ILC Calorimetry Test Beam Status Lei Xia ANL HEP.

Slides:



Advertisements
Similar presentations
1 Calice LCUK Bristol 24/03/09 David Ward WP1 : Test Beam.
Advertisements

31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
1 Study of the Tail Catcher Muon Tracker (TCMT) Scintillator Strips and Leakage with Simulated Coil Rick Salcido Northern Illinois University For CALICE.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
18-22 Oct 2010, IWLC2010 in Geneva K. Kawagoe / Kobe University Disclaimer: 27 presentations in 5 sessions on Wednesday/Thursday & Workshop dinner on Wednesday.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
The CALICE Si-W ECAL - physics prototype 2012/Apr/25 Tamaki Yoshioka (Kyushu University) Roman Poschl (LAL Orsay)
Andy White University of Texas at Arlington For GEM DHCAL Group ESTB Workshop SLAC 2012 Introduction KPiX Readout FTBF Beam Test Setup Beam Test Analysis.
Jerry Blazey May 31, 2007 LCWS07 1 SiD: Hadron Calorimetry Jerry Blazey Northern Illinois University LCWS07-Hamburg May 31, 2007.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
SiD Concept – R&D Needs Andy White U. Texas at Arlington SiD Concept Meeting LCWS06 Bangalore, India March 11, 2006.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Event Reconstruction in SiD02 with a Dual Readout Calorimeter Detector Geometry EM Calibration Cerenkov/Scintillator Correction Jet Reconstruction Performance.
GLD Calorimetry 2005/Mar/03 K. Kawagoe / Kobe-U. Introduction Current design –To be optimized for Particle Flow Algorithm (PFA) aiming at 30%/sqrt(E)
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
M. Chefdeville LAPP, Annecy, France. Introduction  Motivations for a Digital hadronic calorimeter Count hits instead of measuring energy deposits Reduce.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
Calorimeter Test Beam Requirements for ILC Detectors Andy White University of Texas at Arlington LCWS08, Chicago, November 2008.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
SiD R&D tasks for the LOI - Subsystem R&D tasks - Summary of SiD R&D - Prioritization of R&D tasks -> Document for DoE/NSF ~Feb 2009 (Mainly based on Marty’s.
Calorimetry and Muon Overview Felix Sefkow LCWS08 Chicago, November 15-20, 2008.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting Argonne National Laboratory March 19 – 21, 2014.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
1 Progress from José Repond Argonne National Laboratory LCWS 2007, DESY, May 30 – June 3, 2007 Emphasis on test beam results.
European DHCAL development European DHCAL development CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY CIEMAT,IPNL,LAL, LAPP,LLR, PROTVINO, SACLAY Status :
José Repond Argonne National Laboratory LCWS, Vancouver, Canada, July 19 – 22, 2006 American Test Beam Plans.
Imaging Hadron Calorimeters for Future Lepton Colliders José Repond Argonne National Laboratory 13 th Vienna Conference on Instrumentation Vienna University.
Performance of Scintillator-Strip Electromagnetic Calorimeter for the ILC experiment Satoru Uozumi (Kobe University) for the CALICE collaboration Mar 12.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
SDHCAL. outline  SDHCAL concept, validation and construction  Test Beam and technological prototype performance  Perspectives and Conclusion  SDHCAL.
I.Laktineh IPNL. Outline  Technological Prototype Present activities To-do List Complementary R&D  SDHCAL for ILD Simulation Optimization study Integration.
Andy White University of Texas at Arlington For GEM DHCAL Group CALOR 2012 Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test Analysis.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
SiD R&D Plan and Opportunities for New Collaborators
Test Beam Request for the Semi-Digital Hadronic Calorimeter
CEPC 数字强子量能器读出电子学预研进展
SiD Calorimeter R&D Collaboration
Dual Readout Clustering and Jet Finding
LC Test Beam Activities
CALICE scintillator HCAL
detector development readout electronics interconnects bump bonding
(My personal) CALICE Report
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
Calorimetry for a CLIC experiment
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
ScECAL+AHCAL+TCMT Combined Beam FNAL
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
Technical Board – DCAL Software
GEM-based Digital Hadron Calorimetry for SiD
Rick Salcido Northern Illinois University For CALICE Collaboration
GEM DHCAL Status and Plans
Michele Faucci Giannelli
LC Calorimeter Testbeam Requirements
Presentation transcript:

