NERC Lessons Learned Summary LLs Published in September 2015.

Slides:



Advertisements
Similar presentations
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
Advertisements

Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
Load Management System
Goshen Area Bus Reconfiguration
Quest Web-Browser Interface. Home Page This is the Home Page of the Quest Browser Interface. This page will show the site information, and any active.
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
August 14, 2003 Blackout Final Report
EAS Lessons Learned Summary Lessons Learned Published in May 2014.
11 TROUBLESHOOTING Chapter 12. Chapter 12: TROUBLESHOOTING2 OVERVIEW  Determine whether a network communications problem is related to TCP/IP.  Understand.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 4 Installing and Configuring the Dynamic Host Configuration Protocol.
© 2005, QEI Inc. all characteristics subject to change. For clarity purposes, some displays may be simulated. Any trademarks mentioned remain the exclusive.
Chapter 19: Network Management Business Data Communications, 4e.
Lesson 18-Internet Architecture. Overview Internet services. Develop a communications architecture. Design a demilitarized zone. Understand network address.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
Hands-On Microsoft Windows Server 2003 Networking Chapter 7 Windows Internet Naming Service.
September 2014 Lesson Learned Summary. September 2014 LLs 2 Three NERC lessons learned (LL) were published in September 2014 LL Redundant Network.
NERC Lessons Learned Summary March NERC lessons learned published in March 2015 Two NERC lessons learned (LL) were published in March2015 LL
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
NERC Lessons Learned Summary
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
Administering Windows 7 Lesson 11. Objectives Troubleshoot Windows 7 Use remote access technologies Troubleshoot installation and startup issues Understand.
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
Guide to Linux Installation and Administration, 2e 1 Chapter 9 Preparing for Emergencies.
Lesson 14: Installing and Uninstalling Programs how to install a new program what to do if the new program doesn’t work how to uninstall a program © CCI.
APS Dual Site ECC Primary Site Shutdown/Restart CIPC Confidentiality: Public Release.
IMPROUVEMENT OF COMPUTER NETWORKS SECURITY BY USING FAULT TOLERANT CLUSTERS Prof. S ERB AUREL Ph. D. Prof. PATRICIU VICTOR-VALERIU Ph. D. Military Technical.
1 Lesson 3 Computer Protection Computer Literacy BASICS: A Comprehensive Guide to IC 3, 3 rd Edition Morrison / Wells.
NERC Lessons Learned Summary April NERC lessons learned published in April 2015 Two NERC lessons learned (LL) were published in April 2015 LL
DB-2: OpenEdge® Replication: How to get Home in Time … Brian Bowman Sr. Solutions Engineer Sandy Caiado Sr. Solutions Engineer.
Module 9 Planning a Disaster Recovery Solution. Module Overview Planning for Disaster Mitigation Planning Exchange Server Backup Planning Exchange Server.
EAS Lessons Learned Summary Lessons Learned Published in August 2014.
Summary Rich Bauer, Senior Reliability Engineer Event Analysis Subcommittee – LL Update March 04, 2014.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
NERC Lessons Learned Summary February NERC lessons learned published in February 2015 Two NERC lessons learned (LL) were published in February 2015.
Queensland University of Technology CRICOS No J Protection of distributed generation connected networks with coordination of overcurrent relays.
1 © 2005 Cisco Systems, Inc. All rights reserved. 111 © 2004, Cisco Systems, Inc. All rights reserved. CNIT 221 Security 2 ver.2 Module 8 City College.
EAS Lessons Learned Summary Lessons Learned Published in June 2014.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Announcements Read Chapters 10 and 11
Chapter 12 Implementation and Maintenance
The Importance of Proper Controls. 5 Network Controls Developing a secure network means developing mechanisms that reduce or eliminate the threats.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
NERC Lessons Learned Summary LLs Published in December 2015.
Virtual Machine Movement and Hyper-V Replica
STATUS OF TELECOMMUNICATIONS SYSTEM AND O&M PRACTICES IN ELECTRIC POWER INDUSTRY OF SERBIA (EPS) Danilo Lalović, Senior Engineer for Telecommunications.
Troubleshooting Windows Vista Lesson 11. Skills Matrix Technology SkillObjective DomainObjective # Troubleshooting Installation and Startup Issues Troubleshoot.
April 7, 2015 Washington, D.C. Area Low-Voltage Event Operations Training Seminar 2016 Erik Johnson System Operations Training (ERCOT)
NERC EAS Update WECC OPEAS Meeting 01/26/2016 Rich Hydzik.
NERC Published Lessons Learned Summary
Chapter 19: Network Management
NERC Published Lessons Learned
NERC Published Lessons Learned Summary
NERC Lessons Learned Summary
1+1 Ethernet Failover & Network Protection Switches
NERC Published Lessons Learned
Phase Angle Limitations
NERC Published Lessons Learned
EAS Lessons Learned Summary
NERC Published Lessons Learned
NERC Published Lessons Learned Summary
DS3 Fail-over Protection Switch
NERC Published Lessons Learned Summary
Compliance Report to ERCOT TAC February 2007
the CERN Electrical network protection system
Programmable Logic Controllers (PLCs) An Overview.
Primary Site Shutdown/Restart
The Troubleshooting theory
Presentation transcript:

