Doc.: IEEE 802.11-03/0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 1 WNG SC Committee Report IEEE 802.11, Albuquerque,

Slides:



Advertisements
Similar presentations
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Advertisements

Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /864r0 Submission November 2003 Clint Chaplin, Symbol TechnologiesSlide 1 SG Operating Rules Anybody can vote, present, and make motions.
Doc.: IEEE /1424r1 Submission Nov 14-19, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Antonio, Texas, Nov 14-19, 2004.
Session Overview November , 2003 Jerry Upton- Chair Gang Wu – Procedural Vice Chair Eshwar Pittampalli – Liaison Vice.
802.11k Berlin Agendas Richard Paine
Instructions for the WG Chair l At Each Meeting, the Working Group Chair shall: l Show slides #1 and #2 of this presentation l Advise the WG membership.
Doc.: IEEE /0661r2 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: IEEE /663r TGs Mesh Networking Agenda July 2004 Donald Eastlake 3rd, Motorola LaboratoriesSlide 1 IEEE s: ESS Mesh Networking.
Doc.: IEEE /1702r0 Meeting Report September 2006 Pat R. Calhoun, CiscoSlide 1 Report of TGv – November 2006 DATE: November 2006 Author(s) NameCompanyAddressPhone .
Doc.: IEEE b Submission November 2004 Robert Poor, Ember CorporationSlide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0755r1 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: 802_Handoff_Opening_Notes_r1 Submission November David Johnston, IntelSlide 1 IEEE 802 Handoff ECSG Chair’s Introduction David Johnston
xx session2_opening_notes.ppt Submission May 2004 Ajay Rajkumar, Chair, Slide 1 IEEE Session #2 Opening Session Ajay Rajkumar.
Opening Plenary Presentation Session #4 Gary Robinson – Chair Mark Klerer – Jerry Upton Vice-Chairs IEEE /14.
Doc.: IEEE /0684r2 Submission July 18-22, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , San Francisco, California, July 18.
Doc.: IEEE /706r1 Submission September 2003 Richard Paine, BoeingSlide k Singapore Agendas Richard Paine
Doc.: IEEE /0849r0 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 1 WNG SC Committee Report IEEE , Albuquerque,
Doc.: IEEE /0747r0 Submission May 2006 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp May Opening Presentation Notice: This document has.
Doc.: IEEE /0913r1 Submission Sep 19-23, 2005 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Orange County, California, September.
Doc.: IEEE /1149r4 Submission November 2004 Donald Eastlake 3 rd, MotorolaSlide 1 IEEE s: ESS Mesh Networking Task Group San Antonio, Texas.
January 17, 2005Chair, IEEE Opening January 2005 Plenary Session #12 Jerry Upton- Chair Gang Wu – Procedural.
Doc.: IEEE /0646r0 Submission July 2005 Richard Paine, BoeingSlide 1 11k Cairns Agendas Notice: This document has been prepared to assist IEEE.
October 2003 Richard Paine, BoeingSlide 1 doc.: IEEE /851r0 Submission k Seattle Agenda 10/15/03.
Doc.: IEEE /0755r0 Submission July 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Portland, Oregon, July 12-16, 2004.
Doc.: IEEE /0392r0 Submission July 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
March 2006 Richard Paine, BoeingSlide 1 doc.: IEEE /0261r0 Submission 11k Denver Ad Hoc Agenda Notice: This document has been prepared to assist.
July 2003 Brian Mathews - AbsoluteValue Systems, Glyn Roberts – ST Microelectronics IEEE doc: IEEE / Submission Publicity Committee /.15.
Doc.: IEEE /276r2 Submission March 2004 Richard Paine, BoeingSlide k Orlando Agendas Richard Paine
Doc.: IEEE /024r1 Submission Jan 12-16, 2004 TK Tan (Philips) Slide 1 WNG SC Committee Report IEEE , Vancouver, Canada, Jan 12-16, 2004.
Doc.: IEEE /0661r0 Submission November 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
Doc.: wng Submission - Study Project Proposal WPP - Introduction November 2003 Pratik Mehta, Dell Inc.Slide 1 IEEE WNG Study Project.
Doc.: IEEE /0945r0 Submission November 2003 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 Wireless Access in Vehicular Environments (WAVE)
Doc.: IEEE /161r0 Submission January 2004 Al Petrick, IceFyre Semiconductor Slide WG Technical Editor’s Report January 2004 Interim Meeting.
IEEE s: ESS Mesh Networking Task Group
Siemens, Roke Manor (Recording Secretary )
802.11k Albuquerque Agendas Richard Paine
Siemens, Roke Manor (Recording Secretary )
802.11k Orlando Agendas Richard Paine
IEEE r: Fast BSS Transition TG
Submission Title: [WG-TG3b Meeting Report Sept04]
802.11k Singapore Agendas Richard Paine
802.11k Singapore Agendas Richard Paine
IEEE s: ESS Mesh Networking Task Group
11k Vancouver Ad Hoc Agenda
Instructions for the WG Chair
平成30年11月 doc.: IEEE /424r1 January 2006
IEEE s: ESS Mesh Networking Task Group
IEEE ESS Mesh Study Group
WNG SC Committee Report IEEE , Berlin, Germany, Sep 13-17, 2004
APF Study Group Agenda September 13, 2004 September 2004
Bruce Kraemer, Intersil (Vice-chair)
WAVE Opening Report September /1068 r0
Siemens, Roke Manor (Recording Secretary )
IEEE s: ESS Mesh Networking Task Group
TGu Agenda Date: Authors: January 2007 January 2007
Siemens, Roke Manor (Recording Secretary )
WNG SC Opening Report IEEE , DFW, Texas Mar 9-14, 2003
doc.: IEEE /479r0 Mika Kasslin TGh chair
Submission Title: [WG-TG3b Meeting Report Sept04]
802.11k Singapore Agendas Richard Paine
Doc.: IEEE /423r1 July 2001 Mar 15-19, 2004 WNG SC Committee Report IEEE , Orlando, Florida, March 15-19, 2004 TK Tan, Philips (Chair)
Siemens, Roke Manor (Recording Secretary )
802.11p WAVE Opening and Agenda November p
Stephen McCann, Siemens Roke Manor
IEEE ESS Mesh Study Group
Doc.: IEEE /423r1 July 2001 Mar 15-19, 2004 WNG SC Committee Report IEEE , Orlando, Florida, March 15-19, 2004 TK Tan, Philips (Chair)
平成31年7月 doc.: IEEE /424r1 May 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Opening.
Stephen McCann (Chair)
IEEE s: ESS Mesh Task Group
Presentation transcript:

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 1 WNG SC Committee Report IEEE , Albuquerque, New Mexico, Nov 10-14, 2003 TK Tan, Philips (Chair) Bruce Kraemer, Intersil (Vice-chair)

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 2 Agenda Overview Monday Sep 104:00 – 6:00 pm Administration/Minutes/Agenda Industry Updates MMACUmehira, Inoue ESS Mesh Network Interconnection ConsiderationsAoki ESS Mesh NetworkingConner/Ecclesine Monday Nov 10 7:30 – 9:30 pm Radio Regulatory UpdateStevenson Open

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 3 Agenda Overview (cont) Wednesday Nov 128:00 – 10:00 am Radio Regulatory UpdateStevenson Security MaintenanceChaplin Wireless Performance Predicton (WPP) Berger WPP - Test tools and parameters WPP - The technology developers perspective WPP - Issues of devices and system developers WPP - The challenge faced by end users

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 4 Agenda Overview (cont) Thursday Nov 138:00 – 10:00 am Wireless Interworking WLAN Control WLAN Co-existence of different authentication models WLAN Hotspot Thursday Nov 1310:30 – 12:30 pm Update on FCC 4.9 Ghz MeetingEcclesine Requirements for ESS mesh network development Hudak Update on Radio Resource Measurement (Joint session with TGk)Worstell

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 5 Joint Meeting with TGk Presentation by Worstell wng-need-managed-ieee devices.ppt Straw Poll: 57/1/9 on forming a SG to look into management of wireless devices Topics discussed –Antenna Selection, load balancing, rogue and service handling, client roaming and dynamic adaptation of clients were discussed. How will dot 11 devices get managed? At Vancouver meeting, a SG request will be made in WNG SC. Discussions on WPP and how it differs from TGk

