Cost-Benefit Analysis and Government Investments

Slides:



Advertisements
Similar presentations
Chap 3 Net Present Value.  Net present value is the single most widely used tool for large investments made by corporations.  Klammer reported a survey.
Advertisements

Correcting Market Distortions: Shadow Prices, Shadow Wages and Discount Rates Chapter 6.
Hawawini & VialletChapter 7© 2007 Thomson South-Western Chapter 7 ALTERNATIVES TO THE NET PRESENT VALUE RULE.
1 The Basics of Capital Budgeting: Evaluating and Estimating Cash Flows Corporate Finance Dr. A. DeMaskey Should we build this plant?
Chapter 3 Program Management and Project Evaluation Professor Hossein Saiedian McGraw-Hill Education ISBN
COST-BENEFIT ANALYSIS Chapter 8. Projecting Present Dollars into the Future R=$ T=years r=interest rate How much will $1000 earn in 2 years at an interest.
1 Chapter 3 Externalities and Public Policy. 2 Externalities Externalities are costs or benefits of market transactions not reflected in prices. Negative.
Cost-Benefit Analysis. 2 Cost Benefit Analysis Identify & evaluate all costs & benefits Discount Assess project(s) by calculating Benefit/Cost Ratio (B/C)
CAPITAL BUDGETING AND CAPITAL BUDGETING TECHNIQUES FOR ENTERPRISE Chapter 5.
CONCEPTS of VALUE. FACTORS OF VALUE UTILITY –THE ABILITY OF A PRODUCT TO SATISFY HUMAN WANTS. RELATES TO THE DAMAND SIDE OF THE MARKET. SCARCITY –THE.
Chapter 14 Assessing the Value of IT. Traditional Financial Approaches  ROI – Return on Investments Each area is considered an investment center ROI.
Government and Health Care Roughly 15 cents of every dollar spent in US is on health care US health care spending equaled $5841 per person in 2002 Governments.
BUSINESS ECONOMICS Class 6 1 and 2 December, 2009.
Managerial Economics and Organizational Architecture, 5e Chapter 17: Divisional Performance Evaluation McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill.
CHAPTER 6 THE SOCIAL DISCOUNT RATE. DOES THE CHOICE OF DISCOUNT RATE MATTER? Yes – choice of rate can affect policy choices. Generally, low discount rates.
Chapter 11 – Cost-Benefit Analysis
Capital Investment Choice Chapter 5
PPA 502 – Program Evaluation
Next page CAPITAL BUDGETING Infrastructure & Project Evaluation Making decisions having significant future net benefits or costs.
Multiple Input Cost Relationships
VI-Economic Evaluation of Facility Investments 1. Project Life Cycle and Economic Feasibility 2.Basic Concepts of Economic Evaluation 3.Costs and Benefits.
Multiple Input Cost Relationships. Output is identical along an isoquant Output is identical along an isoquant Isoquant means “equal quantity” Two inputs.
Chapter 11: Cost-Benefit Analysis Econ 330: Public Finance Dr
Basic Tools of Finance Finance is the field that studies how people make decisions regarding the allocation of resources over time and the handling of.
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 15: Saving, Capital Formation, and Financial Markets.
Chapter 4: Economic Efficiency and Cost Benefit Analysis 1.Economic Efficiency 2.Cost Benefit Analysis.
Economic Concepts Related to Appraisals. Time Value of Money The basic idea is that a dollar today is worth more than a dollar tomorrow Why? – Consumption.
Public Finance (MPA405) Dr. Khurrum S. Mughal. Lecture 12: Cost-Benefit Analysis and Government Investments Public Finance.
Public Finance (MPA405) Dr. Khurrum S. Mughal. Lecture 13: Cost-Benefit Analysis and Government Investments Public Finance.
1 Chapter 10 Introduction to Government Finance. 2 Federal, State, and Local Revenue Sources: Taxes: Payroll Income (Corporate and Personal) Property.
Chapter 3 – Opportunity Cost of Capital and Capital Budgeting
Basic Economic Concepts. OBJECTIVE: The student will become familiar with the following items: Economic Fundamentals –Scarcity –Choices –Basis of Benefits.
Capital Budgeting, Public Infrastructure Investment, and Project Evaluation Troy University PA6650- Governmental Budgeting Chapter 6.
Normative Criteria for Decision Making Applying the Concepts
Considering the Costs of MUS Interventions. Direct Costs v. Opportunity Costs Direct Costs Expenditures and investments to achieve a particular outcome.
Assessing Costs for Environmental Decision Making Chapter 8.
Input Demand: The Capital Market and the Investment Decision.
COST BENEFIT ANALYSIS- PUBLIC SECTOR INVESTMENTS Lucky Yona.
Capital Budgeting The Capital Budgeting Decision Time Value of Money Methods of Capital Project Evaluation Cash Flows Capital Rationing The Value of a.
CHAPTER 11 EVALUATING PROJECTS WITH THE BENEFIT / COST RATIO METHOD $$$ $
17 CHAPTER PUBLIC SECTOR ECONOMICS: The Role of Government in the American Economy Randall Holcombe The Government Budgeting Process.
Ghent University – Department Agricultural Economics Project Management Financial and economic analysis of investment projects.
Measuring Efficiency CRJS 4466EA. Introduction It is very important to understand the effectiveness of a program, as we have discovered in all earlier.
Input Demand: The Capital Market and the Investment Decision
Chapter 10 Choices Involving Time Copyright © 2014 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written.
10.1 Input Demand: The Capital Market and the Investment Decision Capital are those goods produced by the economic system that are used as inputs to produce.
Copyright © 2009 Pearson Addison-Wesley. All rights reserved. Chapter 3 Valuing the Environment: Methods.
INVESTMENT DECISION Types of Investment Business Environment - Economic - Political - Social - Technological Resources Available - Human - Managerial -
Chapter 8 Capital Asset Selection and Capital Budgeting.
The Discount Rate in the Plan Wally Gibson NWPPC Power Committee – Kah-Nee-Ta July 15, 2003.
Capital, Investment, and DepreciationCapitalInvestment and DepreciationThe Capital MarketCapital Income: Interest and ProfitsFinancial Markets in ActionCapital.
1 Cost-Benefit Analysis Public Economics Minda DC. Eduarte.
Benefit-Cost Analysis in Environmental Decision Making
©2005 Prentice Hall Business Publishing, Introduction to Management Accounting 13/e, Horngren/Sundem/Stratton Capital Budgeting Chapter 11.
CRJS 4466 PROGRAM & POLICY EVALUATION LECTURE #6 Evaluation projects Questions?
Capital Budgeting 2 Dr. Clive Vlieland-Boddy. Investment Appraisal.
1 Chapter 1. Engineering Economic Decisions. 2 Engineering Economics: Economic analysis for engineering and management decision making The term engineering.
Part III – Developing the Entrepreneurial Plan Chapter 7 – Environmental Assessment: Preparation for a New Venture Chapter 8 – Marketing Research for New.
Economic Analysis in the Public Sector Benefit/Cost Analysis.
© 2010 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Capital Budgeting and Cost Analysis
Lecture: 6 Course Code: MBF702
Capital Budgeting and Cost Analysis
Budget Balance and Government Debt
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
C h a p t e r 6 COST-BENEFIT ANALYSIS AND GOVERNMENT INVESTMENTS
Chapter 10: Evaluating Projects with the Benefit-Cost Ratio Method
Capital Budgeting Techniques
Presentation transcript:

