BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate.

Slides:



Advertisements
Similar presentations
AACC Compatible Land Use Planning Series Series Includes Presentations from: FAA Airports Division – March 10 AACC Meeting Planning Department, Municipality.
Advertisements

US Army Corps of Engineers BUILDING STRONG ® Public Law 84-99, Rehabilitation and Inspection Program Mike deMasi Chief Emergency Management, PL Program.
U.S. Army Corps of Engineers - Levee Safety Program Engineer Circular Development US Army Corps of Engineers BUILDING STRONG ® Michael Bart, P. E. Chief,
MRWA 2013 ANNUAL CONFERENCE MAINE COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROGRAM.
Using Mitigation Planning to Reduce Disaster Losses Karen Helbrecht and Kathleen W. Smith United States: Federal Emergency Management Agency (FEMA) May.
US Army Corps of Engineers BUILDING STRONG ® 5/7/2015 Adopting National Standards for Tidal and Geodetic Datums Jim Garster US Army Corps of Engineers.
US Army Corps of Engineers BUILDING STRONG ® Vertical Team Roles & Responsibilities Planning Principles & Procedures – FY11.
Sacramento District Regional Vegetation Variance Paige Caldwell, P.E. Emergency Manager.
Central Valley Flood Protection Board Meeting – September 27,
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF DOE POLICY -- USE OF INSTITUTIONAL CONTROLS COLLEEN OSTROWSKI (202)
Flood Risk Management Program Ed Hecker, Chief, Office of Homeland Security National Levee Summit February 2008 St Louis, MO.
Emergency Relief for Federally Owned Roads (ERFO) U.S. Department of Transportation Federal Highway Administration December 2013.
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
Engineer Circular Requests to Alter USACE Projects
Module 23 STEPS 15 & 16 Preconstruction Engineering and Design (PED) and Other Decision Documents Civil Works Orientation Course - FY 11.
1 1 Roles and Responsibilities in the CDBG Program For Grant Administrators.
Dam Safety Program Management and Organization
Seattle District Seattle District U. S. Army Corps of Engineers U. S. Army Corps of Engineers.
USACE Levee Safety Program Presented by Tammy Conforti ASFPM Conference May 2008.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
NRCS Watershed Rehabilitation
Module 24 STEPS 17, 18, & 19 Project Implementation Civil Works Orientation Course - FY 11.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Federal Highway Administration Emergency Relief (ER) Program Brian Hogge Field Operations Team Leader July 2013.
Module 29 Interagency & International Support Program Civil Works Orientation Course - FY 11.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Module 11 STEPS 4 & 5 Conduct Reconnaissance Study & Report Certification Civil Works Orientation Course - FY 11.
Oconee County Hazard Mitigation Plan Update Kickoff Meeting Brian Laughlin Hazard Mitigation Planner Georgia Emergency.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers Watershed Authorities, Policies and Procedures Michael Greer Regional Technical.
Central Valley Flood Protection Board Meeting – December 20,
Rebecca C. Cory, PhD. Manager, Disability Services North Seattle Community College.
Corps of Engineers Levee Safety Program Levee Safety Program Manager
1 CDBG Roles and Responsibilities For Local Officials.
Developing a National Levee Safety Program Mike Stankiewicz - NCLS Arizona Floodplain Management Association November 3, Update on the National.
INTRODUCTION TO SECTION 4(f) Presented by Ian Chidister Environmental Program Manager FHWA – Wisconsin Division December 4, 2013.
World Association for Waterborne Transport Infrastructure (PIANC) and the International Environmental Commission Technical Seminar October 28, 2009 Westin.