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 6 WNG motion #1 Move that WNG request Working Group to form a Study Group for IEEE ESS Mesh Results: 50/0/9

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 7 History of ESS Mesh Discussions in WNG Technical presentations and discussions have taken place at every meeting since March Candidate PAR and 5 Criteria have been discussed in WNG: – /759r2 and /760r3 Next logical step is to form a SG to provide the membership with an opportunity to refine the scope and constraints for a mesh TG

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 8 Scope of Proposed ESS Mesh Study Group The proposed study group will investigate the need to extend IEEE for providing an Extended Service Set (ESS) Mesh with an Wireless Distribution System (WDS) that supports efficient broadcast/multicast and unicast delivery over self- configuring multi-hop topologies. The expected outcome of the SG is a PAR and a 5 Criteria document that will be submitted to the IEEE Working Group so that a Task Group can be formed.

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 9 Motivation for IEEE ESS Mesh Standardization Mesh topologies are applicable to both mobile and fixed-infrastructure environments Potential benefits: –Extended range and coverage, without requiring additional wires (convenient deployment, cost) –Enhanced redundancy, reliability –Efficient utilization of limited radio channel capacity –Interoperability

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 10 WNG motion #2 Move that WNG request Working Group to form a Study Group for Wireless Performance Prediction (WPP) Results: 36/14/15

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 11 Motivations Currently there is no generally accepted method for predicting or evaluating performance of systems –The metrics and methodologies used are inconsistent –Measurement efforts thus provide widely varying results – non uniformity Need a common set of tests to measure and predict performance of the end device

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 12 Expectations from the SG Common metrics and test methodology definition –Usable during development of implementations that adhere to standards –Tests that combine the industry best practices that can be used consistently across different devices, while still enabling each device to optimize on the metrics based on its own objectives

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 13 Differentiation from TGk TGk is about live measurements to aid management and tuning of the wireless network during operation WPP is about off-line performance measurements and tests TGk defines protocol aspects WPP does not define protocols TGk defines measurements that are done by the devices themselves WPP defines measurements done to the devices

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 14 Conclusion Industry benefits from a uniform set of wireless performance prediction metrics and tests –Developers, Customers, End Users, Reviewers Enable Fairness –Provide the uniform set of rules for evaluations Systematize the functional requirements and comparison criteria for future SGs/TGs in WG

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 15 Relevant docs wng-wng_sc_report. WNG Standing Committee Report i-security-maintenance.ppt Security Maintenance wng-wlan-control.ppt wng-wng-minutes-september-2003.doc wng-Co-existence of different authentication models wng-Hotspot-Evolution wng-mmac-updates-november-2003.ppt wng-ess-mesh-network-interconnection-considerations.ppt wng-requirements-ess-mesh-network-development.ppt wng-rf-performance-testing.ppt wng-wpp-simulating-field-performance.ppt wng-wpp-user-experience.ppt wng-wpp-approaches-to-issue.ppt wng-wpp-summary-work-plan-&-proposal.ppt wng-wpp-introduction-&-overview.ppt wng-us-4-9-update-november-2003.ppt wng-need-managed-ieee devices.ppt

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 16 Vancouver Agenda/Objectives Updates from WIG, ETSI-BRAN. MMAC, radio regulatory Liaison Updates Review and discuss WIG #6 activities and presentations Prepare for IEEE Plenary, March 2004

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide Review IEEE/802 & Policies and Rules Standing Committee: Everyone Votes. All 802 policies apply All policies apply Submissions must meet document format criteria. For document number & submissions –802wirelessworld.com

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. IEEE-SA Standards Board Bylaws on Patents in Standards

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 19 Inappropriate Topics for IEEE WG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002

doc.: IEEE /0849r1 Submission Nov 10-14, 2003 TK Tan, Philips, Bruce Kraemer, Intersil, Slide 20 November Objectives/Plans Updates –MMAC –Radio Regulatory Update –WIG –Others ESS Mesh networking Wireless Performance Prediction WLAN & 3G interworking Security Maintenance