MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.

Slides:



Advertisements
Similar presentations
MSC recent activities virgoweek Cascina 4 Dec 2006.
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Payload design methods versus modeling E. Majorana.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G W Commissioning Data on Vibration Isolation & Suspensions Fred Raab 24 October 02.
SIESTA for Virgo locking experience L. Barsotti University of Pisa – INFN Pisa on behalf of the Virgo Locking Group Cascina, March 16th 2004 Simulation.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
Virgo Control Noise Reduction
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
Prototype Test of Vibration Isolation System Current Status & Schedule
Takanori Sekiguchi Anual Meeting of Physics Society of Japan Sep. 22nd, 2013) Prototype Test of Vibration Isolation System Current Status & Schedule 1.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
EM-MSC MSC Columbus’ eggs VW EM-MSC outline EQG  SFR Note Actuation Noise: still under study, a framework of actions is being.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
MSC recent activities Commissioning Cascina 2 Apr 2007.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
EM-MSC MSC staus & plans Commissioning meeting
SUSPENSION Performance vs. Specs PASSIVE ATTENUATION IN BAND: OK for AdV MIRROR HOR. SWING DAMPING “IN VELOCITY”: Ok for Locking in Adv MIRROR HOR. SWING.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
ILIAS Geneva 29 March 2007 Virgo suspension control progress E. Majorana INFN Mirror Suspension Control workgroup.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
MSC latest weeks activities V. Dattilo, A. Gennai, D. Huet, E. Majorana, F. Paoletti, D. Passuello, P. Ruggi.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Mirror Suspension Control commissioning learning
1 Commissioning meeting, Cascina, LA electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for optimized.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
MSC recent activities COMM Cascina 5 Feb EM-MSC Commissioning-oriented running activity Operation and interface updates Hardware checkup.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
Torsion Pendulum Dual Oscillator (TorPeDO) David McManus, Min Jet Yap, Robert Ward, Bram Slagmolen, Daniel Shaddock, David McClelland.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
MSC, focus on: WI ghost noise. 1 “Recent” history and effect July 11 July 22 Aug 1 Jul 28 Aug 1 The disturbance, with us since Dec , had disappeared.
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
20/09/2006 EM MSC September /09/2006 EM MSC “activities” (from the web page, by Giovanni) are: - Inertial damping - Local control - Tide control.
Last stage SA F7 monitor/control
Type-A SAS Local Control Simulation (Current Status)
VIRGO–KAGRA Meeting about bottom filter damping
Reaching the Advanced LIGO Detector Design Sensitivity
Present Superattenuator performance vs. ET Requirements S
Status of Virgo GWDAW Dec 13-16
Alignment status & plans
Control of the KAGRA Cryogenic Vibration Isolation System
Superattenuator for LF and HF interferometers
The Superattenuator upgrades and the SAFE Project
MSC report September weekly meeting EM-MSC
Weekly meeting Cascina 9 Jan 2007
SUSPENSION CONTROL: a joint Virgo/LSC workshop
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006

EM-MSC MSC “activities” are: - Inertial damping - Local control - Tide control - Locking re-allocation to marionette - F7 control - Vertical control

EM-MSC The “objects” that allow these activities are: - SA-Suspension mechanics (ground-F7) - LastStage-Suspension Mechanics (F7-Mirror) - STD digital control electronics - STD analogic crate (actuation driving) - STD SA-suspension sensors/actuators - F7-ground sensors/actuators - STD local control sensors/actuators - STD interface with GC - SW to deal with all the systems above…. Maintenance and performance (awards!) of each item used by MSC concern object responsible/developer.

EM-MSC Virgo sensitivity (at LF !)Virgo duty-cycle MSC is the direct product of the work done by each responsible of any object or activity. MSC people are involved to efficiently contribute to the achievement of two main tasks: Example, last week:

EM-MSC  seism VS tilt

EM-MSC  seism ( ) mHz: relevant LVDTs seismic component in ID, blending must be accurate; => better lowering Acc/Pos cross-over frequency. 30 mHz crossover N-arm 70 mHz crossover W-arm cavities locked independently (correction signals) As expected Next slide Note:  seism produces excitation of payload pitch and yaw (  x,  z ). Notches implemented to reduce it.

