Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager

Slides:



Advertisements
Similar presentations
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 186 January Assumptions No provision for TMA, Tax or Exit re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
SGN’s April 09 Mod 186 Report DCMF Meeting – April 27 th 2009.
Mod 186 July Assumptions No provision for TMA or Tax re-openers at this time (zero value in 2009/10 expected). AQ Review impact in October 2009.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
User Pays Funding – Potential Licence Mechanism Simon Trivella – January 21 st 2010 Governance Workstream.
UK GAS DISTRIBUTION DN Charging Methodology Forum NGGD Oct-14 Mod0186 Dave Chalmers / Mike Lapper.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
EHV generation charging methodology change Harvey Jones.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Customer Charge On behalf of all DNs 25 October 2010.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
SGN’s July 09 Mod 186 Report DCMF Meeting – July 27 th 2009.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
DN Interruption Reform (UNC Mod 90) Liz Spierling Commercial Manager, Transportation.
Mainline Service and Pricing Settlement Presentation to the TTF April 6, 2001.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach 20 November 2013.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
1 Modification 0152V Implementation Matters 25 October 2007.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Background Current balance of LDZ System and Customer charges
Accompanying Narrative
DCMF Meeting – January 26th 2009
Narragansett Electric Rate Classes
Gas Distribution Charging
User Pays Funding – Potential Licence Mechanism
Mod 0621 Amendments to Gas Transmission Charging Regime
LDZ System Charges – Structure Methodology 26 July 2010
NTS Entry Charging Review Update
Danishtah Parker 0621 Workgroup 26 April 2018
DNPC06 From 1 October 2012 the DNs will pay the NTS Exit Capacity charges to the NTS and recover the cost from shippers DNPC06 put forward for consultation.
Questions for Consultation
The Proposals Restructure the LDZ system charges target capacity/commodity split from 50:50 to 95:5 Introduce partial capacity charges for Interruptible.
Presentation on behalf of all DNs Lorraine Goodall - SGN
Mod 0621 Amendments to Gas Transmission Charging Regime
UNC Transmission Workstream 7th December 2006
Overview of RbD Risk Modelling 31 March 2008
Presentation transcript:

Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager

Context- Obligations  Changes to Prices take effect from the 1 st Oct this year and then from the 1 st April from 2009  DNs required to provide 150 days indicative notice and 2 months notice of the actual charges [1 st February 2009 for April Price year]  The transportation charging methodology is required to achieve three objectives : (a)cost reflective! (b)account of developments in the business (c) facilitate competition

Context- Obligations continued  DNs have incentives to recover their Allowed Revenue within the Formula Year (April – March).  The value of K brought forward is penalised if the DN materially over or under recovers. Furthermore, DNs have Licence Obligations that prevent them for setting charges to deliberately over-recover.

Maximum Allowed Revenue – 2008/13 MRt = Zt + Ft + EXt + MSRAt + Sht – Kt + EEt + DRSt + IFISDt + LMt Maximum Allowed Revenue Core Allowed Revenue Cost Pass thru’ items Exit Incentive Adjustment Mains & Services Replacement adjustment Over / Under Recovery b’f Shrinkage Incentive mechanism Environmental Emissions Incentive Discretionary Reward Scheme Loss of Meter work Revenue Driver Innovation Funding Incentive for Sustainable development Scheme New Incentives / Adjustments  In order to set prices DNs must first estimate their Allowed Revenue and the associated risk has increased following the 2008/13 PCR and price setting timescales  The majority of the value is known in advance (i.e. core revenue)

Incentive / adjustment forecasts  But!  MSRA (formally DNMRA) materiality Increased, forecast accuracy within DNs control  Shrinkage also significantly increased but beyond DNs control  New incentives and re-openers could be material  Loss of Meter Work (uncertainty around timing)  Innovation Funding (materiality is low)  Environmental Emissions (materiality is low)  Discretionary Reward (probably known in advance)  ® Tax (this change alone could increase prices by ~ 10%)  ® TMA (when does it come in and how much?)  ® Exit Reform (value and how its passed onto Shippers)

Demand forecasts  Commodity charges reflect the costs associated with flow of gas through the network. We need to predict future demand which largely depends on Weather.  Reconciliation charges reflect the commodity charge difference between allocated and reconciled volumes. This is unpredictable and depends on the materiality of the commodity charges.

Capacity forecasting  Capacity charges reflect the network capacity costs associated with the supply points peak demand requirements. Charges are fixed from day to day but a forecast of aggregate booked / deemed capacity for each day is required.  AQ review impact is the major uncertainty to forecasting.  Likely to be more challenging with an April price year.

Move to an April price change  The October price change means that for the first six months of a Formula Year the DN is recovering it’s Allowed Revenue on charges set to target the previous Formula Year’s Allowed Revenue.  As prices are published in August, the DNs have collected revenue from April to June and forecasts are required from July to March. When we move to an April Price change, forecasts are for the full year as well as the previous Formula Period (forecast of K brought forward required). This implies more risk!  However, this becomes less of an issue with Capacity based charges (providing SOQ remains relatively constant after AQ Review).

Move to an April price change  However, an October price change effectively gives DNs six month to collect the difference that would be collected if there were no price change and the Allowed Revenue in that Formula Year.  Depending on the Capacity / Commodity ratio in October a price change scaling factor (1.7 to 2) is required.  The move to an April Price year removes the scaling factor and therefore should reduce the magnitude of price changes relative to an October change.  Even though this may increase the risk on Allowed Revenue forecasting and require a forecast of K Brought Forward the benefits of removing the half year scaling factor is expected to reduce price volatility

Pre – 2007 charge structure & risks The major risk was associated with demand forecasting due to the large proportion of revenue collected on Commodity Charges. Reconciliation also material risk due to level of Commodity. October Price change and low level impact on Capacity from AQ Review. Allowed Revenue included cost pass through, DNMRA, Shrinkage, Exit and K brought forward – Core, cost pass through and Exit were relatively certain, Shrinkage and DNMRA less material than present day. Although a risk, this was less of an issue than demand forecasting.

February 2006 Ofgem recommendations  Capacity / Commodity split – Customer charge  Capacity / Commodity split – System charge  Customer / System split  System charge unit rates  Customer charge unit rate Apr 2007 Oct 2008 Apr 2009 Apr 2009/10 Not Started

Post October 2008 charge structure Commodity and reconciliation becomes less material and lower risk April price change reduce magnitude of price changes but brings forecasts forward by six months. Allowed Revenue uncertainty increased due to new / amended incentives and adjustments and forecast requirements following the April price change timescales. Capacity becomes a significant forecast risk due to the impact of AQ review.

Going forward what are the options?  Allowed Revenue forecast is more material – DNs need accurate forecasts of elements under their control i.e. MSRA, cost pass through, Exit, re-openers, new incentives / adjustments  Capacity (SOQ) change is now highly significant, impacts on six months of the forecast and beyond DN control due to the AQ review  Options to reduce capacity risks?  Early forecasts of SOQ changes from market  Use SOQs as at 1 st January for Price purposes  Move AQ Review so that it is implemented on 1 st January  Possible introduction of fixed supply point charges Proposals welcome!