“Status of the Loran Recapitilization Project” FAA Team Meeting – July 2002 CDR G. K. Weeks Jr., U. S. Coast Guard, Commanding Officer USCG Loran Support.

Slides:



Advertisements
Similar presentations
1 Loran-C Maintenance Support Presentation at the 31 st Annual Convention and Technical Symposium of the International Loran Association October 28, 2002.
Advertisements

Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
The South Carolina Corps of Cadets School Year
U.S. COAST GUARD NAVIGATION CENTER FY 2003 LORAN PERFORMANCE LCDR MAX CARUSO, NAVCEN OPS.
Welcome to the Class of August Mission The Citadel’s mission is to educate and prepare graduates to become principled leaders in all walks.
NETS Network Upgrade!.  304 Telecommunication Outlets (TO's) each with 4-copper and 4-fiber connections were installed.  255,000 Feet of CAT6A copper.
Provide and support mission ready Arctic Warriors from America’s premier Joint Base community 673d Air Base Wing Leadership Update JBER-Richardson Housing.
The Game Plan for Loran-C Modernization John J. Macaluso U. S. Coast Guard Mitchell J. Narins U. S. Federal Aviation Administration International Loran.
LORAN C UPDATED: April 14, US EAST COAST CHAIN 1957 – 1965 MARTHA’S VINEYARD 41 20N – 70 49W Y CAROLINA BEACH Present N.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
1 EARLY SKYWAVE EXAMPLES FROM U.S. COAST GUARD PRIMARY CONTROL MONITOR SET DATA KIRK MONTGOMERY, U.S. COAST GUARD NAVIGATION CENTER BOB WENZEL, BOOZ, ALLEN,
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451 – 24 Hours/ 7 Days a Week  Al McMath at (757)
V-1 TFE: The New Heartbeat of Loran T. P. Celano, Timing Solutions Corporation LT Kevin Carroll, Loran Support Unit.
A Preliminary Study of Loran-C Additional Secondary Factor (ASF) Variations International Loran Association 31st Annual Convention And Technical Symposium.
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers DCS Help Desk at or 7451 Contact Phil Whaley at (757) or Al McMath at.
October 29, 2002 International Loran Association Design and Test of the First Article Accufix 7500 Transmitter Presented by Mark Danieli.
New Timing and Control Equipment At LSU Wildwood, NJ.
Montgomery County, Maryland DTS CMMI Approach & Implementation Mike Knuppel 03/20/2006.
Computer Society Consolidation (EM0020) 19 July 2005.
ATEC BRAC Update 12 May Days Remain To BRAC End-Date 15 Sep 126 Days Remain To ATEC Ready Date 1 Aug (T) Provide our employees with BRAC execution.
Welcome to the Class of August The Mission The Citadel’s mission is to educate and develop graduates to become principled leaders in all.
LORAN TRANSITION Briefing to National PNT Advisory Board Captain Curtis Dubay, PE Department of Homeland Security U. S. Coast Guard Friday, October 5,
NOAA COMMAND AND DATA ACQUISITION STATION. WCDAS Numbers  DCS Help Desk at or 7451  Contact Phil Whaley at (757) or Al McMath.
1 Loran-C User Position Software (LUPS) Navigation Performance with the August 2001 Cross-Country/Alaska Flight Test Data Jaime Y. Cruz and Robert Stoeckly.
Status – U.S. Maritime Backup Issues Session 2, 28 October 2002 –Status & Plans of LORAN-C Service Providers 31st Annual Convention & Technical Symposium.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N Loran Update Mitchell Narins (US FAA) G. Thomas Gunther.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
Transmitter Performance Section Participants –LSU –NAVCEN –NAVCEN (West) –Peterson Integrated Geo-positioning, Inc –BAH LORIPP Meeting #2 Portland, OR.
LORAN Modernization Loran Data Channel Mr. Raymond Agostini International Loran Association Orlando, FL October 15, 2007.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
Modernizing Loran Command and Control U.S. Coast Guard Loran Support Unit Pacific Ave. Wildwood, NJ Raymond Agostini James R. Betz International.
Anonymous | Secure | User friendly
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Data Collection Effort Objectives Time of Transmission (TOT) monitors Time of Arrival (TOA) monitors Pulse Analysis Measurements re UTC, & sign of delay.
Jan 2016 Solar Lunar Data.
Michigan National Guard CBRN Response Exercise NORTHERN EXPOSURE 17 Overview June 2017.