National Levee Safety Act, Title IX, WRDA 2007 Update for Levee Summit Eric Halpin, P.E. Special Assistant for Dam and Levee Safety Headquarters, US Army.
Environmental Review Process for Responsible Entities 24 CFR Part 58 NEIGHBORHOOD STABILIZATION PROGRAM.
Michigan Protection & Advocacy Services, Inc. Assistive Technology (AT) in Special Education Mark McWilliams, Education Team Michigan Protection & Advocacy.
LEVEE PERMIT SUBMITTAL & REVIEW PROCESS. Federal Law CODE OF FEDERAL REGULATIONS TITLE CHAPTER II -- CORPS OF ENGINEERS, DEPT OF THE ARMY, PART.
Planning for Non-Routine Activities
Condition Assessment Of The Hurricane Protection System Larry B. Ardoin, P.E. DIRECTOR, HURRICANE PROTECTION OPERATIONS.
September 23, 2010 Overview of DWR’s Flood Management Activities Related to the Delta A Briefing to the Delta Stewardship Council 1.
Levee Inspections and Eligibility NWS Levee Safety Program Seattle District 23 APRIL 2013 Charles Ifft, P.E. Inspection of Completed Works Project Manager.
Office of Affordable Housing ENVIRONMENTAL ASSESSMENT REVIEW PROCEDURES FOR THE HOME PROGRAM BY: GEORGIA DEPARTMENT OF COMMUNITY AFFAIRS OFFICE OF AFFORDABLE.
Catharine Cyr Ransom Principal The Accord Group. Stafford Act Structured approach to disasters Partnership between local, state, Federal governments Authority.
Request to Alter USACE Projects
Christopher Knotts, P.E. Public Works & Water Resources Association of Levee Boards of Louisiana Annual Meeting December 3, 2015.
TOPSAIL BEACH 30 Yr Beach Management Plan June 8, 2011.
US Army Corps of Engineers BUILDING STRONG ® Emergency Response Policy Revision Update ( ER & EP ) Jeffrey Jensen CECW-HS USACE Flood Risk Management.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
U.S. Army Corps of Engineers Levee Safety Program US Army Corps of Engineers BUILDING STRONG ® December 2013 Update for the NAFSMA Annual Meeting.
Corps of Engineers BUILDING STRONG ® Interim Operating Pools Jerry W. Webb, P.E., D.WRE Principal Hydrologic & Hydraulic Engineer Hydrology, Hydraulics.
South Dakota State Historic Preservation Office and the Nebraska National Forests and Grasslands July 24, 2013 National Grasslands Visitor Center.
Central Valley Flood Protection Board Meeting – Enforcement Report 1.
BUILDING STRONG ® 1 Risk Management Center Silver Jackets Program Overview Jennifer Dunn USACE, Institute for Water Resources Silver Jackets Program Manager.
US Army Corps of Engineers PLANNING SMART BUILDING STRONG ® PCoP Webinar Series Section 7001: Preparing the 2017 Annual Report to Congress on Future Water.
 What is EWP & How Does the Program Work? Emergency Watershed Protection Program.
US Army Corps of Engineers BUILDING STRONG ® Miles City, Montana Section 205 Gwyn M. Jarrett - Project Manager Omaha District April 27, 2016.
US Army Corps of Engineers BUILDING STRONG ® 2011 Flood Recovery The Benefits of Collaboration Maria de la Torre Chief, Emergency Management Baltimore.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
AGENCY ROLES Level 1B: Advanced Fundamentals July 2016 LOCAL, STATE, FEDERAL 1.
K1 Proposed National Levee Safety Program An Introduction for the Tribal Assistance Coordination Group May 12, 2011.
US Army Corps of Engineers BUILDING STRONG ® Levee Safety Policies Supporting a Sustainable Flood Risk Management Program Eric C. Halpin, PE Special Assistant.
General Operations Limitation on Use of Funds Termination of Assistance Other Program Requirements.
Pipeline Safety Management Systems
Online Application Instructional Guide February 28, 2014
Adopting National Standards for Tidal and Geodetic Datums
System Safety Regulation
Presentation transcript:

BUILDING STRONG ® Levee Safety Program  Levee Safety Program Implementation Guidance provided by HQUSACE in 2007 (Post Hurricane Katrina) ► Designate Levee Safety Officer (LSO) – John Bertino, Jr., PE ► Designate Levee Safety Program Manager (LSPM) – Bryan Flere, PE ► Implement Levee Inspection Tool and Levee Inspection Checklist ► Create District National Levee Database (NLD)  Subsequent Levee Safety Guidance ► Vertical Datum (2006) ► Section 408 Alterations (2008, 33 USC 408 replaces 33 CFR ) Further guidance in July 2014 (EC ) ► Levee Screening Assessments (2009) ► System Wide Improvement Framework (2011)  As new guidance is issued by HQ USACE, levee sponsors will be notified how this new guidance will impact them 1

BUILDING STRONG ® Levee Inspections  Projects in the Public Law (PL) Rehabilitation Program (RP) get an Continuing Eligibility Inspection (CEI). ► Routine Inspection – every year Inspections are completed by Operations Project Office Personnel and Levee Safety Engineer (LSE) Reports are completed and reviewed by the Omaha District and then sent to sponsor National Levee Database (NLD) stores the data. ► Periodic Inspection – every 5 years, as funding allows - more comprehensive and rigorous than annual inspections. A team of engineers will perform the inspection.  Geotechnical  Structural  Hydraulic  Civil  Mechanical 2

BUILDING STRONG ® Levee Inspections - Purpose  The primary purposes of the CEIs are to prevent loss of life and catastrophic damages; preserve the value of the Federal investment; and to encourage non-Federal sponsors to bear responsibility for their own protection.  This program assures sponsor compliance with existing agreements, that the structures and facilities constructed by the United States for flood protection will be continuously maintained. ► I.E. – Culvert/Discharge Pipes: Video Inspected every 5 years, Relief Wells: Pump Tested every 5 years  Based on current policy, the CEIs are utilized to determine eligibility for PL Rehabilitation Assistance. 3

BUILDING STRONG ® 4 PL Rehabilitation Assistance  Rehabilitation Assistance is limited to Federal and Non-Federal FCWs that are in ACTIVE status (based on the Interim Policy) in the Rehabilitation Program at the time of the flood event and which are damaged by floods.  Federally constructed or enhanced & locally maintained systems (in PL program): Repaired at 100% federal cost  Non-federally constructed & locally maintained systems (in PL program): Repaired at 80 percent federal/20 percent local cost share.  Federally constructed or enhanced/locally maintained systems AND non- federally constructed or enhanced/locally maintained systems (NOT in PL program):Are not eligible for rehabilitation funds under PL *****Repairs can only be made to pre-event conditions. No improvements or enhancements with federal funding are authorized.*****

BUILDING STRONG ® 5 PL Rehabilitation Assistance  Sponsor Responsibilities: ► Provide without cost to the United States all lands, easements, right of way, relocation, borrow, and excavated disposal areas necessary for the authorized work, ► Hold and save the United States free from all damages arising from the construction, operation, maintenance, repair, replacement, and rehabilitation of work, except for damages due to the fault or negligence of the United States or its contractors, ► Operate, maintain, repair, replace, and rehabilitate the work after its completion.

BUILDING STRONG ® 6 PL Rehabilitation Assistance  Based on the October 2010 Periodic Inspection, the Pierce, NE FRRP system was determined to be “Inactive” in the PL Rehabilitation Program  INACTIVE levee systems can become ACTIVE by doing the following:  Repair deficiencies and ask for a reevaluation or  Go through the System Wide Improvement Framework (SWIF) process

BUILDING STRONG ® System Wide Improvement Framework  Policy for Development and Implementation of System- Wide Improvement, dated 29 Nov  Intended for projects that are “Inactive” in the Rehabilitation Program and ineligible for rehab assistance.  Now, with the System Wide Improvement Framework (SWIF), there is a process for which projects can stay temporarily active in the Rehabilitation Program, while the sponsor plans and works to correct the deficiencies.  A SWIF provides committed sponsors the opportunity to restore their levees, over time, back to USACE standards. 7

BUILDING STRONG ® SWIF - Process  Sponsor submits a Letter of Intent (LOI). It is reviewed and endorsed/approved at District, Division and Headquarters (HQ) level.  SWIF plan is developed by the levee sponsor(s) within 2 years of LOI approval.  The SWIF Plan is reviewed and approved thru HQ.  The SWIF Plan must identify funding sources and reasonable milestones to stay active in the Rehabilitation Program.  Inspections will continue during the SWIF process.  Continued eligibility throughout the process relies on the sponsor’s progress.  Stakeholders will be notified of participation and any status changes. 8

BUILDING STRONG ® SWIF - Process  Roles in the Process ► Sponsor/Community – Responsible party in the process ► Silver Jackets – Technical guidance & Information clearing house ► USACE PL84-99 Program – Technical Data & Programmatic Guidance Planning Authorities  FPMS  Section 22  Section 205  Section 1135  Silver Jackets Projects 9

BUILDING STRONG ® M ONTANA S PECIFIC I NFORMATION ► 13 PL84-99 Projects in MT (includes 3 dams and 1 NF) ► 9 Active – 4 Inactive ► 2 in the SWIF Process