Extends A WARM WELCOME. Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT.

Slides:



Advertisements
Similar presentations
Directorate-General for Regional Policy EUROPEAN COMMISSION Cohesion Policy and the water sector Eddy Hartog Head of Unit, DG REGIO EU Sanitation Policies.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
“Upgrading the collection and wastewater treatment system in Ploiesti City”
Energy Efficiency Measures in Moldovan Utilities GUTU SERGIU, MAY 08, 2014.
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
Surat Wastewater Recycling Project through PPP Approach SACOSAN IV – Group Discussion on Urban Sanitation Dr. Anand Chiplunkar 07 April, 2011.
JICA’s Cooperation for Urban Water Supply and Sanitation
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Northern Ireland Water QUESTOR Centre, QUB. Introduction: UK Water Industry 25 water companies in England & Wales 12 water and sewerage providers 13 water.
Challenges of Urbanisation for Sanitation Infrastructure in Lesotho By : Palesa Monongoaha Project Manager - WASCO.
Quantity of Water and Wastewater CE 547. Probability Quantity of Water Types of Wastewater Sources of Wastewater Population Projection Deriving Design.
Osward M Chanda Director –Nwasco 21 st November, 2007 Zambezi Sun Hotel, Victoria Falls, Zambia.
PLAN FOR SEPTAGE MANGEMENT UNDER AGARTALA MUNICIPAL COUNCIL BY MILIND RAMTEKE, IAS CHIEF EXECUTIVE OFFICER AGARTALA MUNICIPAL COUNCIL AGARTALA, TRIPURA.
Citizen voice in Water and Sanitation Reform Rosemary Rop, Water and Sanitation Consultant July 24 th 2007.
UK WIR The UK Experience Christopher Royce Anglian Water Services.
SEA for Sanitation & sewerage in Metro Manila, Philippines Manila Third Sewerage project.
Water Distribution Public, Private, or Both by K. William Easter Professor of Applied Economics University of Minnesota KREI Seminar - May 14, 2008.
The Impact of Economic Regulation Cathy Mannion Director Water Commission for Energy Regulation Local Authority Services National Training Group Conference.
1 Japan International Cooperation Agency (JICA) ‘Good Practices’ Related to Access to Safe Drinking Water and Sanitation May 20-21, 2010, Lisbon Consultation.
A Delegated Management Model to Improve Water Supply Delivery within Informal Settlements: Lessons learned from Nyalenda, Kisumu. Alain MOREL Sr Water.
Wastewater generation
Water Issues In India by Vijay Kumar Eppakayala. India on the globe.
DOMESTIC SEWAGE GENERATION, COLLECTION, AND TREATMENT IN CLASS I CITIES Sr. No.WastewaterYear (?)2007 (?) 1Generated, mld7,007 16,27135,558.
KUWASIP Karnataka Urban Infrastructure Development & Finance Corporation Working towards better urban living 1 World Bank assisted Karnataka Urban Water.
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
The story of two recent water projects…….. June 2005.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Presentation by AER’s Consumer Challenge Panel (CCP) sub-panel 7 David Prins and Robyn Robinson.
Supply of Water Disposal of Sewerage Storm Water Drainage Dhaka WASA, an autonomous body, started its journey with the mandate to effect.
WSNTG Annual Conference September 2006 Water Services National Training Group 10 th Annual Conference 7 th September 2006.
Mysore City Corporation Mysore JnNURM. Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW 15 th January 2009 Projects State : Karnataka.
WSNTG Annual Conference 8 th September 2005 WSNTG 9 th Annual Conference “Water Services Strategic Plans – Fact or Fiction”
Applying scientific thinking in the service of society Water and Sanitation Low carbon cities meeting 04 – 06 October 2010.
Making your Water System Smarter with Intelligent Infrastructure™
MINISTERUL MEDIULUI ŞI DEZVOLTĂRII DURABILE ROMANIA Programming Meeting Water Consultants 5 th of March 2008 Novotel 1.
14/10/2015European Agency for Reconstruction1 Water & environment.
Jawaharlal Nehru National Urban Renewal Mission JNNURM PROGRESS REVIEW December 2008 Projects State : Karnataka City : Mysore.
Year wise Details of Environmental Audits Conducted by SAI India & Appeared in the Audit Reports, as compiled by Regional Training Institute, Mumbai.
1 Environmental Sustainability: Need for Action – BEL Perspective Rajiv Mohan Rao, Bharat Electronics.
1 II. Sewer Networks and Facilities Topic II.1. Kinds of Wastewater. General Scheme of Sewerage. Kinds of Sewerage Schemes (Patterns) Sewerage Definition:
Planning.Maryland.gov The Sustainable Growth and Agricultural Preservation Act of 2012 Arnold Preservation Council March 9, 2015.
Infrastructure management system Managers and engineers need clear guidelines for life-cycle management of infrastructure systems for water, sewer, and.
ELCITA Update 25 th August Update – Estate Management E – Toilets 8 e-toilets operational and work order placed for 4 more e-toilets Under Ground.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Alandur Sewerage Project Background: Municipality in Chennai Metropolitan Area Population of around 165,000. Before 1996, town did not have underground.
Winchester Municipal Utilities 2009 Rate Plan April 9, 2009.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
World Water Forum IV Civil Society Engagement in Kathmandu Water Supply Reforms Nepal Experience NGO Forum for Urban Water and Sanitation 19 th March 2006.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
1. 2 Regional water wholesaler to 6 counties covering 5,200 square miles Serves 19 million people = 50% of the state’s population with projected population.
MACHINERY AND EQUIPMENT OWNED  HOT MIX PLANT 40/60 TPH ELECTRONICALLY CONTROLLED :12 Nos ELECTRONICALLY CONTROLLED :12 Nos AS PER MOST (III REVISION)
Sewerage Infrastructure Development in Sarawak
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
INCREASING THE DIALOGUE BETWEEN SCIENTISTS, POLICY MAKERS AND STAKEHOLDERS SUBERNAREKHA RIVER BASIN, INDIA SOCIO-ECONOMIC ISSUES AND POLICY OPTIONS RAMESH.
South City International School, India. Most of the rainfall will soak into the soil, which acts like a giant sponge. In the soil some of the water will.
WASTEWATER TREATMENT PETRIT TARE GENERAL DIRECTOR OF UKKO JSC CONFORMING TO EU WASTEWATER TREATMENT DIRECTIVE CASE STUDY OF KORCA CITY, ALBANIA.
Kevin Colvett, PE Jonathan Childs, PE CH2M HILL, Nashville CORRECTIVE ACTION PLAN AND ENGINEERING REPORT, PHASE III, FOR THE CITY OF BRENTWOOD, TN Presentation.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
Muttathara Sewage Treatment Plant - Blue Drops. Features of the plant The only one in the whole of Kerala Started in 2012 Capacity of 107 MLD (million.
Water Security for Urban India (Water for billion + people….) Arun Lakhani, Chairman Vishvaraj Environement Pvt. Ltd. SUM – Sustainable Urban Water Management.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
1 KENYA SPAIN MULTILATERAL PARTNERSHIP MEETING (08-11 December 2013) AfDB Kenya Water and Sanitation Portfolio.
The Assessment of Water Utility's Efficiency in Libya ) Case Study (
Hyderabad city water supply system
Overview of the CoJ Water & Sanitation Master Plan
Management of Nutrient Discharges
Namibia water security experience Presented by:. Zelda Scheepers
City of Noblesville Wastewater Utility
WATER & WASTEWATER PUNJAB, PAKISTAN
Presentation transcript:

Extends A WARM WELCOME

Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT SCENARIO

Handling 410 Million Litres of sewage and treating them in 5 sewage treatment plants located in different parts of the City.

Customer friendly initiatives Electronics Clearing System introduced; Informative Website in position; Interactive Voice Response System in position; Monthly Water Adalats in each Sub- Division effectively working; Customer Charter launched; Many transparent measures introduced for the benefit of customers;

Sl.NoSlabs ( in litres)Amount in Rs. Minimum & above36.00 DOMESTIC TARIFF STRUCTURE

NON-DOMESTIC TARIFF STRUCTURE Sl.NoSlabs (in litres)Amount in Rs. Minimum & above60.00 INDUSTRIES TARIFF STRUCTURE Sl.NoCategoryAmount in Rs. 1 INDUSTRIES 60.00/K.L.

CURRENT PROJECTS ON HAND Commissioning of seven sewage treatment plants under Cauvery Water Supply Scheme Stage-IV, Phase-I, adding an additional capacity of 245 MLD. Projected to be completed by December 2003

CURRENT PROJECTS ON HAND Comprehensive networking of all BWSSB offices in Bangalore through LAN WAN. Proposed to be completed by first week of Feb. 003.

CURRENT PROJECTS ON HAND Two tertiary treatment plants – Vrishabhavathi Valley (60 MLD) and Yelahanka (10 MLD) to be commissioned during Feb. 2003

CURRENT PROJECTS ON HAND National River Conservation Plan works with an estimated cost of Rs. 47 crores under implementation

CURRENT PROJECTS ON HAND Newly added areas being networked with water supply and UGD facilities at an estimated cost of Rs. 143 crores.

CURRENT PROJECTS ON HAND An ambitious project for reducing Unaccounted For Water (UFW) and bringing it down to less than 15 % under implementation. Proposed to be completed by December 2003.

AusAID Master Plan Project 1.Planning for Water Supply, Sewerage & Environmental Sanitation. 2.Services Upgrading and Extension for the Urban Poor and Vulnerable Communities. 3.Institutional Capacity Building and Strengthening. 4.Water Supply and Sewerage Pilot Projects. Four Components

Water supply requirements(MLD) B.W.S.S.B. Service Area

Capital cost estimates for Water Supply rehabilitation ( ) (In Rs. Crores) Total Water Treatment Plants Major Pipelines GLRs &OHTs Pumping Stations Minor Pipelines TOTAL

Summary of Capital Costs Stage 1 (In Rs. Crores) Stage 2 (In Rs. Crores) Leakage & UFW Water supply rehabilitation & Extension Major sewer rehabilitation Minor sewer rehabilitation TOTAL

Customer friendly initiatives to be launched during the first half of 2003 Spot billing system 24-hour KIOSKS Web enabled access to customer history Web enabled interactive redressal system