Commissioning Hardware and IP Configuration of ATF2 2007 / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)

Slides:



Advertisements
Similar presentations
FD support status N.Geffroy, G.Gaillard, B.Bolzon, A.Jeremie (and discussion with T.Kume)
Advertisements

Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Spare of Vertical Steering Magnet5 Spare Steering PS for DR (repaired) 5 more steering PS (not repaired) Horizontal Steering will be use the steer, rotated.
July 7, 2008 SLAC Annual Program Review Page 1 Andrei Seryi, SLAC American Regional Team leader for BDS Deputy of ATF Spokesperson for ATF2 Global Design.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
ATF2 Magnets ATF2 Magnets KEK, 19 Dec 2006Cherrill Spencer, SLAC ATF2 Mag Design & Production 1 Design and Production Status of New ATF2 Magnets Cherrill.
ATF2 Tuning Updates Glen White, SLAC Sept
ATF2 Magnets ATF2 Magnets 11Mar '08, Weekly MtgCherrill Spencer Status Report ATF2 FD quads 1 Status Report on the ATF2 “Final Doublet” quads being made.
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
Mark Woodley, SLACATF2 Software Review (June 18, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ATF2 Optics for the Commissioning Toshiyuki Okugi, KEK 2008 / 10/ 22 ATF2 commissioning meeting.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
BPM support and beam pipe length FD support status A.Jeremie.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
Global Design Effort SLAC contribution to ATF2 for discussions at S4 expanded meeting April 10, 2007.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004.
ATF2 Magnets etc. 1. Magnets 2. Power supplies 3. Magnetic field measurement 4. Movers and supports R. Sugahara May 30, 2005.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
Mark Woodley, SLAC5th ATF2 Project Meeting (December 19, 2007)1 ATF2 Layout/Optics (v3.8) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Mark Woodley, SLAC6th ATF2 Project Meeting (May 27, 2008)1 ATF2 Layout/Optics (v4.0) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Mark Woodley, SLACATF2 Project March 20-21, Next version of MAD decks (v3.7): what needs to be added/deleted?
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
ATF2 Magnets ATF2 Magnets 24 October 2006Cherrill Spencer, SLAC October 2006 Annecy Mtg 1 Report on special ATF2 meeting held to “kick- off” France participation.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
Hardwares for commissioning 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 5/ 31/ 2006 T.Okugi (KEK)
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
S-BPM Support Issues to be discussed with LAPP and KNU
Summary FD Support System
Expected hardware status and Priority of the commissioning task
Emittance Diagnostics
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
ATF2 Instrumentation Stewart T. Boogert
Junji Urakawa (KEK) for ATF International Collaboration
A.Jeremie, B.Bolzon, N.Geffroy
FD supports A.Jeremie.
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
IP configuration session
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
Presentation transcript:

Commissioning Hardware and IP Configuration of ATF / 12 / 19 ATF2 project meeting at KEK Toshiyuki Okugi (KEK)

Commissioning Hardware for ATF2 I proposed the following hardware preparation to SLAC at the ATF2 meeting in March ) BPM ; - I, Q information from each readout electronics (SLAC) - Temporal BPM control panel for commissioning (KEK) (x, y) = A * Sqrt (I^2+Q^2) * Sgn ( I or Q ) A ; free parameter I,Q ; from SLAC  First pulse calibration result seems to be good performance. Can we use the BPM information from the beginning of the commissioning? If YES, we don’t have to prepare the temporal BPM control panel. 2) Screen, ICT (KEK) and information of amplitude of reference cavity (SLAC). 3) Quad Movers Calibration and control system should be ready before commissioning (SLAC). First priority of the ATF commissioning is to transport the beam to the end of ATF2 beam line without beam loss.

Shintake Monitor Area IP QD0 S-band BPM Sweeping Magnet Honda Monitor Carbon Wire Scanner C-band BPM 180 Screen Monitor 825 Dump Bend Stripline BPM ICT IP configurations presented at Annecy Meeting IP-BPM Small vertical aperture How to put all of the devices in the limited space ? Is it possible to shorten - the length of the stripline kicler ? - the Shintake monitor support table thickness ? - the thickness of the adopter of S-band BPM ? - the length of Honda monitor ?

