Introduction to Materials Management Chapter 4 – Material Requirements Planning.

Slides:



Advertisements
Similar presentations
Material Requirements Planning
Advertisements

To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
1 Unit 4B - Logics and Calculation of Material Requirement Planning.
EYYUP ORAK Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Inventory and MRP 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
Material Requirements Planning
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
6. Material Requirements Planning (MRP)
Principles of Operations Management
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Master Production Scheduling
Introduction SAP Material Planning Dr. Djamal Ziani King Saud University.
Material Requirements Planning (MRP)
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
Materials Requirement Planning (MRP)
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
Material Requirements Planning Dr. Everette S. Gardner, Jr.
Material Requirement Planning (MRP)
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Session 12 System Transactions
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
Lecture 32. Revision:. Material Requirement Planning
Materials Requirements Planning
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Material Requirements Planning (MRP) Slide Set #10.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Operation Management.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
Lecture 9 Materials Requirements Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
Introduction to Materials Management
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2011 The McGraw-Hill Companies, All Rights Reserved Chapter 18 Material Requirements Planning.
P RODUCTION PLANNING What do we need to produce? Process Machinery & Equipment Labor Skills Material 1.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning 15 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
MGMT Materials Management Systems Materials Requirements Planning Chapter 4.
15 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Resource Planning Chapter 15.
Production Planning and Control
Resource Planning Chapter 15.
Materials Requirements Planning
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
Material Requirements Planning Chapter 2. MRP in MPC.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Lecture 5 Master Product Scheduling Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College, Emeritus,
1 The MRP Heuristic  MRP stands for Materials Requirement Planning  It is a widely used approach for production planning and scheduling in industry 
MATERIALS REQUIREMENT PLANNING (MRP) MRP IS A SYSTEM OF PLANNING AND SCHEDULING THE TIME- PHASED MATERIALS REQUIREMENT FOR PRODUCTION OPERATIONS. PROACTIVE.
Material Requirements Planning (MRP)
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
Material Requirements Planning
Arnold, Chapman, & Clive: Intro Materials Management, 6 th ed. © 2008 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Production.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Materials Requirements Planning
BUAD306 MRP/ERP.
Introduction to Materials Management
MATERIAL Requirements planning MRP
Material Requirement Planning (MRP)
Resource Planning Chapter 16
Chapter 14 Dependent Demand
Presentation transcript:

Introduction to Materials Management Chapter 4 – Material Requirements Planning

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Independent versus Dependent Demand Independent Demand Not related to demand for other assemblies or products, instead from outside sources Generally forecasted demand Dependent Demand Generally related to production of an end product (as defined on the MPS) Can be calculated instead of forecasted

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Dependent Demand Approach – Materials Requirement Planning (MRP) Major Objectives of MRP Determine Requirements – Calculated to meet product requirements defined in the MPS What to order How much to order When to order When to schedule delivery Keep Priorities Current

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Links To Other MPC Functions

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Major Inputs to MRP Master Production Schedule quantities and times Inventory records of all items to be planned Planning factors such as lead times, order quantities, and safety stock Current status of each item Bills of material for MPS items

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Sample Bill of Materials

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Bill of Material Points The BOM shows all parts to make one of the item Each part has one, and only one, part number A part is defined by form, fit, and function – any change requires a new part number

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Sample Product Tree for the BOM

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Breaking Down the BOM into More Detail – the Multilevel Bill

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Example in Page 68

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Indented BOM – Use Indentation to Show Parent-Component Relationships

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Planning Bills of Material Artificial grouping of components for Planning Purposes Used to simplify Forecasting Planning Master Scheduling Represent an average, not buildable product

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Sample Planning BOM

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Where-Used and Pegging Where-used reports - shows the parents for a component (contrast with a bill of materials that show the components for a parent) Pegging report – shows the parents for a component, but only those parents where there is an existing requirement

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Figure 4.10 in page 70

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Major Uses for Bills of Material Defines the product Provides method for design change control Planning – What is needed and when Order entry – order configuration and pricing Production – Parts needed to assemble a product Costing – material cost of goods sold

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Basic MRP Record

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Some Key Terms Lead time – span of time for a process Exploding – process of multiplying requirements by usage to get BOM requirements Offsetting – Placing requirements in the proper period based on lead time Planned orders – Orders planned during the explosion, but not yet released for processing Low-level code – lowest level on which a part resides on the Bill of Materials

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Some Key Terms, Continued Scheduled receipts – Open orders released for processing (production or purchase) scheduled to be received at a defined time. Gross Requirements – Total of a component needed to meet requirements not taking any existing inventory into account Net Requirements – Actual amount of a component needed to meet requirement after existing requirements taken into account

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Some Key Terms, Continued Projected available – The expected inventory position at the end of the period Planned order release – the amount that should be ordered (using the lot size) to prevent a negative projected available balance Planned order receipt – when the order should be available for use, offset by lead time from the planned order release

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Example Problem Lead time for this component is 2 weeks and order quantity is 200. Complete the table. What action should be taken?

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Example problem solution The order for 200 should be released

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Example for a multilevel BOM Lead time for each component is 1 week

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Netting and exploding zero-level parts

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Netting and exploding first-level parts

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Completed Material Requirements Plan

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Sample Multiproduct MRP Explosion

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Points About the MRP Record Current time – beginning of first period (often called time buckets) Items considered available at beginning of period Quantity in Projected Available row considered at end of period Current period often called action bucket – action should be taken to avoid a future problem

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Planner Responsibilities for MRP Launch Orders – Production or Purchasing Reschedule orders as required Reconcile errors and search for causes Solve critical material shortages Replan Expedite Coordinate with other functions to resolve problems

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Moving through time – an example This record shows the status of the part Monday morning. The computer is showing the need to release the order of 30

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. During the week, the following events happen: Only 25 units of the scheduled receipt move into inventory. The balanced is scrapped The gross requirement for week 3 is changed to 10. The gross requirement for week 4 is increased to 50. The gross requirement for week 7 is 15. An inventory count reveals there are 10 more in inventory than the record shows The gross requirement for week 1 is issued from inventory The planned order release of 30 in week 1 is released and becomes a scheduled receipt in week 3.

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. The new record reflects those events from week 1:

Introduction to Materials Management, 7 th Edition Arnold, Chapman, Clive © 2012, 2008, 2004, 2001, 1998, 1996 Pearson Education, Upper Saddle River, NJ All Rights Reserved. Homework Assignment Problems 4.5, 4.9, 4.11, 4.15