COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) October 2015 Update to COPS.

Slides:



Advertisements
Similar presentations
Nodal Credit Limit Overview Credit Work Group May 28, 2008 Cheryl Yager.
Advertisements

Data Extracts Working Group (DEWG) Update Tuesday, September 25, 2006.
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
9/13/2007 Nodal COMS Extracts & Reports Market Requirements Review SDAWG Jackie Ashbaugh ERCOT ***NOTE: All information contained in this presentation.
May 18, 2009 SEWG Dispute due dates when extracts are delayed Art Deller.
Zonal ADR Resettlement & Data Retention ERCOT CSWG 04/20/2015.
Chad V. Seely Assistant General Counsel Tab 6.2: User Fee – Digital Certificate Fee Finance & Audit Committee Meeting ERCOT Public November 12, 2012.
Draft Dispute NPRR and NPRR 75 A comparison for COPS.
ERCOT Billing, Settlement Disputes & Data Extracts
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
November 10, 2009 NOIE DRG Settlements TF update to COPS Settlement Discussion for ALL DG < or = 1 MW Don Tucker on behalf of the NOIE DRG Settlements.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
Texas Nodal Section 9: Invoicing ERCOT, Settlements & Billing SDAWG - August 2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Commercial Operations Subcommittee (COPS) January 2014 Update to TAC 1/29/2015.
March 11, 2008 Texas Nodal Market Redesign Program Commercial Operations Subcommittee.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
COMS Nodal Commercial Systems Project Update COPs Meeting May 2007 By Bill Barnes and Justin Rasberry.
Nodal Program Update and SEWG Update COPS 3/12/2011 Jim Galvin.
Nodal Program Update and SEWG Update COPS 5/10/2011 Jim Galvin.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
July 06, 2006 – TAC Meeting 1 TPTF Update Trip Doggett.
Resource Cost Working Group October 7, 2015 WMS Update.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
ERS Update – DSWG Presentation September 21, 2012.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Nodal Short Pay and Uplift Process CWG Meeting May 28, 2008.
N ODAL P ROGRAM U PDATE TO C OPS Jim Galvin.
COPS NOVEMBER 2012 UPDATE TO TAC 11/29/2012 Harika Basaran, Chair Tony Marsh, Vice Chair.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Nodal Market Settlement and Invoicing Timeline ERCOT COPS Meeting January 9, 2006 Eric Woelfel, Formosa Utility Ventures Jim Galvin, Tenaska Power Services.
Harika Basaran 11/05/2014 TAC October 23, 2014 Meeting Update to Commercial Operations Subcommittee.
Small Resettlements A Proposal to Reduce Impact on ERCOT and Market Participants.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
COPS NOVEMBER 2012 UPDATE TO TAC 11/01/2012 Harika Basaran, Chair Jim Lee, Vice Chair.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
CCWG April 28 th Meeting CCWG Update to COPS May 12,
Commercial Operations Subcommittee (COPS) Update to RMS 11/3/2015.
Market Notices – Current State Ted Hailu Communications and Settlements Working Group (CSWG) ERCOT Public July 28, 2014.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Retail Workshop ERCOT Nodal Update October 06, 2010.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
COPS JULY 2013 UPDATE TO TAC 07/02/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
CSWG Update Blake Holt ERCOT CSWG 10/20/ Thanksgiving Settlement Schedule 12/01/2014 (M) 12/02/2014 (T) 12/03/2014 (W) 12/04/2014 (Th) 12/05/2014.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Lead from the front Texas Nodal 1 Registration Market Call Nov 14, 2008.
NPRRs 705NPRR Provides Consistency for References to the End Date of the Generation Interconnection Process. In the Resource Interconnection Handbook,
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Commercial Operations Subcommittee (COPS) 4/15/2015 Update to RMS 5/5/2015.
Technical Advisory Committee Commercial Operations Subcommittee Update to TAC Debbie McKeever COPs Chair 2011.
DEWG/SDAWG Meeting Summary Report to COPS 11/11/2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
Commercial Operations Subcommittee (COPS) Update to RMS 11/1/2016
Nodal COMS Additional Items Update
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
ERCOT Holiday Interim Solution
Settlements Analysis due to SFT Deration Issue
COPS MAY 2014 UPDATE TO TAC 5/29/2014
Energy Storage Settlements Consistent with PUCT Project & NPRR461
CCWG September 29th Meeting
Presentation transcript:

COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) October 2015 Update to COPS

Versioning Price Resettlement In Settlement data extracts, Settlement Type refers to the Settlement iteration for the datum. Channel 1, 2, etc. This allows MPs to verify discrete resettlements, with unique data sets. The exception to this are the Real-Time Settlement Point Prices. In cases of price change (eg. June 2015.), RTSPP and RTSPPEW show as Ch 1, even though Ch 1 already exists in MP systems. At this time, ERCOT cannot accommodate the request because pricing does not go through Data Aggregation where the Settlement Type is associated. Versioning will be incumbent upon MPs to find a way to distinguish and store.

ERCOT reporting Nodal Protocol 8.2 – Settlement Stability (e)Settlement stability: (l)ERCOT shall calculate and post on a quarterly basis all charges allocated to Load for all Qualified Scheduling Entities (QSEs) for each month and year-to-date expressed in total dollars and for the total, dollars per MWh. Concern over phrase “cost to serve Load” and the need for several different Load denominators will be dealt with in footnotes to the quarterly report.

Proposed NPRR – Balancing Account Data Cuts The CRR Balancing Account Extract is to provide Market Participants with a prototype of the CRR Balancing Account invoice. Without the prior month balance, currently shown in Nodal Protocol as CRRBAF (m-1), the calculation cannot be verified from the month’s extract. The inclusion of the prior month data cut would align Nodal Protocols with the COPMG and the Balancing Account Extract User Guide. CSWG will consider an NPRR to add the needed determinant and if approved, bring back to COPS.

Next CSWG Meeting Monday, October 26, 2015 ERCOT Met Center, Rm 168 at 1:30pm (later to accommodate DREAM TF attendance)