SBPM QC3 SBPM FFTB 2.13 S3.00 SF1FF QF1FF SBPM QC3 SBPM FFTB 2.13 S3.00 SD0FF QD0FF Final Doublet Table Configuration mm space is necessary for S-band BPM with adopter.

IP BPM Chamber 100mm IP 135mm100mm IP BPM will be located on the chamber. Honeycomb Table IP BPM chamber will be mounted in the hole of the Shintake monitor honeycomb table

Sweeping Magnet Flange to Flange Length150 mm Electrode Length80 mm Electrode Gap40 mm Power Supply SpecificationDC +/- 100V, double pulse, bipolar Kick Angle6.1nrad / V Scan Position at IP 3.7nm / V Dynamic Range+/- 370nm - enough for Shintake monitor, carbon wire and IP FB. - However, it is too week for Honda monitor. The old stripline kicker will be modified for the sweeping magnet. For the nominal operation, one side of electrodes should be open, and use DC PS. For the first feedback, one side of electrodes should be connect to the load.

IP QD0 S-band BPM Sweeping Magnet Honda Monitor Carbon Wire Scanner C-band BPM 180 Screen Monitor 825 Dump Bend Stripline BPM ICT New IP configurations IP BPM

Stripline BPM Device List Blue ; wide beam pipe Red ; Long Electrode ( High Resolution) Old BPM Name Electrod e Length Pipe Diamet er OriginalModifiedBellows Magnet Thicknes s Pipe Length Total Length Magnet Thickness Pipe Length Total Length OriginalModified Electrode Side No Electro de Electrode Side No Electrode ML1X40Narrow ○○ ML2X40Wide ×○ ML3X40Wide ×○ ML4X40Wide ×○ ML5X40Wide ○○ ML6X40Wide ×○ ML7X40Narrow ×○ ML8X120Narrow ○○ ML9X120Narrow ○○ ML10X120Narrow ○○ ML11X120Narrow ○○ ML12X120Narrow N/A ○○ ML13X40NarrowN/A 170N/A 170×× ML14X40NarrowN/A ×○

nameold namefunctiontype locationcomments ML1XML2XBPMstripline (L.R.)d/s end of QF1X (Hitachi 180) MS1X move by +35mm ML2XML3XBPMstripline (L.R.)d/s end of QD2X (Hitachi 180) ML3XML4XBPMstripline (L.R.)d/s end of QF3X (Hitachi 180) ML4XML5XBPMstripline (L.R.)d/s end of QF4X (Hitachi 180) ML5XML6XBPMstripline (L.R.)u/s end of QD5X (Hitachi 180) ML6XML7XBPMstripline (L.R.)u/s end of QF6X (Hitachi 180) ML7XML1XBPMstripline (L.R.)d/s end of QF7X (Hitach 60) ML8XML14XBPMstripline (H.R.)d/s end of QD8X (Hitachi 180) ML9XML8XBPMstripline (H.R.)u/s end of QF9X (Hitachi 180) ML10XML9XBPMstripline (H.R.)d/s end of QF13X (Hitachi 180) ML11XML10XBPMstripline (H.R.)d/s end of QD14X (Hitachi 180) ML12XML11XBPMstripline (L.R.)d/s end of QF15X (Hitachi 180) QBPM1X BPMC-band cavityd/s end of QD10X (QEA 180) No mover QBPM2X BPMC-band cavityd/s end of QF11X (QEA 180) No mover QBPM3X BPMC-band cavityd/s end of QD12X (QEA 180) No mover QBPM4X BPMC-band cavityd/s end of QD16X (QEA 180) No mover QBPM5X BPMC-band cavityd/s end of QF17X (QEA 180) No mover QBPM6X BPMC-band cavityd/s end of QD18X (QEA 180) No mover QBPM7X BPMC-band cavityd/s end of QF19X (QEA 180) No mover QBPM8X BPMC-band cavityu/s end of QD20X (Hitach 60) C-band BPM with Hitachi QBPM9X BPMC-band cavityd/s end of QF21X (Hitach 60) C-band BPM with Hitachi nameold namefunctiontype locationcomments ML1FFML12XBPMstripline (H.R.)between QM12FF and QM11FFpulse-to-pulse feedback ML2FFML13XBPMstripline (L.R.)d/s dump bend