ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May.

Slides:



Advertisements
Similar presentations
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Advertisements

SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
1 Collaboration%20Meetings/SMTF%20Collaboration%20Meeting.
RF Unit Test Facility at NML & CM1 Test Plan Bob Kephart Fermilab IWLC-10 October 20, 2010.
US Cavities Status and Plan Mark Champion 01 October 2009.
ANL-FNAL Collaboration Meeting: Superconducting RF ANL: Mike Kelly, Scott Gerbick, Bill Boettinger (NE) FNAL Collaborators: Kerry Ewald, Cristian Boffo,
Shekhar Mishra, Fermilab Mark J. Oreglia, Univ. of Chicago
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
F Status and Plans for SRF Facility Sergei Nagaitsev May 18, 2007.
ILC R&D at Fermilab Robert Kephart. ILC Americas f Fermilab May 15-18, 2006FY06 DOE Annual Review2 Outline Fermilab ILC Goals Fermilab’s role in the GDE.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
Cryomodule Design and R&D during the EDR phase Robert Kephart With input from the T4 CM Collaboration.
F February 27, 2006 Fermilab Budget Briefing 1 Fermilab Budget Overview International Linear Collider FY05 - FY08 Bob Kephart February 27, 2006.
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
ILC/SRF R&D Robert Kephart. 9/25/2007 R.D. Kephart DOE Annual Review 2 Outline Fermilab ILC Goals Fermilab’s role in the GDE & the ILC machine design.
Cryomodule Development at Fermilab Don Mitchell Representing the SRF engineering community at Fermilab April 20, 2009 Tsukuba, Japan TILC09.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal Shekhar Mishra (Hasan Padamsee, John Mammosser, Mike Kelly) For the WBS 9 Collaboration.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Status of U.S. Cavity & Cryomodule Industrialization Bob Kephart LCWS10/GDE Beijing, March, 2010.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Hydroformed Multi-Cell Cavities. Update Waldemar Singer, DESY Peter Kneisel, JLab.
ILC Cryomodule Industrialization in the U.S. R. Kephart (+ H Padamsee )
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
1 Project X Workshop November 21-22, 2008 Richard York Chris Compton Walter Hartung Xiaoyu Wu Michigan State University.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Cryomodule Safety Approvals Jay Theilacker LCLS-II Production Cryomodule Final Design Review May 12-14, 2015.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
SRF Infrastructure Changes Required for a CW linac Robert Kephart FNAL AAC Meeting November 16, 2009.
ILC-HiGrade annual meeting - 22 November 2010 ILC-HiGrade Meeting Cavity-Treatment at CEA Saclay (WP6) F. Eozénou.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
July 5th,2006John Mammosser, Jlab ILC – Electropolish Development (EP) Plans/Progress/Problems/Performance Jefferson Lab J. Mammosser, L. Phillips, C.
Status and plans for the 3.9 GHz section of XFEL
ILC R&D Board Meeting: SRF Cavities Status and Plans
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
for the FNAL/ANL, JLab, and Cornell cavity teams
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
ILC Cavity & Cryomodule Overview
Cavity and Cryomodule R&D
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
ILC Cryogenic Systems Draft EDR Plan
Highlights from EU Global Design Effort
IHEP Cryomodule Status
Nick Walker (DESY) EU GDE Meeting Oxford
Presentation transcript:

ILC Americas Cavity and Cryomodule R&D Shekhar Mishra ILC Program Fermilab Talk presented at DOE Annual Program Review Breakout Sessions – Wednesday, May 17

ILC Americas ILC Cavity and Cryomodule R&D Goals ILC R&D at Fermilab is focused to address the high priority ILC design and technical issues as recommended by ILC-TRC and recently by ILC-GDE R&D Board. The main thrust of the ILC Cavity and Cryomodule R&D is to establish technical capabilities in the Superconducting Radio Frequency (SRF) Cavity and Cryomodule technology. The main goals are –Cavity technology development in the US to routinely achieve > 35 MV/m and Q ~0.5-1e10, –ILC Cryomodule design, fabrication (cost reduction) –Fully tested basic building blocks of the Main Linac (Evaluate the integration, reliabilities issues and value engineering). –LLRF, Instrumentation and Controls development for Main Linac Development of U.S. laboratories and industrial infrastructure for the fabrication, processing and testing of high performance SRF cavities, Coupler, Tuner, HOM and Cryomodule.

