Project Management Performance Measures. Project Performance Measurement The purpose of performance measurement is to help organizations understand how.

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
Project Management Shuffle Directions: take the definitions from the following cards and write a song using the tune from “Cupid Shuffle”
Systems Analysis and Design 9th Edition
Systems Analysis and Design 8 th Edition Chapter 3 Managing Systems Projects.
FASB definitions Allocation: is the accounting process of assigning or distributing an amount according to a plan or a formula. It is a broader term than.
1 Introduction to Operations Management Aggregate Planning CHAPTE R 12.
Project Cost Management Estimation Budget Cost Control
Systems Analysis and Design 8th Edition
Monitoring and Control Earned Value Management (EVM)
Software project management Module 1 -Introduction to process management Teaching unit 1 – Introduction Ernesto Damiani Free University of Bozen-Bolzano.
Object-oriented Analysis and Design
Systems Analysis & Design Sixth Edition Systems Analysis & Design Sixth Edition Toolkit Part 4.
Quantitative Techniques for Planning and Decision Making
Project Time Management
Degree and Graduation Seminar Cost Management
Income Measurement (Part 2)
What is Project Management?
Project Planning Basics Project: set of activities which ends with specific accomplishment (the goal) –Non-routine tasks –Distinct start/finish dates –Resource.
ANSI/EIA -748 EVMS 32 Guidelines National Aeronautics and Space Administration.
LSU 10/09/2007Project Schedule1 The Project Schedule Project Management Unit #4.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
XII- COST CONTROL, MONITORING & ACCOUNTING
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Project Control: Developing the As-Built S-Curves Part #3 June 26, 2002 Hide/Unhide Exercises.
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Full Costs and Their Uses
Using the Logical Framework to Develop Activity and Resource Schedules.
Management Control of Projects Management Control Systems Chapter 16 September 2014Iwan Pudjanegara SE., MM.1.
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Software Project Planning.
ACTION PLANNING APAMSA Leadership Development Module.
Introduction to Job Shop Scheduling Problem Qianjun Xu Oct. 30, 2001.
Common Activities Activities and Tasks in the WBS.
Project Management-Manufacture
Management & Development of Complex Projects Course Code - 706
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
Project Life Cycle.
CONSTRUCTION ADMINISTRATION Measurement and Payment Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
In the name of Allah the Most Gracious the Most Merciful.
Modeling Tough Scheduling Problems with Software Alex S. Brown Mitsui Sumitomo Marine Management (USA), Inc.
Iterative Development Royce, “Successful Software Management Style: Steering and Balance”, IEEE Software sep/oct Sp8Jan22iterdev2.
Copyright 2009 John Wiley & Sons, Inc. Chapter 10 Monitoring and Information Systems.
MEASURING AND FORECASTING COMPLETION. PROGRESS BY DISCIPLINE.
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Project Control: Work and Cost Versus Schedule Module: April 22, 2003.
Workshop 33: New Comparability Plans in 2015 Presented by Lawrence Deutsch, FSPA, MAAA, EA.
CHAPTER 7 – Managing Project Schedules. “Plan the Work” “Work the Plan” “Endorse the Plan” + 10% of Project effort + 90% of Project effort “Align the.
Iterdev2a 1 Iterative Development Royce, “Successful Software Management Style: Steering and Balance”, IEEE Software sep/oct 05.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Where Module 04 : Knowing Where the Project Is 1.
SOFTWARE PROJECT MANAGEMENT
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
The Project Management Process Groups
Fundamentals of Project Management and Schedule Development.
© Prof. Awad Hanna1 Productivity Measurement. © Prof. Awad Hanna2 Productivity Definitions and Measurements Productivity = or  Example : 0.27 Work-hours.
Project Management module
Project Monitoring
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Project Management MGT 30725
3. SYSTEMS DESIGN: JOB-ORDER COSTING
Chapter 4: Project Management
WHAT IS A GANTT CHART.
PROJECT MANAGEMENT AND CONTROL
Project Controls: As-Built S-Curves
By Dr. Awad Hanna Ross Umentum
Project Management Process Groups
Project management Learning Unit 5.
Project Cost Control.
Presentation transcript:

Project Management Performance Measures

Project Performance Measurement The purpose of performance measurement is to help organizations understand how decision- making processes or practices led to success or failure in the past and how that understanding can lead to future improvements.

Project Process Once the execution of the project starts, the project team must periodically report their progress on each task. Since the nature of each task varies, no single reporting method is suitable, and several methods of measuring progress are required. The six most common methods are presented in.

Methods of Measuring Work Progress 1. Units Completed 2. Incremental Milestone 3. Start/Finish 4. Supervisor Opinion 5. Cost Ratio 6. Weighted or Equivalent Units

Method 1: Units Completed Applicable to tasks that involve repeated production of easily measured pieces of work, when each piece requires approximately the same level of effort. Wire pulling is a task where accomplishment is easily measured in terms of linear meters of wire pulled. If the work for pulling a certain type of wire is contained in a single control account, the units completed method can be applied. Eg: 10,000 linear meters are to be pulled, 4000 LM have been pulled, Percent complete = 4000/10000 = 40%

Method 2: Incremental Milestone Method is applicable to any control account that includes subtasks that must be handled in sequence. The task is segmented into subtasks and each is assigned an increment of progress for the entire task. Completing a subtask is the achievement of a milestone. The milestone percentage is normally based, on the number of work-hours required

Example :

Method 3: Start/Finish Applicable where no intermediate milestones can be defined or where the effort/time required is very difficult to estimate. Examples include planning activities, cleaning, and testing. In the start/ finish approach, a percent complete is arbitrarily assigned to the start of a task, and 100 percent when the task is finished. For very short tasks, the start/finish percentages are usually 0 percent/ 100 percent.

Method 4: Supervisor Opinion Supervisor simply makes a judgment of percent complete. This is a subjective approach and should be used only for relatively minor tasks. Examples include temporary construction, architectural trim, and landscaping.

Method 5: Cost Ratio Applicable to long duration tasks or that are continuous during the life of a project, and which are estimated and budgeted on bulk allocations of money and work-hours rather than on the basis of production. Examples include quality assurance, contract administration, and project controls % complete = actual cost or workhours to date forecast at completion

Method 6- Weighted or Equivalent Units Applicable when the task being controlled involves a long period of time and is composed of two or more overlapping subtasks, each with a different unit of work measurement. Structural steel erection provides a good example of where this method may be applied.

Method 6- Weighted or Equivalent Units Structural steel is normally estimated and controlled by using tons as the unit of measure. However, each of the subtasks have a different unit of measure. Each subtask is weighted by task level of effort (usually work-hours) These weights are called "rules of credit.” As quantities of work are completed for each subtask, the quantities are converted into equivalent tons.

Example

Earned tons = (allowed credit) * (summary quantity) x ( quantity to date/ total quantity) Earned tons beams = (0.11) * (520 tons) * (45 each/859 Each) = 3.0 tons Percent complete = 82.5 tons / 520= 15.9%