JAD Session Testing. 2 Types of Tests  Unit Testing  Sub-system Testing  System Integration Testing  Performance Testing  Acceptance Testing  Beta.

Slides:



Advertisements
Similar presentations
Measuring distance on a map Measuring distance on a map is one of the most important skills to develop. If you can accurately measure the distance you.
Advertisements

The future of navigation in Cambodia Provided by Smarter Solutions © 2010 Smarter Solutions Co., Ltd. All rights reserved. All information contained herein.
OS Places New Service Products from May 2014 Address Capture & Verification Address Matching GeoSearch Ordnance Survey 2014.
California Environmental Resources Evaluation System Environmental Information Sharing and Integration.
Implementing a Highly Available Network
1 SWE Introduction to Software Engineering Lecture 22 – Architectural Design (Chapter 13)
Mobile Technology for Real Property Assessment Tax Assessor’s Office Davie County, North Carolina.
Reference and Instruction Automated Statistics Gathering and Reporting System Members: Patrick Chen (pyc7) Soo-Yung Cho (sc444) Gregg Herlacher (gah24)
Business Trips System Ahmed Esmat ATS/ITC 17 April 2005.
Karolina Muszyńska Based on
2005 Logistics Summit Using GIS Technologies for Oversize/Overweight Permitting Joel Bump, Senior GIS Software Developer.
1 Introducing Scenario Network Data Editing and Enterprise GIS January 27, 2010 Minhua Wang, Ph.D. Citilabs, Inc.
Technical solution presentation AVL System for Fire Brigades.
Supplier Invoicing North America
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
ARCHIBUS Log On Instructions. Log Into ARCHIBUS Web Central Log In Screen 1.Open your Internet browser. 2.Enter the URL to view the ARCHIBUS Login Page.
Barracuda Load Balancer Server Availability and Scalability.
Integrated Enterprise System 11/1/11Create travel expense report ESS 6.03 vers Employee Self Service – Create a Travel Expense Report tutorial Effective.
Integrating XML with Microsoft SQL Server ©NIITeXtensible Markup Language/Lesson 9/Slide 1 of 31 Objectives In this lesson, you will learn to: * Generate.
ABSTRACT Zirous Inc. is a growing company and they need a new way to track who their employees working on various different projects. To solve the issue.
Air conditioning: new IR emitter item WDS DIVISION Main advantage Permit to control air conditioning IR splitter from My Home touch screens Bus.
The Utilization of GIS Technology at Northeastern REMC Presented By: Steven Weber, GISP Northeastern REMC (260)
Chapter 4 User Experience Model. User experience model (Ux) Visual specification of the user interface Visual specification of the user interface Both.
Scalable Architecture for the Cloud. What????  Command Query Responsibility Segregation  What is it?  What kinds of apps is it for?  What are the.
Life Cycle Objectives CSE 403 Project: Developing a GIS application for a mobile client. Developing a GIS application for a mobile client.
SECURITY ZONES. Security Zones  A security zone is a logical grouping of resources, such as systems, networks, or processes, that are similar in the.
Lead Management Tool Partner User Guide March 15, 2013
TestFiles Life Cycle Architecture Chris Byszeski Ooi Hsu Han Amir Kouretchian Sachin Pradhan Quang Tran Peter Turschmid Nick Walker.
Production Planning Group 4 Claudia· David· Lisa· Shakeia· Vicky.
Smart Forms 2010 CAMIS Conference July 29,  Session Overview  Smart Form Process Flow  Understanding the Initial Procedures  Scan Process in.
Ashley Hawley. Project Description Business Need User Profiles Development Technology Testing Plan Deliverables Demonstration Conclusion.
System Initialization 1)User starts application. 2)Client loads settings. 3)Client loads contact address book. 4)Client displays contact list. 5)Client.
Esri Roads and Highways: An Introduction to Roadway Reporter
Siebel 8.0 Module 5: EIM Processing Integrating Siebel Applications.
How Accurate is your Address Data? Kentucky Geospatial Audit for Matt Wagoner, CFM GIS Manager James Morse, GIS Project Manager Stantec Consulting.
Land Administration System
Module 10 Administering and Configuring SharePoint Search.
CBRFC Website Improvements Conditions Map – Grids Add Precipitation Accumulation Capability – Custom Time Periods Add Flash Flood Guidance Grid – Use Flash.
Plan Design Analyze Develop Test Implement Maintain Systems Development Life Cycle eBookSharing.
Snow Plow Tracking and GIS
Project Board Meeting. Agenda  Project Progress Update  TxPROS Demo  CPS Modernization Options  Call for Direction  Next Steps  Q & A.
Requirements Document Slicer3 Workflow Based Interface for NAV-RFA.
There’s a right way and a wrong way to document data manually and from DAS at the same time … If you enter the data in the wrong sequence, you risk losing.
Project Deliverables CEN Engineering of Software 2.
ADVANTAGES OF DATA BASE MANAGEMENT SYSTEM. TO BE DICUSSED... Advantages of Database Management System  Controlling Data RedundancyControlling Data Redundancy.
World Book Web. Introducing World Book Advanced World Book Advanced.
Preliminary Ocean Project Page 1 WGISS SG May 15, C. Caspar G. Tandurella P. Goncalves G. Fallourd I. Petiteville Preliminary Ocean Project Phase.
TxDOT Utility Installation Review (UIR) System
Coastal Data Management System Update Alfred Wanger May 15,
Estimate Job Specific Play Book Production Worksheet Production Database Actual Estimate Actual Estimate Remote Time Entry Field Reporter OfficeField Accu-Crete.
Public Purchase Vendor Registration & Responding to a Bid Copyright © The Public Group, LLC - This document is confidential and intended only for the use.
When you begin a project, a reference data layer is placed on the map first. This initial layer(s) is called the base map. There are different types of.
Writing Your Own Web Page: Using HTML and FrontPage Chapter 10.
Importing ASENT data into EAGLE Last revised: 12/16/2009.
February 26, 2008 Andy Chang · Osei Simba Hinds · Rachal Royce.
Oracle Business Intelligence Foundation – Testing and Deploying OBI Repository.
Preparing VDOT’s GIS data for the Implementation of Bentley Superload Brian Young – GIS Technical Lead (ARS) Paul Bucher – Quality Assurance Officer Jean.
Requirements Analysis Review Modeling Team Matt Weyant 26 Oct 1999.
2 Copyright © 2004, Oracle. All rights reserved. Running a Forms Developer Application.
11 November 1999Sticky Technology for Augmented Reality Systems Robert Kurian Inspection Team STARS Project Carnegie Mellon University 11 November.
Session on Load Testing - Alok Agarwal. Agenda for the session Definitions Example on load testing What to Avoid When Testing for Load Goals of Load Testing.
Windows 7 Ultimate
Phase II, The Pilot Area Kick-off
Routing Texas into the Future
JAD Session TSD Standards
JAD Session Data Integration
Chapter 4: Access Control Lists (ACLs)
Database Development for Load-Restricted Zone in Texas
Software Requirements Review PMO - Provide COR Information to Vendors
Presentation transcript:

