Basics of Electric Vehicle Charging for the Workplace

Slides:



Advertisements
Similar presentations
© 2011 Chevron Oceanic Time Warner Cable Solar Project Brian Kealoha, Regional Manager Rebuild Hawaii Consortium April 5, 2011 Brian Kealoha, Regional.
Advertisements

Credit Cards. What is a Credit card? A plastic card that represents a line of credit A line of credit is an account with money that you can borrow repeatedly.
Get connected with GE EV Infrastructure Solutions Charging Ahead with GE David P Wang EV Region Sales Leader – NA
Transforming the local community: A Solar Electric and Vehicle Charging Station project.
Electric Fuel Infrastructure Presentation (Utah Clean Cities Coaliton) EPAct Fleet Workshop Coulomb Technologies, Inc. Eric Shieh
EVlink TM EV Charging Solutions Presented by Anita Purohit, P.Eng Product Marketing Specialist, Electric Vehicles Power Business – North America Schneider.
Clean Cities / 1 WESTERN WASHINGTON CLEAN CITIES COALITION The economics of providing workplace charging Scott DeWees Clean Cities Co-Coordinator
Emerging Lighting Technologies Roundup
ST PAUL’S WALNUT CREEK. ANATOMY OF A SOLAR SYSTEM ST PAUL’S CHURCH WALNUT CREEK.
Solar Energy : Here Comes the Sun!!! June 28, 2012.
Prius / Power / Energy Bob Bruninga Severn School Physics 21 Feb 2008
Smart Energy Campus September 16, Project Overview  Workforce Training  Solar PV  Solar Thermal  Small Scale Wind  Plug-in Hybrid Electric.
Technologies. About Us… EcoSpark Technologies is an enabler of energy infrastructure technology that specializes in the distribution, installation, and.
 A PHEV is a hybrid vehicle with batteries that can be recharged by connecting a plug to an external power source.  Features: › Internal Combustion.
Product History 1. Industry Evolution Notes, booklets No control Identify nothing No transaction data Location, time, quantities, price Duplications Wrong.
1 INTRUSION ALARM TECHNOLOGY LOCAL VS. MONITORING.
Phaseo Power Supplies ACE Expert Training Presentation 2009.
Clean Cities / 1 COALITION NAME Workplace Charging Challenge Presenter Title Date.
Workplace Charging Challenge / 1 Organization Name Workplace Charging Challenge Presenter Title Ambassador Organization Date.
MidNite Solar’s Pre wired solutions for Off Grid, Battery based Grid tie and AC coupled. MidNite Solar
Genesis Solar Module Brochure ™
Rob Bearman Global Energy and Utility Alliances June, 2010 Better Place Presentation to the National Town Meeting on DR and Smart Grid.
© Planetary Power, Inc All Rights Reserved. PRODUCT INTRODUCTION.
Plug-In Vehicles are Here, More are Coming major auto manufacturers with 10 production models over 20 production models Consensus - 3.
1 Plug-in Electric Vehicle Readiness For CMUA 11/8/2010.
Micro Controlled Cabin Lights Ron Acker EKU Dept. of Technology, CEN/CET.
Vehicle-Grid Integration (VGI) © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved.
Power Magazine Visuals © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. June 28, 2012.
© 2010 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T marks contained herein are trademarks of AT&T Intellectual.
Chapter 6 Consumer Credit
//plug-in ready michigan //powerpoint// made possible through the generous support of the U.S. Department of Energy plug-in ready michigan an electric.
Workplace Charging IFMA San Diego Lisa Chiladakis November 12, 2014.
Moderator: Bob Rosinski Company: EV-Charge America.
Gain control and visibility of your utility usage with smart metering Our scalable solutions and services enable the advanced monitoring and optimisation.
Confidential & proprietary M2M communications in Transportation industry.
1 Why Choose Solar? Solar costs are coming down Solar panels are getting better and better Electricity costs are rising Solar panels last +25 years.
Managing Public Charging Access August 6, What is Coulomb? Silicon Valley Company:  Founded in 2007 to develop Electric Vehicle Charging Infrastructure.
Industry Park & Ride Project Update. Industry Park & Ride Construction completed on time and under budget Parking structure opened to public on October.
R 0 G 169 B 224 R 79 G 45 B 127 R 207 G 0 B 114 R 199 G 172 B 150 R 237 G 41 B 57 R 194 G 172 B 190 R 41 G 153 B 38 R 254 G 209 B 0 R 225 G 216 B 183 Sustainable.
Akhil Jariwala Prepared for California Energy Commission Workshop December 7, 2015 California EV Infrastructure Update.
1 COALITION NAME Workplace Charging Challenge Presenter Title Date.
Earth Day 2016 Energy, Water, and Climate Initiatives at GSAM April 6 th, 2016 Ryan Ollie, CMVP, EIT Manager of Energy Solutions Advocate Health Care.
Towards Sustainable Mobility part of Swedish ICT Towards Sustainable Mobility enabled by information and communication technology Jonas Didoff Project.
Solar on Grid Systems 123 Zero Energy. If you need an affordable solar energy solution for transforming your home into a Zero Energy Home, the solar Grid.
Program Overview Solar resource will be built by j uwi, (pronounced “you-vee”), a developer based out of Boulder, Colorado. Solar farm will be located.
Solar Power Systems The savings from utilising solar power.
KCP&L will design and install a network of more than 1,100 EV charging stations (2,200 plus charging ports) Infrastructure sufficient to charge.
EVSE Technology, Deployment, and the Grid Richard Raustad, Program Director Electric Vehicle Transportation Center EV Summit Cocoa, FL October 21, 2015.
Workplace Charging: A How-to Guide
Solar Water heating System information card
Electric Vehicle Industry
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
Take a guess to win candy…
Linda Grave Director Charlie O’Donoghue Technical
Scene 1: Show EV cars charging in a city
CONTRIBUTE TO THE ENVIRONMENT THROUGH SOLAR POWER INSTALLATION Solar Earth Inc Website:
Product Description and Specifications
Solar panel installation in Oakley ca Element Power Systems is a fully licensed and insured California State Contractor --
Crescent City Harbor District Solar Project Proposal
Meeting Your Renewable Goals
Rose Drive Friends Church Solar Project Proposal
Park Encinitas HOA Solar Project Proposal
Ions for EV Understanding the spread of Electric Vehicle (EV) charging stations in Seattle's Capitol Hill area.
PEV-Grid Coordination David P. Tuttle, Ph. D
Solar Opportunities in Ontario
Safe, cost effective, simple, smart and green!
Public Charging Infrastructure Fast & Rapid + Access
SMUD Commercial EVSE Programs
SMUD Commercial EVSE Programs
Charging Electric Vehicles
Presentation transcript:

