MC Sprinkler, Rev H 11/20/081 Station1, 10 heads Station2, 4heads Station3, not connected Station4, in the woods, not in active use Station5, 7 heads Station4,

Slides:



Advertisements
Similar presentations
Reversible Gates in various realization technologies
Advertisements

ADT490 TroubleShooting Locating Grounds A. 2 Introduction ‣ Fire Alarm Panels cannot tolerate grounds ‣ A ground on any fire alarm circuit is detected.
Oakhurst CC Jon Christenson Golf Course Superintendent 2013 Fall Project Update.
1 Light 1 C 70” Project Layout AFF. AFF is the abbreviation for 2 1.After first fire 2.Above finished floor 3.Above flat floor 4.At first floor 5.Average.
MineralScan Lite Installation Guidelines Digital Control Lab, LLC NW 6 th Street, Suite F Gainesville, FL Main Unit power 90 – 240 VAC 50/60.
Medical Gas Alarm Panels
Using Surfcam to Produce a Numeric Control (NC) Program An Introduction to the CAD/CAM Process Instructions for 3 Axis Programming Using the D&M CNC Milling.
CS102--Object Oriented Programming Lecture 17: – Linked Lists Copyright © 2008 Xiaoyan Li.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Oct, 3, 2007.
EET Survey of Electronics Chapter 24 - Residential Branch Circuit Wiring.
Jan. 15, Safety Board Review (Rev D) Safety Board PCB Review (Rev D) Eric Warmbier.
Installation. Indoor Unit Installation Typical Installation.
Fulton-Montgomery Community College TEPP Technological Education Pathways PartnershipNSF DUE Clock Radio.
Resistors in Series Introduction Two types of current are readily available, direct current (dc) and sinusoidal alternating current (ac) We will first.
Paul Wolf.  Understand what turf grass is and what it is used for.  How to select an irrigation system.  How to install an irrigation system.  Maintaining.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
Service Bulletin 161 SUBJECT: Upgrade to current production level UNITS:D27105 DATE CODE RANGE: All units up to date code to be checked ISSUED.
+.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
The printed circuit board (PCB) design
Network Design Essentials
Overlap of multiple irrigations. 3-D Uniformity Simulation.
Narrowleaf Evergreens Unit 27 Horticulture. Features of evergreens  Generally remain green year-round  Are adaptable to various soil types & weather.
The Node Voltage Method
Reflection in Plane Mirrors Objectives: Investigate reflection in plane mirrors Verify the “1st Law of Reflection” Compare image location to object and.
Installation. Indoor Unit Installation Typical Installation.
Procedure of Connecting Coil Unit In series with Capacitor 10 April 14 Product: Fully Automatic Washing Machine.
Wiring Schematics and Circuit Testing
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Circuits Chapter 27 Copyright © 2014 John Wiley & Sons, Inc. All rights reserved.
Welcome to MM305 Unit 6 Seminar Larry Musolino
Electronic Circuit Diagrams
NETWORK TOPOLOGIES. NETWORK TOPOLOGIES THERE ARE BASIC FIVE TYPE OF NETWORK TOPOLOGIES.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Schematic Diagrams Schematic diagrams are used to graphically represent the components and interconnections of electrical circuits. Electronic schematics.
Purpose of design rules:
Credit: Baughman et al., Science 297, 787 (2002).
Chapter 6 Series and Parallel Circuits 1 of 81 MECH of 81 Chapter 6 Series and Parallel Circuits MECH1100 Topics Identifying Series- Parallel Relationships.
ADT490 TroubleShooting Locating Opens A. 2 Introduction Breakdown in Circuit Integrity -> Trouble Metallic continuity interrupted an “ open ” occurs System.
Ethernet I/O Set-Up This presentation will step through a typical configuration of the CON-DVT-IOE. Intellect 1.5 is used for the software portion. NEXT.
Window Washing – Our window washers have completed the North Tower building and have started work on the South Tower. Additionally, we are asking our window.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Connecting the cRIO to the 12 V power source and your computer
Step One The first step to designing a sprinkler system is to create a diagram of the area you wish to irrigate.
Based upon the book Rain Bird Irrigation Design Manual
The monitor The monitor is essentially a computer. The four inputs along the top are: Power, Voltage, Current, and an Ethernet connection.
Step One The first step to designing a sprinkler system is to create a diagram of the area you wish to irrigate.
Magnetic Fields due to Currents Chapter 29. The magnitude of the field dB produced at point P at distance r by a current-length element ds turns out to.
T. Hajer Brahim & T. Rania Alakazalah U.Y: 1435/1436 H.
Text2PTO: Modernizing Patent Application Filing A Proposal for Submitting Text Applications to the USPTO.
SERVICE TRAINING EXPERT ALPHASTAR 1132 © MAO-SE-TC 1132_SE_EX_Handout_EN_12_  Collision protection switch  Collision protection switch retrofit.
Looking east Above ground spa and wood deck to be removed and lines capped Wood fence to be reconnected Wood fence to be removed Patio cover to.
Network Topology Computer network topology is the way various components of a network (like nodes, links, peripherals, etc) are arranged. Network topologies.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
ATLAS Internal ID Service Integration
Installing Branch Circuits
What colour?.
2Wire Decoder-in-Solenoid
Network Topology Name: Dua'a Alfadhli ID: Section: 201
Lesson 4 Electricity Part 3.
The Electrical Diagram
McCrometer Nano Board Test Procedure
SW REV Position, DIFFERENCES ONLY SHOWN, L1 is the same
Consulting Captains, LLC
Any path along which electrons can flow is a circuit.
INC 111 Basic Circuit Analysis
Selecting sprinkler heads continued
Setting up of EVMs & VVPATs
2019 Investing Now Summer Program
Presentation transcript:

MC Sprinkler, Rev H 11/20/081 Station1, 10 heads Station2, 4heads Station3, not connected Station4, in the woods, not in active use Station5, 7 heads Station4, not used Nylander Way Main St. Figure 1: Sprinkler head locations Station6, not connected N

MC Sprinkler, Rev H 11/20/082 Station4, not used Nylander Way Main St. well shed Station1, 10 heads, 2 valves Not sure of exact layout of the two sections Station2, 4heads, 1valve Station3, not connected Station4, in the woods, not in active use Station5, 7 heads, 2 valves Station6, not connected Figure 2: Schematic view with approximate location of pipes and valves Blowout connection Valve Block 2. This is a schematic view, See Fig 3 for better view of physical location Valve Block 1 N Cable 1 Cable 2 Red wire Org wire ylw wire Grn wire

MC Sprinkler, Rev H 11/20/083 Nylander Way Main St. Figure 3: Location of Valves N Valve Block 1 Valve Block 2

MC Sprinkler, Rev H 11/20/084 Revision History Rev D --5/5/04 Computerize earlier paper sketches kpd Rev E 5/6/04 Change valve block to show only 5 valves, not 6. Even though programmer has 6 stations, Mill Corner system only has 5 valves. There are 6 covers in the ground behind the utiliy boxes but one is a cover for the blowout connection (not a control valve) Revision History and NOTES pages added. Kpd Rev F 8/5/04 Tim Rodabaugh and Greg from Valley Green visited Mill Corner and reviewed the system with Kevin Dalton. Fig2 has been updated to show the location of the water lines. Two lines cross Nylander near the big rock then circle around the outer perimeter of the school bus turnaround. This differs from the layout shown in Rev E, which was a guess and was wrong. Tim indicated that more sprinkler heads could be added, ie, the system has expansion capability. Notes on page 4 were modified. Tim indicated that the control of the RED circuit may not be a simple as is indicated in Fig2. There maybe be second valve that is activated when the control box programs STATION 1 ON. The existence of this valve is only postulated and its location is unknown. It might also involve valve 3 or 4. More investigation could be done here. For now, the RED circuit is shown in FIG2 as 2 branches in parallel both controlled by a single valve, # 1. kpd

MC Sprinkler, Rev H 11/20/085 Revision History Rev G - 5/31/06. Greg from Valley Green visited on Friday 5/26/06 to repair station 5 which was inoperative after recent sewer repair work near the turnaround. During this visit the existence of additional valves was confirmed. These valves were buried with no access covers. Greg added access covers. There was a vague valve reference in the 8/5/04 Rev F history note. These 2 newly discovered valves are near the control shed. One had been wired to station1 and its output connected to the flagpole spray head, aka 1.11 in Rev F. The other was/is wired to station5 and controls all the spray heads encircling the schoolbus turnaround. Greg has altered the connections. Greg connected these two valves in parallel to station 5, so that the spray head at the flagpole (formerly 1.11) is now 5.8. But the water line for 5.1 thru 5.7 is separate and unique from the line supplying 5.8. See fig 2. I am now calling this group of valves near the control shed, Valve Block 2. The group of valves on the west side of Nylander Way I am calling Valve Block 1. Although there are 5 valves (plus1 blowout connection) in Block 1, there are only 3 stations or control signals. Station 1 is connected to 2 valves in Valve Block 1 via the yellow wire of Cable 1. Station 2 is connected to one valve via the orange wire of Cable 1. Station 4 is connected to two valves via the red wire of Cable 1. There are two multi-conductor cables leaving the control shed. Cable 1 has 3 active connections (ylw, org, red, see above) and travels from the shed, toward the Big Rock, under Nylander Way, to Valve Block 1. Cable 2 has 1 active connection (green)and travels from the control shed south about 30 feet to Valve Block 2. Reference to Station 3 has been eliminated in this document. There are no valves which are wired to Station 3. Greg also fixed a leak in the blowout connector that may have been caused or exacerbated by the failure of station 5 valve to open (due to sewer work, see above.) kpd Rev H 11/20/08 In the Spring of 2008, repairs were made along the inner circle of the turnaround. At that time, spray head 5.7 was removed and the line capped in that location. This was done since 5.7 was buried under the pine trees and ineffective. Diagrams have been changed to delete 5.7 kpd

MC Sprinkler, Rev H 11/20/086 NOTES Since Summer of 2002, the system has been serviced by VALLEYGREEN LANDSCAPE PO BOX 489 CHELMSFORD, MA Karen -- Office Person Greg Knight -- Irrigation Tech Some portions of the existing system were installed by Kevin Sweeney (developer). The system was repaired and upgraded in Head 5.8 was added in The system was used very little between 1995 and Programming manual is available in the tractor shed and in the Mill Corner BOG files. The sprinkler control shed is locked to avoid vandelism. The combination is Kevin Dalton is available for consultation on the system.