Cost-Benefit Analysis and Government Investments Chapter 6 Cost-Benefit Analysis and Government Investments

Economic Analysis for the Budget Process: Achieving the Least-Cost Means of Accomplishing an Authorized Objective A Program is a combination of government activities producing a distinguishable output. Program Budgeting is the system of managing government expenditures that attempts to compare the program proposals of all government agencies authorized to achieve similar objectives. The mission of a government agency is comparable to a business firm’s product. Cost-Effectiveness Analysis is a technique for determining the minimum-cost combination of government programs to achieve a given objective

Cost-Effectiveness Analysis: In the Example of Saving Lives Cost-Effectiveness Analysis requires stating an objective (saving lives) recognizing the alternative means of meeting the objective (inoculations and smoke detectors) choosing the mix of alternatives that meet the objective in the least cost fashion

Figure 6.1 Cost-Effectiveness Analysis Inoculations per Year Smoke Detectors per Year A Lives Saved = 5,000 20,000 10,000 B 10,000 20,000

The Cost-Effective Mix At the point of tangency, the slope of the isoquant is equal to the slope of the isocost lines, and The MRTS, the marginal rate of technical substitution between smoke detectors and inoculations, depends on the marginal productiveness of each program. The cost-effective mix of the two programs depends both on their productivity in terms of lives saved and the prices of units of services provided by the programs themselves.