NERC Lessons Learned Summary LLs Published in September 2015

Two NERC lessons learned (LL) to be published in September and one is pending LL Loss of EMS Communications Due to Lack of Validation on EMS Database RTU Configuration Parameter LL – Relay Design and Testing Practices to Prevent Scheme Failure Pending Loss of EMS due to RTU LAN UPS failure NERC Lessons Learned Published in 2015

Commissioning new remote terminal unit (RTU) results in EMS outage One point incorrectly configured results in termination of the remote communication server  Process coordinates the polling and commands of RTUs and the insertion of telemetry into the real time database Automatic failover (from primary and back-up) did not correct issue since the error was in the database configuration EMS lost communications with all RTUs State Estimator and Contingency Analysis had stale data Most changes verified prior to execution but the database configuration parameters were not checked Loss of EMS Communications Due to Lack of Validation on EMS Database RTU

Corrective Actions Parameter configuration was corrected Script was run to confirm the configuration error doesn’t exist elsewhere Revised procedure to confirm EMS database RTU configuration is correct in quality assurance prior to uploading a database change to production Created a case with the EMS vendor documenting the defect  Vendor will provide a new release with the defect resolved Loss of EMS Communications Due to Lack of Validation on EMS Database RTU

Lessons Evaluate parameters being checked by the database editor to determine if there are any gaps in the parameter validation  If so, establish procedures for manual validation SCADA software should be designed to generate error messages and avoid termination upon an incorrect parameter Recovery strategy and procedures should be developed for quick recovery from failed updates Loss of EMS Communications Due to Lack of Validation on EMS Database RTU

Single-phase to ground fault occurred on a 230 kV three-terminal feeder Associated breakers tripped then the line reclosed at one end (as designed) Two protection equipment failures on two separate relay systems prevented the proper clearing after the automatic reclose 1: Loose connection in the trip aux relay coil cutoff contact string 2: Believed to be intermittent connection issue Fault evolved to multi phase and remained on the system for 58 seconds Breaker Failure didn’t initiate since it was tied to same aux trip relay Fault cleared by backup ground protection on two 500 kV lines Relay Design and Testing Practices to Prevent Scheme Failure

Corrective Actions Transmission Owner (TO) evaluated existing procedures to align periodic relay testing with planned transmission outages and perform circuit breaker trip testing 52a contacts rewired in parallel rather than in series Replaced a relay as needed New relay eliminates need for the 52a contacts in the breaker trip circuit Relay Design and Testing Practices to Prevent Scheme Failure

Lessons Key issue: Breaker Failure Initiate (BFI) signal originated from auxiliary trip relay Options:  Use separate contact to provide BFI  Use dedicated aux relay for BFI  Connect protective relay trip contact directly to breaker failure relay input if relay will accommodate voltage input Avoid use of 52a contacts in series Consider periodic functional tests Relay Design and Testing Practices to Prevent Scheme Failure

Rack mounted uninterruptible power supply (UPS) Failed resulting in loss of remote terminal unit (RTU) local area network (LAN) and then the loss of EMS and ICCP for 50 minutes UPS added to accommodate EMS/SCADA hardware upgrade Remained in service as a dual layer UPS UPS battery pack failed and the UPS did not have an internal bypass to house power Failover was not available since the front end processor for the RTU LAN at the back-up was pointed at a replacement system’ The entity was in transition to a new software for their EMS Loss of EMS Due to RTU LAN UPS failure

Corrective Actions RTU LAN routers were plugged into another UPS and rebooted, restoring EMS visibility and ICCP link connectivity FEP at the remote site was reconfigured to allow sending data to both the replacement SCADA/EMS and the existing SCADA/EMS systems simultaneously by using additional IP addresses Primary and Backup Routers at the Primary Site were plugged into alternate UPSs Additional (temporary) rack mounted UPSs will be removed upon cutover to the replacement SCADA/EMS system (Vendor 1 to Vendor 2) Loss of EMS Due to RTU LAN UPS failure

Lessons UPS systems should be checked to verify they have an internal bypass Periodic maintenance and monitoring on any UPS system is beneficial  Some UPS systems perform battery maintenance/cycling internally but additional checks may be performed to verify functionality Loss of EMS Due to RTU LAN UPS failure

Directions to Lessons Learned: Go to > “Program Areas & Departments” tab > “Reliability Risk Management” (left side menu) > “Event Analysis” (left side menu) > “Lessons Learned” (left side menu) NERC’s goal with publishing lessons learned is to provide industry with technical and understandable information that assists them with maintaining the reliability of the bulk power system. NERC requests that industry provide input on lessons learned by taking the short survey. The survey link is provided on each Lesson Learned. Link to Lessons Learned

Questions?