ILC Americas Plans for 35 MV/m Cavity Fabrication, Preparation, Surface Processing, Clean Surface and Clean environment is the key to achieving a high gradient in the ILC cavities. Fermilab is leading the US effort with collaborating laboratories. –Niobium is being scanned at Fermilab. (Need larger inventory. There are variation from batch to batch, vendor to vendor etc.) –Cavity is being fabricated at industry under the supervision of Fermilab and Cornell. Jlab will join this soon. –Cavity is being processed (BCP and EP) and vertical tested at Cornell, Jlab and will be processed at ANL/FNAL The processing infrastructure needs more focused effort. Experiences from DESY and KEK suggest that we build this facility at where cavity is dressed, horizontally tested and put in a string. We are in process of having this facility at Fermilab by 07. Fermilab is fabricating 8 (FY05), 16(FY06), (FY07) ILC cavities. More could be needed to These cavities will be systematically processed and testing. We would systematically collect data during the fabrication, processing and testing. These data would be analyzed for co-relations to understand the process.

ILC Americas ILC Cavity: R&D Material R&D: Fine, Large, Single Crystal Fabrication –A number of minor modifications and improvements could be implemented without impact to the basic cavity design. Cavity Preparation Buffer Chemical Processing Cavity Processing R&D –Electro-polishing (EP) System –High Pressure Rinsing (HPR) –Clean Assembly Procedure

ILC Americas Cavity Fabrication Industrial production of the cavity by Fermilab (ACCEL, AES) 8 TESLA Design Cavities ordered 10 ILC Baseline Design Cavities in FY06 Cavity fabrication at Jlab 2 ILC Baseline design and Type-IV 2 Low Loss Cavity Several single cell for Process and Material R&D Material R&D (Fine Grain, Large Grain, Single Crystal) Cavity fabrication at Cornell Re-Entrant Cavities (70 mm) Re-Entrant Cavities (60 mm) Several single cell for Process R&D Cavity fabrication at KEK (US-Japan) Cavities of TESLA, Low Loss and ICHIRO design

ILC Americas Cavity Fabrication, Processing and Testing Road Map Cavity Fabrication By Industry Cavity Dressing & Horizontal Fermilab BCP and EP Cornell BCP and EP Jlab BCP and EP ANL/FNAL Vertical Cornell Vertical Jlab Vertical FNAL Exists Developing

ILC Americas Cavity Measurements RF measurement of the ACCEL Cavities at Fermilab.

ILC Americas ILC Cavity Material Grain size R&D at Jlab Study of Single Cell large grain niobium from CBMM, Heraeus and Ningxia 5 single cell cavities each from these vendors will be fabricated for statistics. Two 9-cell cavities are being fabricated for Fermilab using CBMM ingot. Ningxia Heraeus

ILC Americas 50 MV/m in Single Cells ! Lower Surface Magnetic Field & Lower Losses Re- entrant Cornell KEK Low Loss Jlab KEK Tesla Shape Need Multi-cells Next New Shapes Breakthrough

ILC Americas Fabricated at Cornell Proof of Principle Results: Eacc = MV/m /Ichiro

ILC Americas 60 mm aperture similar to LL shape -> 16% lower Hpk/Eacc New Reentrant Cavity Shape Work done in Collaboration with KEK

ILC Americas ILC Cavity Processing We are using infrastructures at the collaborating laboratories to develop the processing capabilities and parameters in USA to achieve 25 MV/m with BCP and 35 MV/m with EP. These facilities are also being used to train people. Cornell: –BCP and HPR –Vertical EP Jlab –EP Fermilab and ANL (New Facility) –BCP –EP We are also sending Fermilab staff to DESY for participation and training in surface processing, vertical and Horizontal testing.