ILC Calorimetry Test Beam Status Lei Xia ANL HEP

ILC Calorimeter R&D overview PFA calorimetry –Address very fine granularity needed for PFA jet measurement –Develop readout system to handle huge number of channels –Develop new sensors Dual readout calorimetry –Address single particle energy resolution –Develop dual readout methods to measure EM and HAD shower components separately CALICE collaboration –Many efforts are part of CALICE collaboration –Some efforts are NOT This is NOT an R&D progress report

PFA calorimetry: EM calorimeter CALICE Si-W ECAL SiD Si-W ECAL CALICE Scintillator-W ECAL CALICE MAPS Digital ECAL

PFA ECAL: CALICE Si-W Features Si active layer with fine readout cells (1x1cm 2 →0.5x0.5cm 2 ) R&D well advanced: physics prototype beam test largely done –Standalone test + combined test with CALICE AHCal –Analysis on-going –Comparison with MC simulation Future test beam plan: –2010 (~summer): combined test with CALICE RPC DHCal –Major R&D shift to technical prototype –2010 – 2012: small scale tests expected DESY or CERN) –2012 (if not earlier): technical prototype test (details to be decided) Technical prototype 3x15 cells (my simple definition) Physics prototype: sensor & absorber in place, not readout Technical prototype: readout in place as well (~ ILC module)

PFA ECAL: SiD Si-W ECAL Features Si active layer with very fine readout cells (~0.13cm 2 ) KPiX readout chip to handle large number of channels –Goal is 1024ch/chip (1 wafer) Latest 256ch prototypes (KPiX-8) perform OK 1024ch version by the end of 2009 –Bump-bonded directly onto wafer Multiple trials completed (gold bump-bonds) Beam test plan: –(Physics/Technical) prototype ~2010 –Standalone test Electrons of 5-10 GeV or more, well localized LC-like time structure (for KPiX electronics) Rate of zero,1,2 electrons per bunch Proposed SLAC electron test beam would be ideal –Combined test with HCal prototype: hadron beam

PFA ECAL: CALICE Scintillator ECAL Features small scintillator strips (10x45x3mm 3 ) readout by MPPC Physics prototype constructed and tested –Data analysis on-going Future test beam plan –Small scale test for improved scintillator sensors for ECAL and HCAL planned for the next 3 years –Beam: electrons and hadrons

PFA ECAL: CALICE MAPS Digital ECAL Features Si sensor with tiny cells (~50µm): digital readout (count particles not energy) Sensor test recently at CERN –MIP data as well as some ‘shower’ data Future beam test plan –Early 2010: more sensor test at DESY with electron beam –Currently bidding for summer 2010 CERN beam time for test with higher energy electron –2011: prototype layer (for physics prototype) test at DESY possible –Physics prototype by 2012 Electrons with W Pions with W Pions without W a = 0.9, b = 12.8% a =1.1, b = 16.0%  E /E = a + b/√E(GeV) Particles Energy 20×0.6X ×1.2X 0

PFA Calorimetry: HCAL CALICE Scintillator Analog HCAL (AHCAL) CALICE RPC Digital HCAL (DHCAL) CALICE MicroMegas DHCAL CALICE GEM DHCAL CALICE RPC Semi-Digital HCAL (sDHCAL)

PFA HCAL: Scintillator AHCal Features 3x3cm 2 scintillator tiles and SiPM readout R&D well advanced: 1m 3 physics prototype beam test done –Standalone test and combined test with CALICE ECAL –Analysis on-going –First comparison with MC simulation Future test beam plan –Commission of integrated electronics and tile modules in 2009 –Full cassette test in 2010 –Mini-stack for EM showers in 2010/2011 –Prefer DESY test beam for these tests –Full HCAL technical prototype test is too uncertain for current discussion –Also considering tests with current AHCal layers in a tungsten absorber structure