Basics of Electric Vehicle Charging for the Workplace EV Charging 101 Basics of Electric Vehicle Charging for the Workplace August 25th, 2015 Jin Park EVlink Charging Solutions, Schneider Electric Jin.Park@Schneider-Electric.com

Courtesy of Clipper Creek Power considerations J1772 CHAdeMO CCS Combo J1772 Level 1 110V - 120VAC 1P, 15A, 1.4kW - 1.8kW Level 2 208V - 240VAC 2P, 15A-80A 1.8W – 19.2kW Level 3 50-500VDC (200-600VAC In) 3P, 120A 20kW - 90kW Courtesy of Clipper Creek Three types of charging depending on time to charge and input power Level 1 – slowest of all. Comes with the Car. 8-12 hrs Level 2 – most popular. Faster charge. Home Workplace. 4-8 hrs DC quick – fastest charge available. Less than 30 min. CHAdeMO = Nissan Leaf and Mitsubishi vehicles CCS Combo = Combined Charging System (use single port for Level 1, 2 and DCFC) = Chevy Spark and BMW i3 BEV Full Charge ~12-16hrs 2-5 miles per hour BEV Full Charge 4-6hrs 10-20 miles per hour BEV Full Charge ~30mins 50-70 miles per 20 mins

Networked vs. Non-Networked? Who will be able to charge at your stations? How do you want them to access it? Planning to “charge” for charge? Need to track energy usage or reporting capabilities? Who will you maintain your station(s)? How? Networked Network subscription plan Automated payment processing, usage tracking, reporting etc. Ideal for Public charging. Divers can locate stations and access using credit card or network-card. Easier to manage pricing and station health Non-Networked Low cost; no annual fee RFID for access control Ideal for Private charging; for defined user-base. Simple for drivers, and station owners.. Does your customer want a basic or connected station? Use this slide to help them decide what best fits their needs.

DCFC Landscape 2015-Q1

Installation Considerations: Wall vs. Pedestal Closest to electrical service panel vs. Main Entrance Select panel that can accommodate additional stations, and consider pre-wiring Save on footprint with dual- connector models; consider installing at the “cross” btwn 4 spots Consider solar car-ports for off- grid tied solutions Wallmount delivered significant savings at our Carrollton, TX office  $6k vs. $1k for installation of one-dual level 2 EVSE including bollards Closest to electrical service panel vs. Main Entrance Select panel that can accommodate additional stations in the future; consider pre-wiring while work is already being done Save on footprint with dual-connector models; consider installing for 4 spots at the “cross” Consider solar car-ports for off-grid tied solutions

Installation Tips: Before wiring: check reception; consider signal repeater/booster if needed Don’t forget “activation & commissioning”; some networked stations will not charge until this step is performed. Signage with metal signs and/or asphalt paint on parking spots; and bollards. EVSE hardware/wiring installation is straight forward for any electrical contractor; best to engage a contractor already be familiar with your infrastructure (saves you more time and money); simply give them a copy of the installation guide.. Point them to where you’d want to install… and ask them to provide quotes /recommendations Don’t forget about “Activation & Commissioning” (which is connecting and activation station on the network, your “part II” of install following electrical); best to inquire about this service from EVSE provider. For Example, Schneider offers this in our Prime Service Package as a bundled deal with a 3yr pre-paid network subscription plan. Signage with metal signs and/or asphalt paint on parking spots serve dual functions – 1) helps EV drivers easily locate charging, 2) helps EV drivers from getting “ICEd” by clearly marketing EV-Charging-Only dedicated spots.

Do I “charge” for charge? Public: 63% Free, 37% Paid Private: 76% Free, 24% Paid More public access vs. Private

Thank you! Jin.Park@Schneider-Electric.com