ILC Americas Check Reproducibility of HPR Cornell Re-entrant Cavity Work done in Collaboration with KEK

ILC Americas BCP Complete First ACCEL ILC Cavity at Cornell HPR Complete

ILC Americas Vertical Test of ACCEL Cavity Fermilab is sending engineering staff and technician to participate in the BCP and vertical testing at Cornell. 60 um BCP (nominal) + 50 um at ACCEL Low Field: Q >10 10, E acc = 17 MV/m, (Quench) Q E acc (Mv/m)

ILC Americas Goals for EP Development at Jlab Establish EP processing for ILC 9-cell cavities at Jlab Commissioning EP cabinet with Spare DESY 9-cell cavity Perform HPR, assembly and testing with S35 cavity to analyze procedure effectiveness and reproducibility Investigate standard process procedures to gain a better understanding of current issues (Sulfur precipitation, HF loss during use) –Identify and develop relevant process metrics and QA steps Establish and document procedures –Aim is uniform reproducible etching with clean surfaces after rinsing Process, test, qualify and prep cavities for FNAL string assembly

ILC Americas HPR and Assembly Alignment Cage Electropolish Development for ILC Jlab EP Cabinet

ILC Americas EP System Alignment Frame and Cathode with ILC Cavity

ILC Americas ILC Surface Processing Facility Development at ANL/FNAL The Joint ANL/FNAL Superconducting Surface Processing Facility (SCSPF), located at Argonne National Laboratory, is a major chemical processing facility capable of electro-polishing and buffered chemical polishing a large quantity and variety of superconducting structures. This BCP part of the facility is ready and going through the safety approval. It is expected to be operational end of 06. An initial plans has been developed for an EP facility to be build (FY06-07) at ANL/Fermilab Surface Processing Facility at ANL. This facility should include the knowledge of EP from the ILC Collaboration.

ILC Americas Cryomodule Design and Fabrication In FY05 Fermilab started on converting the DESY/INFN design of the ILC cryomodule (Type-III+). We have formed an ILC Cryomodule working group that is working towards a design of an ILC cryomodule. This design will evolve. The Goal is to design an improved ILC cryomodule (Type-IV) and build one at Fermilab by FY08. High Power testing of the cavities and the fabrication of 1st ILC cryomodule with new design 2008.

ILC Americas Cryomodule Fabrication Plans for an RF Unit test at ILCTA Cryomodule 1Cryomodule 2 Cryomodule 3 Dressed Cavity Provided By DESY Cold Mass By DESY/INFN Cryomodule Assembled at Fermilab March 07 Standard Length Cavity Purchased By Fermilab BCP & VT At Cornell EP & VT At Jlab Cold Mass From Zanon By Fermilab Dressed and HT At Fermilab Dec 07 Mid 08 ILC Length Cavity Purchased By Fermilab (AES/Jlab) BCP & VT In USA EP & VT In USA Dressed New Design and HT At Fermilab Cold Mass Type-IV From US Company By Fermilab

ILC Americas 1 st US Assembled Cryomodule: Fermilab, DESY and INFN DESY will send Fermilab eight 9-Cell 1.3 GHz dressed and horizontally tested cavities. –The present schedule for the delivery of these 8 cavities is around end of DESY will attempt to advance this schedule. DESY and INFN have ordered two cold masses for Type-III cryomodules from Zanon. –DESY will send one of these cold masses to Fermilab for the 1st cryomodule assembly at Fermilab. –It is expected that this cold mass will be available about Sept.-Oct Some parts for the 1.3 GHz cryomodule are not provided by Zanon but rather by INFN. –It was agreed that INFN will send these associated parts to Fermilab and provide parts needed for a 3rd cold mass. –INFN-DESY will also send the assembly documentation to Fermilab. Fermilab will work to achieve the earliest possible delivery date for the DESY four cavity 3.9 GHz cryomodule. This is currently expected to be early in 2007.