PFA HCAL: RPC DHCal Features RPC as active medium and 1x1cm 2 pads with digital readout Done tests with RPCs and small stack (slice test) at Fermilab MTBF Currently constructing 1m3 physics prototype –Expect to finish by Spring 2010 –Reuse CALICE AHCal absorber structure Beam test plan –Layer test planned for Feb 2010 –Spring 2010 stand alone test for DHCAL physics prototype (with TCMT) –Followed by combined test with CALICE ECAL (and TCMT) –Test with muon, electron, pion and proton Glass for RPCs Electronic readout components

PFA HCAL: MicroMegas DHCal Features MicroMegas active layer and 1x1cm 2 pads with digital readout Sensor/readout test at CERN –Chamber characterization measured in beam –More tests coming up Future beam test –More sensor/readout test (CERN) –1m 2 layer test –1m 3 “technical prototype” (uncertain at this point)

PFA HCAL: GEM DHCal Features GEM active layer and 1x1cm 2 pads with digital readout Sensor irradiation test in Korea Sensor/readout test at MTBF –Chamber characterization –More tests coming up Future beam test plan at Fermilab MTBF –Late 2009 – early 2010: completion of 30cmx30cm chamber characterization cmx30cm double GEM with 64ch KPiX-7 –Early 2010 – late 2010: 33cmx100cm unit chamber characterization With available KPiX chip –Late 2010 – mid 2011: 1m 2 plane GEM DHCAL performances in the CALICE stack ~5 planes inserted into existing CALICE calorimeter stack Run with either Si/W or Sci/W ECALs RPC planes in the remaining HCAL slots

GRPC 1 GRPC 2 GRPC3 GRPC4 PFA HCAL: RPC Semi-Digital HCal Features RPC as active medium and 1x1cm 2 pads Semi-Digital readout: digital readout with multiple (~3) thresholds Sensor/readout tests at CERN –4-5 small RPC test –1m 2 layer test –Test of RPC built with semi-conductive glass Future test beam plan at CERN –First part of 2010: Test RPCs with different coatings and different techniques (silk screen printing...) Test another 1m 2 layer equipped with the Hardroc2 (second version with 3 threshold and power pulsing) –Second part of 2010: test a part (if not all) of a “technical prototype”

Dual Readout Calorimetry Fiber dual readout calorimeter (DREAM) Totally Active Crystal dual readout

Dual Readout: Fiber (+ Crystal) Features dual readout that measures scintillation light and Cerenkov light on an event by event basis –Neutron measurement also considered Beam test at CERN H4 beam line since 2004 –2004 DREAM module only; e, mu, pi 20 -> 300 GeV –2006 DREAM with two-directional C and S fibers; first test of PWO crystals –2007 PWO as function of angle, beam, and temp. PWO used with DREAM as "calorimeter system" –2008 DREAM+leakage counters; BGO matrix; several crystals vs. angle, particle –2009 DREAM+leakage counters; a few new Cerenkov fibers; BGO matrix; several new crystals; neutron measurements Future test beam plan at CERN H4 –Continue crystal tests; neutron measurements

Dual Readout: Totally Active Crystal Features dual readout and totally active crystal calorimeter Simulation studies underway Beam test planned at Fermilab MTBF –MoU in place –Single crystal test Light yield, Scintillation/Cherenkov separation Different photo detectors and light collection schemes Geometries, etc. –EM-sized module to test the calibration schemes –Full scale module (to much uncertainty at this point)

Summary R&D effortSensor/readout /layer test Small moduleLarge module CALICE SiW ECal2010 – : combined test with DHCal 2012: technical prototype SiD SiW ECal?2010 CALICE ScW ECal2010 – 2012 CALICE MAPS ECal2010 – CALICE AHCal2009 – – 2011 (technical prototype) (current AHCal layers with W) CALICE RPC DHCal (1m 3 prototype) CALICE MicroMegas DHCalYes(“technical prototype”) CALICE GEM DHCal2009 – – 2011 (5 x 1m 2 ) CALICE RPC SDHCal2010 Later 2010 (part of “technical prototype”) Fiber Dual Readout (DREAM)2010 – Totally Active Dual ReadoutYes(Yes) Immediate futureFurther away