2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.

Slides:



Advertisements
Similar presentations
Test X5/GIF: Status Report Manuela Cirilli.
Advertisements

Kondo GNANVO Florida Institute of Technology, Melbourne FL.
1 AMS-02 TRD Status Report Stefan Schael RWTH Aachen TIM Meeting, CERN, June 2001 TRD meeting: Wednesday 16:15 in room !!!
6/4/2004 CSN1L. Pontecorvo INFN-Roma1 MDT Results from H8 Test Beam End-Cap StandBarrel Stand.
Status of the ATLAS MM project
ATLAS Muon test beam, E. Etzion, NSS System Test of the ATLAS Muon Spectrometer in the H8 Beam at the CERN SPS Erez Etzion (Tel Aviv University),
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
RD51 Common Test Beam: Status RD51 collaboration week Kolymbari, June 2009 Yorgos Tsipolitis NTUA.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
The barrel reference system1 THE BARREL REFERENCE SYSTEM C.Guyot (Saclay) Goal: Provide a geometrical survey of the whole barrel muon spectrometer.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
Muon System and Physics Performance Ludovico Pontecorvo CERN-INFN.
Precision Drift Chambers for the ATLAS Muon Spectrometer Susanne Mohrdieck Max-Planck-Institut f. Physik, Munich for the ATLAS Muon Collaboration Abstracts:
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
H8-RD22 Experiment to test Crystal Collimation for the LHC Organized by: Walter Scandale Conducted at CERN Geneva, 27 September 2006 Participants included:
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
BOS Testbeam Results in 2001 MPI & LMU, Munich 1. Drift time spectra 2. RT-relation 3. Resolution - HV & threshold dependance -Comparison with the 1999.
RPC Upscope : An overview with Indian perspective L. M. Pant Nuclear Physics Division Bhabha Atomic Research Centre L. M. Pant India-CMS Meeting, BARC.
Muon-raying the ATLAS Detector
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
RD51-WG7 Report RD51 collaboration week CERN, November 2009 Matteo Alfonsi & Yorgos Tsipolitis RD51 collaboration week CERN, November 2009 Matteo Alfonsi.
1 Possible setup for the H8 test beam F.Cerutti pIntroduction: from H8 Phase I to the system test pPossible setup in : Magnets on the H8 beam.
Update on CHANTI F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Napolitano, L. Roscilli, G. Saracino Università degli Studi di Napoli «Federico.
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Luca Spogli Università Roma Tre & INFN Roma Tre
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
The experimental setup of Test Beam HE EE ES BEAM  A slice of the CMS calorimter was tested during summer of 2007 at the H2 test beam area at CERN with.
Precision Drift Chambers for the ATLAS Muon Spectrometer
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
FNAL Beam test results A. Zhang, V. Bhopatkar, M. Phipps, J. Twigger, M. Hohlmann HEP Group A, Florida Tech 2013/11/18.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
Atlas Muon Spectrometer: installation and commissioning L. Pontecorvo INFN Roma.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Adele Rimoldi, Pavia University & INFN – CERN G4usersWorkshop Nov H8 Muon Testbeam Simulation CERN - 14 November, 2002 and the Physics Validation.
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
1 A CLUster COUnting Drift Chamber for ILC …and… can we adapt this chamber to SuperB ? F.Grancagnolo, INFN – Lecce, Italy.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
RD51 GEM Telescope: results from June 2010 test beam and work in progress Matteo Alfonsi on behalf of CERN GDD group and Siena/PISA INFN group.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Vladimir Frolov (Centro Fermi) On behalf EEE-TO group.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Real data in the Muon Spectrometer Bernardo RESENDE and a lot of other people not named here NIKHEF Jamboree, December 2008.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
Operation, performance and upgrade of the CMS Resistive Plate Chamber system at LHC Marcello Abbrescia Physics Department - University of Bari & INFN,
Production ad Quality control of RPCs for the CMS muon barrel system
Atlas: Upgrade Phase I Massimo Della Pietra.
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Preparation for CERN test beam
The interaction region for FIRST (status report)
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Overview of the Frascati Production Facilities
10/month is the present production rate 2 FTE + sporadic contributions
ATLAS Muon Spectrometer and
Preparation of the CLAS12 First Experiment Status and Time-Line
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Univerity of rome “Tor Vergata”
Limited Streamer Tube Project Summary
Covering a Large Area ILC-TPC endplate
Plans for the 2004 CSC Beam Test
Presentation transcript:

2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule

2/4/2001Ludovico Pontecorvo INFN Roma2 H8: System Test One should not forget that at the end, all the chambers has to fit and work together. For this reason, the integration workshop next week is of utmost importance, to ensure that we have a first test before it is too late to make changes. George Mikenberg In H8 we should have a setup able to test all the aspects of our spectrometer from individual chambers to system aspects. Therefore we need: A Test station ( Individual chambers from BIS to BOS on rot.support): Provide R-T relation by autocalibration, measure resolution and chamber mechanical precision etc. A Barrel and End Cap Sectors Study system aspects: alignement and DCS, DAQ, installation, groundings, common behaviour of Trigger and Tracking chambers etc.

