QMWG Report to WMS S. Looney April 9, 2014. NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
Discussion of MOD Comparison to ERCOT Requirements Luminant OWG, May 21,
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
Section 5.9 – added export language Each ERS Generator site must have an interconnection agreement with its TDSP prior to submitting an ERS offer and must.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
RATF Report to WMS Report of RATF meeting held March 3, 2014.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
The Wholesale Market Subcommittee Update Prepared for the September 25th TAC meeting.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Protocol Revision Subcommittee Sandy Morris December 1, 2011.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
QMWG Update to WMS S. Looney February 5, NPRRs Referred by WMS NPRR589, Ancillary Service Offers in the Supplemental Ancillary Services Market –
October Project Release (NPRRs 710, 706, 698 and 595) ERCOT Operations & Market Operations WebEx Training October XX, 2015.
1 WMS Report To TAC May In Brief One Working Group Reports One Working Group Reports Two Task Force Reports Two Task Force Reports One Staff report.
July 30, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 4, 2015 TAC Update to RMS 1.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
Report to TAC July In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG DSWG MCWG MCWG MWG MWG QMWG QMWG VCWG VCWG Task Forces Task.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
DSWG Update to WMS 12/2/2015. NPRR738 ERS Performance Calculations During TDSP Outages A utility outage can prevent ERS Generators from exporting to the.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Next Steps on Reserve Discount Factor and 2016 Ancillary Service Methodology ERCOT Staff Date 02/25/2016.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Text reason for Deviation from Defined High Sustained Limit/Low Sustained Limit John Adams January 5, 2010 Nodal Advisory Task Force.
The Wholesale Market Subcommittee Update Prepared for the July 31st TAC meeting.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Exceptional Fuel Costs in LMP
Resource Cost Working Group
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Presentation transcript:

QMWG Report to WMS S. Looney April 9, 2014

NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load Resources providing RRS based on actual telemetry of the load – Does not change AS settlement – More reflective of the actual reserves on the system – No consensus opinion at QMWG, recommendation should be based on cost benefit analysis of project cost

Assignments from WMS Review ways to better ensure capacity during cold weather events – Do not want to restrict ERCOT’s ability to RUC Resources on early – If a QSE buys out of an early RUC, ORDC does not help because it will be during offpeak hours when there is excess capacity on the system – The current settlement for RUC make-whole of minimum energy cost forces Resources to lose money when RUC’d on early – Recommendation is to revise the settlement of losses on minimum energy during offpeak hours for Resources on RUC. (This change may not be feasible due to system change cost.)

Assignments from WMS Issues related to early release of HASL to SCED – Deferred the discussion, ERCOT bringing a proposal to WMS Definition of HSL on combined cycles with power augmentation providing RRS – EDF will submit an NPRR – Allowing a Resource to calculate and telemeter its HASL in these cases is a better solution – NPRR524 and NPRR527 should fix this when implemented later in Allows a portion of the RRS to be non- frequency responsive and requires telemetry of the portion of RRS on a Resource that is not immediately frequency responsive.

Assignments from WMS Concerns with Interconnection Handbook and Commissioning Checklist – No comments have been submitted – Mike Noth, LCRA, will contact ERCOT to schedule Webex to discuss Reactive Testing issues – Changes to NDCRC testing forms in April system release, presentation on March 26 QMWG meeting page – For other reactive testing questions, refer to June 14, 2013 presentation on QMWG meeting page

Assignments from WMS Review testing requirements for all resources including Load and ERS – Marguerite Wagner will take this assignment. Concern about ORDC Bandwidth and price oscillation – Discuss at next meeting Evaluate the root cause of reserve unavailable during EEA – Errors in reporting HSL, ERCOT has unannounced testing to verify HSLs. – Weather-related startup failure, ERCOT has weatherization plans and incident RFIs for generator trips. – Should QMWG study either of these issues further?