EM-MSC Tilt (f< 100 mHz): - wind speed || LVDT_rms increase (observation); - tilt causes fake acceleration (Losurdo, Passuello, Ruggi); => ID causes LVDT_rms increase through in-loop accel. signal. wind speed susp displacement X crossover f = 30 mHz; Z crossover f = 50 mHz

EM-MSC From the WSR2 run summary Actual configuration arisen through trials and tests during short periods of bad weather. Need of experience during long runs !

EM-MSC Next months (no tiltmeters) mandatory: reduction of rms displacement of IP due to  seism/tilt (Note: large force re-allocation to marionette (zMcorr) during IP oscillation is harmful, causes payload tilts) Difficult using only: 1)ID cross-over frequency tuning (to optimize acc/pos components) 2)notch patches (not to excite payload tilt modes) A proposal arisen during MSC-Losurdo is to “extend and generalize” the tide control. Namely, it means to use mirror level signals derived from the ITF signal to keep IP position instead of LVDT (once locked, science mode etc…). A third handle…

EM-MSC Question marks (several, at least two): - reduction by a factor ~100 in IP rms is enough to ensure decoupling from  seism increase ? - how to deal with x IP d.o.f. (no global signal)? “extended and generalized tide control” (global IP control?) seism attenuated at the mirror level by HTF 100 mHz)  higher ID z cross-over freq. (lesser  seism re-injection without LVDT)  lesser tilt re-injection through accelerometers.

EM-MSC Readout upgrade & microseism Causes a roll about z Roll motion read-out as yaw  y 10 o Motion along x A remarkably useful mistake in optical lever design To the top stage x? Flt Roll notched in  y LC

EM-MSC “global IP control” schedule Step 2) IP control using mirror sensing signal: preliminary test by means of z LC signal, done. Step 1) position control of 4 IPs using standard narrow bandwidth: PR ready to be tested. Step 3) study and test of suitable filters to swap LVDT/mirror-sensing.

EM-MSC Locking force re-allocation

EM-MSC From the WSR2 run summary BS marionette re-allocation ready to be implemented. PR force re-allocation need under study. Test with emphasis-deemphasis (further improvement by a factor 6, D. Huet’s talk).

EM-MSC Further features needed to accomplish the main tasks

EM-MSC F7 damping from ground: Useful in presence of marionette lock re-allocation (actually on NE WE) and, in general, to damp SA Yaw recoil. - BS ready to be implemented - Other installations scheduled (PR,WI,NI)

EM-MSC Vertical damping: Vertical seismic excitation is coupled with payload tilts (  x,  z ), critical in the range Hz. A campaign of tests using the ITF has to be scheduled to better asses the need and specifications of vertical damping.

EM-MSC Interface with Alignment:

EM-MSC LC versus AA: Actual and near-future setup WSR1 - Steep noise re-injection roll-off tested at NI LC  y WI-C7-like  x on both WI and NI - Overall improvement on both LC and AA for all-but-NI  y.

EM-MSC LC versus AA: Actual and near-future setup WSR2 short-term prospective of leaving WI,NI, BS  y under LC+DrCo, aggressive roll-off also in WI

EM-MSC LC versus AA: before WSR3 ? Logbook 11:46, Tuesday 19 September 2006 (13415) IP motion during wind Large lock correction on marionette Driving coupling with  z non-negligible LC  y mario readout coupled to  z Wrong LC driving hardly compensated by Drift Ctrl WSR1 Unlock! Full BW AA recommended on NE.

EM-MSC Conclusions -Assistance to commissioning ITF (performance monitoring and response to commissioning issues) -Effort to develop noise budget tools within MSC - scheduling improvements by merging commissioning requests and the expertise of suspension and LC groups. Konogurai kakakimaska ? The time schedule has to be coordinated with AA setup completion. Two months ?

EM-MSC