Meter Reads-Optimum Calling Process Project Number 0307-23-001 Black Belt Rob Zinsky Northeast region.

Slides:



Advertisements
Similar presentations
SHOP LOGIC MANAGEMENT SYSTEM
Advertisements

Commercial Finance Group A/R Program for The Banker Do you need to collect a clients A/R ? Does your (otherwise) good client need Credit Management and.
Accounting for Receivables
A3 PROBLEM SOLVING TOOL: Date: Contact: SOLUTIONS / COUNTERMEASURES What solutions will solve the root causes? (Tools: Brainstorming and Affinity Diagram)
Ledger Size DEFINE / BACKGROUND INFORMATION Problem Statement: Goal OR Objective: Scope (if needed):  Problem Statement  Project Scope  Goal Target.
Six Sigma Foundations Continuous Improvement Training
Project Storyboard Template
Home Work #7 Dr. Yan Xiong. The Central Copy Center (CCC) ending cash balance for October was $9, The owner deposited $ on October 31 that.
Lecture 6 Functional Business Systems. Objectives Functional Business Systems: –Marketing Systems –Manufacturing Systems –Human Resource Systems –Accounting.
Supercharging DMAIC IT’S TIME TO USE THE POWER OF THE COLLECTIVE MIND.
Barry Murash MBBit Nortel 2007
Module 3: Business Information Systems Enterprise Systems.
Small Farm Profitability: Is Wind Energy the Answer? 1
How to Write a (USABLE) Performance Metric Dan Tobin, CPPS, FAA & Kim Doner, CPPM, SRA International 1.
Implementing POS at LVHN The Ups and Downs Lynnette Clinton – Manager, Rev Cycle Systems Tricia DeBlass – Subject Matter Expert Stephanie Erwin – Systems.
1 Smart Ways To Use Billing Innovations To Better Serve Your Customers Elie J. Boudreaux III, P.E. - Director of Utilities Fort Pierce Utilities Authority.
Black Belt Project Storyboard Template
Chapter 11 Accounting for Receivables Percentage of Sales Method Balance of Selected Accounts at Year-End (Before Adjustment) Accounts Receivable.
Items Required for Process Hand-off
Accounts and Bills Receivable Chapter 8 HORNGREN ♦ HARRISON ♦ BAMBER ♦ BEST ♦ FRASER ♦ WILLETT.
Project Selection Process Copyright OpenSourceSixSigma.com 1 OSSS LSS Black Belt v9.0 - Control Phase Project Selection Training Materials.
Unit 8 Estimating Bad Debts.
2011 AMC INSTITUTE COMMUNITY CONFERENCE “ACCREDITATION - IT’S ALL ABOUT BEST PRACTICES” Suzanne C. Pine, CAE AMC – National Accounts, PCVB AMCI Accreditation.
REDUCTION OF OUTBOUND FREIGHT COSTS - EQUIPMENT Black Belt - Nicole Brannon Champion - Tony Martino MBB - Art Girard FA - Diane Brightwell.
Copyright © Six Sigma Academy International, LLC All Rights Reserved Executive Case Study Credit Card Declines.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 15 Accounts Receivable and Uncollectibles.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
THE FOSTER GROUP TFGTFG City of Detroit Water and Sewerage Department Wholesale Customer Rates Meeting Water Supply System Meeting #3 – Allocated FY
Systems Analysis And Design MIST 4620 Fall 2002 Professor: Dale Goodhue.
Assets Returned From Lease Project: Bill Cody Black Belt September 25, 2003.
Inconsistent Administration of Sales Commissions Status Report August 28, 2003 Norcross, GA.
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Operations/Northeast BU – Steering Comm Presentation.
IT Asset Reassignment / Moves David Levine Information Technology IKON Network Center.
Project Update Effective Product Launch Vendor Integration Inga Broerman Black Belt Marketing - Corporate.
Contract Setup Accuracy Project Black Belt: Rob Vaughn Week 2 Presentation Define and Measure Phase.
Canon Strategic Marketing Plan - Supply Credits
Working Capital - > 90 Day Delinquency Project – Heath Peacock Finance Tempe, AZ - CCC.
Meter Reads-Method Project Number Black Belt Rob Zinsky Northeast region.
Product Promotions Effectiveness Chris Tantakis Canada.
David Pasquarello Ikon Office Solutions
Assets Returned From Lease Project: Bill Cody Operations Columbus OH.
Six Sigma Black (& Blue) Belt: Jeanette Wall. Unapplied Cash-Calculation Error Jeanette Wall Operations Location- Company-wide CANCELLED!
Contract Termination/ Save the Customer Accountability Black Belt-G.K. McCown Service Division BU – Dallas, TX.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Service Productivity- Parts Project # Black Belt – Rich Capasso Northeast Region.
©2013 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Unapplied Cash: eIKON Dealer Compensation Joyce Darson NE Region CCC.
Sales Turnover Project: Sharon Smith Black Belt Salt Lake City, UT.
Illuminating Britelite’s Internal Services for Success Strategy for Process Improvement.
Manufacturing Solutions- Knitting TexManage. Knitting Functional Flow Receipt of Orders Generation of Internal Order Yarn Requirement Allocation of Machinery.
Collections Accountability Leases that Terminate into Term Code TMDCR Tom Merry October 23, 2003 Week 4 Presentation.
Assets Returned From Lease Project: Bill Cody Black Belt Week 3 Report Out.
Deal Approval Process Project # &
Inaccurate Cycle Billing Records in OMD - Northeast Black Belt: Jim Palmer Division: Northeast BU – Forecasting/Service/ Revenue/Base/Type of Machine.
Contract Setup Project Black Belt: Rob Vaughn Week 3 Presentation Houston, TX.
Unapplied Cash – Canon & Ricoh Credits, Discrepancy in System Project # Black Belt - Jonathan Williams Division- Service/ Order Entry/Vendor.
Collections Accountability Leases that Terminate Following Automatic Renewal Tom Merry September 24th, 2003.
Meter Reads- Web Meter Effectiveness Project Number Black Belt Cathy Delvalle Atlanta CCC.
STRATEGY IMPLEMENTATION Chapter 7. FUNCTIONAL STRATEGIES These are made up of day to day decisions made at the operating level of the firm, often performed.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
Accounting: What the Numbers Mean Study Outlines and Overhead Masters Chapter 5.
Chapter 12 Extending the Organization to Customers.
A cross functional team was formed to review the current revenue protection process, the potential impact due to the implementation of Smart Metering.
Lean Six Sigma Road Map Improvement Process Road Map
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
VAR Partner Program Value Added Reseller
Central Puget Sound Regional Fare Coordination System
Order-to-Cash (Project-Based Services) Scenario Overview
MANAGEMENT ACCOUNTING The Activity-Based Costing System based on John G. Burch, Cost and Management Accounting Materials prepared by Ph. D. Zofia Krokosz-Krynke.
Validation by Process Owner Validation by Project Leader
Presentation transcript:

Meter Reads-Optimum Calling Process Project Number Black Belt Rob Zinsky Northeast region

2 Project Definition n Problem Statement: Meter collection performed by the various methods within IBS - call, web, fax, IVR, technician, 3rd party, vendor download, or AMR - are not meeting expectations. Meter collection agings reflect 34,500 meters uncollected, resulting in $5-6M in base billing revenue not being generated on a timely basis. This project will focus on the optimum method for the calling process. n Project Objective: To improve meter collection utilized for billing on a daily basis from 38.5% to 50% and increase the calls made on a daily basis from 65 to 100. This project will additionally focus on which meters to call on. n Project Benefits: Timely revenue billing, reduced unbilled contracts, improved cash flow and customer satisfaction while reducing customer calls into the CIT. Accountability Inspection Measurement

3 Big Y/Primary Metric n Y 1 Increase the number of meters collected daily. n Y 2 Increase the number of calls made daily.

4 DPMO for Percentage Collected

5 DPMO for Calls Made

6 Meter reads August (Atlanta)

7 Meters Reads August (Houston)

8 Meter reads needed by date Houston

9 Time Series Plot Houston Meters Needed Houston Meters Collected

10 Meter Collection Capacity n Number of Agents working on Meter Read Collection = 29 n Average Call Time for Successful Call = 5.5 minutes n Average Call Time for Unsuccessful Call = 3 minutes n Percentage of Successful Calls = 35% n Number of Calls that can be made per day per agent = 104 n Total number of expected successful calls = 29*40 = 1160 n Maximum time was consumed by customer on meter read recording (4 minutes average) n Number of meters that can be collected per month = Based on Houston CCC, sample size = 150

11 Current Meter Read Process

12 Scorecards Contracts Metric ReferencePrior WeekDate at beginning of measure mentEnding ##8/48/58/68/78/8 # Missing Meters Current* 1,2453,4082,1111,7701, # Missing Meters Past Due* 8,7827,1046,9686,8236, # Missing Meters (Oracle) 10,02710,5129,0798,5938,4818,472 # Florida Missing Meters Current* 1725,1274,8874,5464, # Florida Missing Meters Past Due* # Total Missing Meters19,03210,22115,66513,96613,13912,82911,837

13 Detailed Process Map

14 Detailed Process Map

15 High Level Process Map w/ X’s & Y’s

16 Detailed Process Map

17 Cause & Effect Matrix

18 Cause & Effect Matrix Results

19 Fishbone Diagram

20 FMEA

21 Average Cycle time for Collection

22 Time & Motion Study

23 Aging Contracts Comparison Bad Contact

24 Meter Read Aging Analysis Based on Atlanta CCC for the month of August, 2003 Current Proposed Oct.

25 Unbilled Root Causes Current Read, prior billing issue

26 Related Recommendations n Facilitate faster customer search for getting meter reads by posting meter “Flash cards” n Service technician “On site Customer” training n Enable estimations on all non-vendor contracts with selective exclusion capabilities n Groundwork for meter collection by Sales Force n Customer Orientation n Identification of contact, contact points for meter collection

27 Meter Collection Campaign n Prioritization decision parameters: n Estimation allowed n Contract Start Date n Availability of Average Daily Copy Volume (ADCV) n High Average Daily Copy Volume (results in erroneous estimation) n Base billing Amount n Key Accounts n Specific customer requests n Available meter collection capacity (time/manpower) n Final meter collection on contract terminations/upgrade n Number of equipment on contract n Machine Segmentation and color n Parameters change over time due to addition of contracts, equipment, product rollouts, consolidation etc.

28 Potential X’s n Generate a “Must Have” missing meter data based on prioritization parameters and distribute in a timely manner n Generate Total Meters list needed in the beginning of the month n Ranked Collection Campaign n Oracle Screens n Clean up unbilled list n Structured Meter Teams n Daily Inspection n Parameters change over time due to addition of contracts, equipment, product rollouts, consolidation etc., need flexibility

29 Training Thoughts n MR employees Why is it important, how to sell alternate, follow up training, SOP’s and SPIFFS. n Sales & Service Why and how, possible SPIFFS, training for our customers and ground work for collection of contacts and possibly reads.

30 Next Steps n 2 Sample t test n Design of Experiment n Clean Up Unbilled n Collect Detailed Data on X’s n Implement Quick Hits