Colorado Plugfest Planning
May Jun Jul Aug Sep Oct Nov Dec Today Material Available
May Jun Jul Aug Sep Oct Nov Dec Material Available
Change Network Timeline
Average Monthly Temperature and Rainfall
Broward County Consolidated Communication Committee Update
2018 Flag Calendar Online Registration is open





2018 Flag Calendar Online Registration is open
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
ESS Project Status Roland Garoby – Technical Director August 2018.


Towle Stadium C-4632 Facility is utilized for: Ultimate Frisbee, 4 on 4 Flag Football Tournament, Unit Level Soccer, Unit Level Flag Football, Turkey Bowls,
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Ctclink executive leadership committee May 31, 2018
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3

2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
ATEC BRAC Update 154 Days Remain To 109 Days Remain To Cleon Raynor
MAPUTO PORT DEVELOPMENT COMPANY IT Projects Update Order to Cash - Completion of system development - User Training - Go Live (July 2018) - Post.
Presentation transcript:

“Status of the Loran Recapitilization Project” FAA Team Meeting – July 2002 CDR G. K. Weeks Jr., U. S. Coast Guard, Commanding Officer USCG Loran Support Unit

TTX (11 US) SSX (13 US) NSX (1 Pending) LSU (SSX, TTX, NSX) Control Site (2 US) PCMS Site (24 US)

Transmitting Sites Completed - Cesium Installs (24 US, 2 Canadian) - TTM Installs (Master Stations) - ABS Installed (29 station, 24 US online)

Loran Station Timing and Control Equip. LORSTA Equipment…. Timing and Frequency Equip: uFirst Article Testing Ongoing at LSU u First Production Units Oct 2002 u First Install, George, WA Nov 2002

Loran Station Operations Room UPS OPS Room UPS:  All SSX Installs completed. u LorSta George completed. u Installation at rest of the TTX sites will start after X.25 to Frame Relay transition is completed (Spring 03).

Loran Station Transmitter UPS Transmitter UPS: u LSU Baseline completed  Jupiter Inlet, partially completed, transformer install pending u Malone and Raymondville completed. u George completed u Grangeville, 23 Aug 02 u Carolina Beach, 20 Sep 02

Loran Station Transmitter (circa ) Replacement Transmitters New SSX Transmitter: u Factory Acceptance testing at Megapulse 12 Aug 2002 u LSU install Sep 2002 u George install to be completed Thanksgiving, 2002 u Kodiak back on the schedule for Summer 2003.

Loran SSX Switch Gear New SSX Switchgear:  Installed at LSU and LorSta Grangeville u Lorsta Jupiter and Carolina Beach scheduled for Sep 2002

Loran Station Remote Automated Integrated Loran (RAIL) RAIL:  5 LorSta’s participating in Limited Installation testing.  O’Scope Cards contract awarded Deliveries started arriving  Routers finally onboard LSU  Final Form Rail in FAT

Network Transition X.25 to Frame Relay LORSTA Equipment…. Routers: u Sprint terminating X.25 services by Jun 2003 (Dec 2002…) u MCI Worldcom selected to provide Frame Relay for Loran u Installations at the two control sites (NAVCEN & NAVCEN Det) and the 24 US PCMS sites slated to begin August 2002.

Loran Station Casualty Control Receiver LORSTA Equipment…. Casualty Control Receiver:  Locus LRS IIID u Installed at 5 stations George, Seneca, Jupiter, Carolina Beach and Grangeville u Resolving Master station auto-naming problem found at Seneca u Remaining receivers to be installed with final form RAIL installations

Loran Towers LORSTA Towers  Tower Study Completed  Critical: Port Clarence (1350’) PP estimates earliest possible move to Nome as

Monitor Sites (PCMS/SAM) Completed - 29 PCMS Sites (24 US, 5 Canadian) Locus LRS-IIID All-in-View Receivers

“Status of the Loran Recapitilization Project” Points of Contact: CDR G. K. Weeks Jr., USCG Loran Support Unit, Mike Campbell, USCG Loran Support Unit, LCDR J. Boyer, USCG Loran Support Unit,

Loran Station HP-5071A Oscillators LORSTA Equipment…. Cesium Clocks:  Installed at all US & 2 Canadian stations

Primary Chain Monitor Set (circa 2000) PCMS Equipment  29 Locations (24 U.S. & 5 Canadian) Installed and operational.