Cost-Benefit Analysis Enumerate all costs and benefits of a proposed project Evaluate all costs and benefits in dollar terms Discount future net benefits

Enumerating Benefits and Costs Direct Costs and Direct Benefits are those attributable to the purpose of the project. Indirect Costs and Indirect Benefits are those attributable to the project, but which were not part of the intended purpose of the project.

Evaluating Costs and Benefits in Dollar Terms Though some costs and benefits are easily quantifiable, others like s the value of a human life saved or lost because of a project, are not as easy to objectively count.

Discounting Future Net Benefits Present Value An interest-adjusted value of costs or benefits that will occur in the future PV of X dollars received in n years at an interest rate r is: PV = (X/(1+r))

Discounting Payment Streams

Illustrating the Effect of Interest Rate Changes on Present Value Project 1 yields $90 in net benefits immediately. Project 2 yields $100 two years from now. Results At 0% interest $100 two years from now is worth $100 so project 2 is better than project 1. At 5% interest $100 two years from now is worth $90.7 so project 2 is better than project 1. At 10% interest $100 two years from now is worth $82.6 so project 1 is better than project 2.

Choosing the Social Rate of Discount If the private sector interest rate is r, then the social rate of discount must be set equal to this social opportunity cost of funds because of the distortions in the market caused by government taxation. The rate must also account for the taxation on investment returns.

Figure 6.2 A Tax on Investment Income and the Social Opportunity Cost of Capital D = Gross Return S Return (Percent) Funds Invested and Saved per Year E’ I = 10 = rN 20 = rG E 16 D’ = Net Return After Taxes

Weighting Net Benefits It also matters who gets the benefits and who pays the costs. Benefits accruing to certain people may be viewed as more or less important than costs that accrue to others.

Disaggregating Net Benefits Disaggregating benefits according to demographic, income, and other social characteristics of those who will receive benefits and bear the costs allows cost-benefit analysis to take into account distributional considerations.

Treatment of Inflation If all dollar figures are nominal, then interest rates must be nominal and account for inflation. Alternatively, all accounting can be done using real dollars and real interest rates.

Ranking Projects Net Benefit Criterion: Rank according to the highest net benefits Benefit-Cost Ratio Criterion: Rank according to the highest ratio

Figure 6.3 Cost-Benefit Analysis and Efficiency Marginal Social Cost and Benefit Miles of Highway per Year DQ1 Net Social Gain from DQ1 MSC MSB C D Q1 B A Q2 H J G F Q3 Q4 DQ2 Q2 from D Net Social Loss Q* E

Cost-Benefit Analysis in Practice Physical Infrastructure Analysis Transportation Environmental Capital Schools Power and Communication Networks

Government Infrastructure Investment in LDC’s LDC’s have invested considerable sums in agricultural infrastructure because the estimated project rate of return approaches 17%. Projects like the creation of large water reservoirs typically displace locals and these costs (externalities) must also be counted. Projects have been shown to help the poor by adding substantially to their ability to produce crops for sale.

Cost-Benefit Analysis of a Hypothetical Irrigation Project   Year Costs 1 2 3 4 5 6 … N Engineering and Planning E Building and Construction F1 F2 F3 F4 F5 Maintenance M6 MN Loss in Agriculture A1 A2 A3 A4 A5 A6 AN Loss in Recreation R1 R2 R3 R4 R5 R6 RN Total Costs C1 C2 C3 C4 C5 C6 CN Benefits Increased Agriculture Increased Recreation Total Benefits B6 BN

Figure 6.4 The Benefits of Widening a Highway Average Cost per Trip Number of Trips per Year DT C B T A ' C T D

Value of a Human Life A number of techniques have been used to estimate the value of human life saved: A common method is to value lives according to the discounted present value of future earnings. The benefits of saving a life could be measured in terms of the willingness of individuals to pay for a reduction in hazards or risks to which they are exposed.

Cost-Benefits Analysis of Job Corps Program Costs per Participant Operating the Program ($8,380) Forgone Output of Participants ($1760) Benefits Per Participant PV of Increased output ($8,080) PV of reduced crime ($5,840) Reductions in costs of other programs ($880) Net PV of Benefits: $4,660

The Role of Cost-Benefit Analysis in Budgeting Useful tool to policy makers attempting to quantify decision making Some social benefits difficult to quantify Distribution of benefits affects the political decisions of which programs are funded.

Sports Stadiums Cost-benefit analysis often used by state and local governments to justify subsidies to such projects as sports stadiums and civic centers Supporters of sports stadiums argue that combined benefits of the community will more than offset costs. Prominent economists argue that the logic used by supporters of sports stadiums substantially overestimates benefits while underestimating costs.