2/4/2001Ludovico Pontecorvo INFN Roma3 Interested groups: MPI: Will Send and set up one BOS chamber, will partecipate in the data taking. Will partecipate in the 2002 tests Roma-Pavia: Will provide and set up one BIL chamber, Large effort on DAQ-1, Set up small area trigger and Tracker, will partecipate in the data taking. LMU: Will provide Hodo trigger, but for this year will not partecipate in the tests. Will be interested in the 2002 tests. NIKHEF : Will Provide chambers this year and the following year. They are also interested in the alignement. Frascati: Interested in testing one chamber this year, expressed interest also on electronics and DAQ-1. Greeks: Interested in the test, probably will provide a chamber but will contribute less in the data taking. Dubna: No chamber testing in 2001, could provide some help for the running of the 2001 test. In 2002 interest in testing one chamber in H8

2/4/2001Ludovico Pontecorvo INFN Roma4 Beam Layout Barrel Sector Test Stand Old Counting Room New Counting room End Cap Sector

2/4/2001Ludovico Pontecorvo INFN Roma5 Test station Goals for 2001 å First Tests with beam tracks for the new Chambers complementary to cosmic set up. åCheck of the chamber performances (tracking resolution, efficiency, strobed noise level, Gas Distribution….) åCheck of the mechanical construction (wire position with respect with X-Tomo Results) åCheck of the new electronics åCheck of the new DAQ-1 å Trigger :10*10 and Hodoscope (large area) å External Tracker å Different beam angles for autocalibration (rotating Support) Experimental requirements

2/4/2001Ludovico Pontecorvo INFN Roma6 Measurements ResolutionTime spectra for all tubes Displacement of wire from nominal position vs tube # Lay 2 Lay 3 Lay 4 Lay 5 Lay 6 Autocalibration

2/4/2001Ludovico Pontecorvo INFN Roma7 Test station Layout Tracker: 2 coordinates angular resolution ~ 2 mrad Modified Calypso Rotating Support: Can accommodate BIS, BIL, BOS chambers Dimensions: Width= 400 cm Height=475 cm Length=180 cm Trigger Hodoscope 60*100 cm 2 Small area trigger 10*10 cm 2

2/4/2001Ludovico Pontecorvo INFN Roma8 Rotating Support Maximum weight:450 Kg Former Calypso Support Enlarged support Rotation is possible for all chambers BIS BIL BOS

2/4/2001Ludovico Pontecorvo INFN Roma9 BOS Test F The BOS chamber will be mounted on the rotating support. F It should provide the RT-Relation to the Barrel Sector Chamber. F Together with the Tracker should provide tracking to the other chambers. F There will be a significative portion of the chamber equipped with electronics. F The chamber could be set up in the H8 Area during August by MPI people and could be tested in the first week of September. Typical test: Autocalibration: Angular scan  ~10 0 small area trigger 30 KEvts/run Autocalibration at large angles: Angular scan  ~ small area trigger 30 KEvts/run T0, Noise, Chamber uniformity, Mechanical precision: Large Area trigger 2 MEvts

2/4/2001Ludovico Pontecorvo INFN Roma10 BIS Test FThe BIS chamber will be mounted on the rotating support. FThe chamber could be set up in the H8 Area in the second week of September by the Greek groups and could be tested in the third week of September. Typical test: Autocalibration: Angular scan  ~10 0 small area trigger 30 KEvts/run Autocalibration at large angles: Angular scan  ~ small area trigger 30 KEvts/run T0, Noise, Chamber uniformity, Mechanical precision: Large Area trigger 2 MEvts

2/4/2001Ludovico Pontecorvo INFN Roma11 Barrel Sector Datcha Rails The main aim of the test of the barrel sector for this year will be to have three chambers mounted on the rails connected to gas system equipped with few electronic channels. Study of the installation issues, perform tracking within the sector and compare with the tracks given by the BOS- Tracker system.

2/4/2001Ludovico Pontecorvo INFN Roma12 Barrel sector (2) BIL chamber: Rome Pavia Groups BML Frascati Group BOL NIKHEF Group Assume the chambers arrive at CERN fully equipped with Gas distribution, faraday cage and few mezanine boards installed. Install the chambers on the DATCHA Rails during August, set up gas connections, set up HV and LV connections, study the grounding and noise conditions on few read out channels. During September perform Data Taking together with the test station chambers.

2/4/2001Ludovico Pontecorvo INFN Roma13 Work to be Done: 2001 F Infrastruct.: Move counting room, Install new Gas system, Install DATCHA Rails, Modify Calypso rotating support, study interfaces between detectors and supports F Detectors: Install small area trigger, Recable Hodo Trigger, Recable and set up Tracker, Install Autocalibration Chambers, Install Sector chambers. F DAQ:Install DAQ-1 Hardware and Software F Monitoring: Implement monitoring task on DAQ-1 system F DCS:Implement at least the DCS ambient parameters reading. F Offline:Implement the new data format decoding, and use data to test the calibration and tracking programs (e.g. CALIB).

2/4/2001Ludovico Pontecorvo INFN Roma14 Work Schedule

2/4/2001Ludovico Pontecorvo INFN Roma15 Goals for the Barrel Sector in 2002 F Install a full Barrel Sector: 2 BIL, 2 BML and 2 BOL chambers on DATCHA Rails, equippe the chambers with electronics. F Install new Gas Sysytem with recirculation F Install the full chamber DCS. F Install alignement system and test it with tracks F Install trigger stations together with BML and BOL, Study installation issues, working condition and interferences between the detectors. F Install first level trigger prototype and test with tracks F Complete the DAQ -1, RPC Read-Out, test of the first and high level triggers.

2/4/2001Ludovico Pontecorvo INFN Roma16 Possible Beam Layout:2002 Full Barrel sector Magnet 20 GeV 50 GeV

2/4/2001Ludovico Pontecorvo INFN Roma17 Possibility to replace the test station with a Magnet: Beam angular spread for Autocalibration. Test the alignement system with different tracks angle needed to test alignement in 3 dimensions. Need to use low momentum beams… Low rates? Why a Magnet?