ILC Americas ILC Cryomodule Design Considerations Move quad package to middle of cryomodule to achieve better support and alignment. Shorten cavity-to-cavity interconnect and simplify for ease of fabrication and cost reduction. Possible superconducting joint. Overall improved packing factor. Minimize direct heat load to cavity through MC. Simplify the assembly procedure. MLI redesign to reduce hands-on labor costs. More robust design to survive shipping. Reliability of tuner motors in cold operation. Etc. (we’ve heard many suggestions)

ILC Americas ILC Cryomodule: Conceptual Model

ILC Americas Increase diameter beyond X-FEL Increase diameter beyond X-FEL Review 2-phase pipe size and effect of slope Change in Cryogenic Distribution

ILC Americas ILC Cavity Spacing, Dimensions with Blade Tuner Blade Tuner 35068mm mm Active length = mm x 24 cavities = mm Packing Factor = / = 0.71

ILC Americas 1 st Cryomodule Assembly Plans Cavity String Assembly Procedures & Fixtures Learning at DESY (February 20 –March 3) –A draft traveler was written during this visit. It is currently being reviewed by Axel Matheisen for comments. –Tooling & Fixturing used to assemble the cavity string were identified. Drawing were brought back to Fermilab. –Assembly sketches, movies and took a lot of pictures and notes. Cryomodule #6 Assembly Procedures Learning at DESY (May-June 06) CAF Infrastructure ready & operational: May-June 06 –MP9 Clean Room installation finished –Cold Mass and Vacuum Vessel Assembly Fixtures received at Fermilab. –Cavity String Assembly Fixtures are being fabricated to be installed Assemble 1 st Cryomodule (4 months): Start date depends when we receive the kit from DESY

ILC Americas Cavity and Cryomodule Assembly Fixtures

ILC Americas FY07 Plans: Cavities & Cryomodule The FY07 plan of the ART will be the continuation of the plan we are undertaking in FY07. Cavity Fabrication –ILC Design –New Shape (LL and RE) –Fine, Large and Single Crystal –R&D on material, fabrication etc –3.9 GHz deflecting cavity design and fabrication Cavity Processing and Vertical Testing –BCP, EP and Vertical Testing at Cornell –BCP, EP and Vertical Testing at Jlab –BCP, EP and Vertical Testing at FNAL/ANL (New Facility) –R&D on surface treatment Cryomodule Design and Fabrication –Type III+ Fabrication –Type IV Design US Industrial involvement in Cavity and Cryomodule Design and Fabrication Enhanced University participation in ILC R&D

ILC Americas Summary US-ILC Main Linac: Cavity and Cryomodule R&D program is established to address the key technology issues. –Cavity Gradient –ILC Cryomodule design and fabrication R&D is focused on the Baseline design of the cavity and cryomodule. We are also working on alternate design for Cavity and material. We are upgrading existing infrastructure at US laboratories to cost effectively advance the R&D program on a ambitious schedule. We are developing infrastructure at Fermilab for cavity processing and testing and fabrication of cryomodule. We are leading the ILC effort in the ILC Cryomodule design. We are working with US industry in fabrication. We are also working with US industry in ILC Cost Study.

ILC Americas Could lab really spend the Money Faster on ILC than its currently funded? Yes, Yes and Yes Fermilab has qualified scientists and engineers who wants to work on ILC. We continue to defer investment that would be needed for more focused R&D. –Cavity R&D: (This is the highest R&D priority for ILC-GDE) Niobium More cavities fabrication at industry. We should fabricate enough to saturate the pipeline at existing and upcoming processing facilities. Electron Beam Welding Surface Processing: We need a pre-production BCP, EP and HPR system at Fermilab Vendor development –Cavity Tuning Device ( A copy of DESY Design) –Vertical testing temperature study –Cryomodule Testing –10 MWatt Klystron –Cryogenic plant –Industrial fabrication US industries could fabricate an RF unit using laboratory infrastructure.

ILC Americas FTE in ILC R&D at Fermilab: FY06 and FY07