JAD Session Testing

2 Types of Tests  Unit Testing  Sub-system Testing  System Integration Testing  Performance Testing  Acceptance Testing  Beta Testing

3 Unit Testing  GIS Data*  Bridge Data*  Restrictions  Routing  Mapping  Restriction Editor  Web Interface * Items covered by both Unit Testing and System Integration Testing

4 Unit Testing – GIS Data  All TxDOT roads correctly identified  Load Zone roads correctly identified  All other TRM data correctly identified

5 Unit Testing – Bridge Data  Bridges marked and identified correctly  Verified against BRINSAP?  Verified against permit book  Verified through other methods

6 Unit Testing - Restrictions  Restrictions comprehensive and complete  Restrictions cover all scenarios  Restrictions match permit book

7 Unit Testing - Routing  Routing w/o restrictions acceptable to TxDOT  Routing around restrictions work

8 Unit Testing - Mapping  Map display acceptable to TxDOT  Maps display restrictions acceptably  Maps display all other needed data

9 Unit Testing – Restriction Editor  Acceptable operation both locally and remotely  Display map data  Acceptable display and marking of restrictions

10 Unit Testing – Web Interface  Correct operation  Map display  Location entry  Navigation

11 Sub-system Testing  Routing  Restriction Editor  Web Interface  Re-route  Reporting  Updating

12 Sub-system Testing - Routing  Routing with restrictions acceptable to TxDOT

13 Sub-system Testing – Restriction Editor  Restrictions saved correctly  Routing around restrictions match web routing  Restriction retirement notification process works correctly  Correct operation of restriction initialization/retirement process

14 Sub-system Testing – Web Interface  Bid Routes work correctly  Save/recall user trips  Correct routing/map display  Correctly saves trips  Permit officer routing

15 Sub-system Testing – Re-route  Correct notification

16 Sub-system Testing - Reporting  Correct reporting of trips  Canned reports

17 Sub-system Testing - Updating  Correct updating of TxDOT data  Correct migration of restrictions  Correct display of historical trips over deactivated road segments  Correct routing of historical trips  Correct display of historical restrictions

18 System Integration Testing  GIS Data  Bridge Data  CPS

19 System Integration Testing – GIS Data  All TxDOT road correctly identified  Load Zone roads correctly identified  All other TRM data correctly identified

20 System Integration Testing – Bridge Data  Bridges marked and identified correctly  Verified against BRINSAP?  Verified against permit book  Verified through other methods

21 System Integration Testing – CPS  Start routing session for new permit  Start routing session for existing permit  Correctly return session to CPS  CPS updates permit information  Passing route and map information back to CPS  Bid route interface

22 Performance Testing  Single system test  Ultimate load to failure  System behavior at failure  Multi-system test  Scaling estimates  DB server load  System responsiveness at peak loads

23 Acceptance Testing  GIS/Bridge database accurate  Routing acceptable  Restriction process acceptable  Interface with CPS acceptable  Web interface acceptable  Report generation acceptable  Re-route notification acceptable  Update process acceptable  Performance acceptable  Installation/operation acceptable

24 Beta Testing  Users able to understand and use the system  Documentation helpful

25 Q & A