the Problem
Importance of Project Schedules
Detailed Design Review (Phase 4)
Detailed Design Presentation
Preliminary Detailed Design Review: P18001
Stage 8: Lighting a restaurant
Presentation transcript:

P /24/14 Meeting

What we did well ●Depth and thoroughness of work ●Documentation of work ●Team Work ●Others?

What we need to improve on ●Last minute work ●Team brainstorming critical design features ●Documenting work ●Others?

What’s Next Detailed Design/Gate Review 1.EMA Detailed Design 2.Secondary Requirement Design 3.Test Plans 4.Finalize Risks & Bill of Materials 5.Make Edge Pretty 6.Test Transducer

EMA Detailed Design ●Analyze each component o Screw calculator o Ansys of mounting fixturing o Locating pins? o Load cell connection ●Team brainstorm critical components ●Select critical component design with justification ●Consult subject matter experts on designs ●Finalize 3D models & 2D drawings ●Identify long lead items ●Expand controls flow diagram if needed

Secondary Requirements ●Identify secondary requirements ●Consult morph for possible solutionsConsult morph for possible solutions ●Explore options strengths and weaknesses(pugh) ●Create 3D/2D designs for implementation ●How will information be displayed? o Excitation voltage required? o Signal conditioning? o Sampling rate? ●Bill of materials* ●Risk assessment* *these will be added to the main document later

Test Plans EMA to have extensive test plans ●Receive parts ●Install software and get operational ●Communicate with EMA through controller ○Simple movement ○Force test ●Implement Secondary requirements are simpler but still thorough ●Bench top testing o Example: Thermocouples in hot water, compare TC readings with thermometer Keys: Estimated times for each process helps gantt Thoroughness here will lead to easier MSDII

EDGE ●Make sure there isn’t anything left from the template ●Update roles ●Update gantt charts ●Add risk assessment ●Add project plans

Test Transducer ●Theoretical Analysis o How much displacement and force will x amount of volts produce? o Call supplier and get quote on parts o Based on forces iterate fixture design o Update B.O.M. o Test plan o Risk assessment

Addition of Physical Calendar Show progress Keeps DDR in sights

Addition of Physical Action Items Allows us to see who’s doing what Allows us to see our status of completion If your looking for more tasks you can see who to ask