SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

SPP-Entergy Market Power Analysis Presented By: David B. Patton, Ph.D. President, Potomac Economics September 16, 2008.
Evaluating the Benefits of the SPP EHV Buildout Moving forward on policy for funding 765 KV Larry Holloway CAWG Meeting February 25, 2009.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
Northwest Quadrant Joint Security Study Southern Company Headquarters Birmingham, Alabama August 12, 2002 Presented by Saeed Arabi.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting September 16 th, 2008 Austin, TX.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
System Strength Discussion
Small Signal Stability Analysis Study: study prepared by Powertech Labs Inc. for ERCOT Vance Beauregard AEP 9 April 2002.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Charles Hosken, General Manager Imperial Irrigation District
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Bulk Power Transmission System
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Local Area Study Local Area Study Mitigation Plan Update and Uncertainty Scenarios
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
1.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
1 Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee January 24, 2011.
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting June 20 th, 2008 Austin, TX.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT – MISO DC Tie Study Comments
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
1 ECONOMIC TRANSMISSION PLANNING Wholesale Market Subcommittee March 22, 2006 CMWG Proposal #1.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Wind Management at MISO
Status Update for Reliability/Market Power Mitigation Assessment
Entergy Integration Study Update
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Status Update for Reliability/Market Power Mitigation Assessment
ISO New England System R&D Needs
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Strategic Plan and Economic Upgrade Process
Presentation transcript:

SPP.org 1

Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX

SPP.org 3 Activities Completed Since Last Meeting Reliability Assessment  Finalize results for SPP QPR option  Tie back Study for ERCOT QPR option  Stability Analysis for SPP QPR option Economic Assessment  Economic projects identified  Cost/Benefit Analysis for Status Quo and Integrated case

SPP.org 4 Transmission Upgrades: Reliability Upgrades and Economic Upgrades

SPP.org 5 Reliability Study Cases Contingency analysis (N-1) for SPP- ETI system  More stringent reliability criteria in Western Region (N-1, G-1)  Monitored 69 kV and above Several potential thermal and voltage violations found SPP examined a set of reliability upgrades to mitigate these violations  Substation work at Orange County  Reconductor eight 138 kV lines in ETI area  Reconductor five 69 kV lines in ETI area High level planning estimate of projects required to meet SPP Criteria is $105 M COTTONWOOD IN EASTERN INTERCONNECTION Projects to meet SPP Criteria  New Orange County Substation work ($50 M)  138 kV and 69 kV Upgrades ($55 M) Planned Known Projects  ETI Proposed Projects for 2012  Local Reliability projects for Western Region  Transmission Reliability projects from the 2007 approved STEP Plan  ETI Transmission Construction Plan

SPP.org 6 Tie Back Study Objective of this study to evaluate reliability of SPP system under ERCOT QPR option Most of the tie-lines across LA-TX removed and loop backed DC ties at two locations considered  Hartburg (830 MW and 250 MW)  Quarry, Near Crockett (150 MW and 50 MW)

SPP.org 7 Potential ETI-ERCOT Disconnection Points Quarry Newton Bulk Leach Hartburg Sabine To Big Three, Hollywood, Toomey Orange Bon Wier DETAIL 1 DETAIL 2

SPP.org 8 DETAIL 1

SPP.org 9 DETAIL 2

SPP.org 10 ETEC System Disconnection Points X Pineland- Bronson

SPP.org 11 Tie Back Study : Study Results SPP Area were examined based on N-1 contingency analysis using SPP Criteria Four Key Transmission Projects were identified by SPP staff to meet the SPP reliability criteria for ERCOT QPR option  Upgrade Broken Bow – Bethel 138kV line  Upgrade Fisher Transformer (138/115kV)  Upgrade Toledo Bend – Hemphill 138kV Line  Acadiana Projects

SPP.org 12 Estimated Cost for SPP Members under ERCOT QPR option Direction is from ETI to SPP Hartburg DC Tie (830 MW)(250 MW) Quarry DC Tie 150 MW $25 Million$31 Million 50 MW $25 Million$61 Million

SPP.org 13 Stability Assessment Objective of this study is to evaluate stability of ETI under SPP QPR and ERCOT QPR options A consultant (Powertech) is performing this study Transient and Voltage Stability analyses being performed using Entergy and SPP Stability Criteria ETI system will be tested under various fault scenarios and transfers into ETI using projects identified for SPP QPR option

SPP.org 14 Stability Assessment : Cont. Stability study models are prepared jointly by SPP and ETI staff and sent to Powertech Simulated critical N-1, G-1, and N-G-1 contingencies in ETI first-tier areas (both electrical and geographical areas in SPP and rest of Entergy) Preliminary results indicated no significant issues in ETI system  Results indicate that RMR Requirements can be reduced The final results are expected in first quarter of 2009

SPP.org 15 Economic Upgrades Two Projects included as Economic Upgrades  Mt. Olive to Hartsburg series capacitor ($10 M)  Increased rating to 1,450 MW thus reducing significant constrained hours  Weber-Richard 500 kV line ($229 M)  Helped reduced congestion in Cottonwood area and RMR need in Sabine area along with other reliability upgrades

SPP.org 16 Cost allocation of ETI Reliability projects Reliability projects are required solely to integrate ETI into SPP SPP policy is to allocate these costs to the local zone  Similar to current discussion with Nebraska entities  Consistent with treatment with Pre Base Plan funding ETI Benefits compared to full cost of Reliability Projects ($105 M)

SPP.org 17 Cost allocation of ETI Economic Projects ETI Benefits compared to full cost of Economic Projects ($239 M) Economic Upgrades may be fully or partially funded by SPP pursuant to their Tariff provisions (i.e. Balanced Portfolio)

SPP.org 18 Economic Assessment

SPP.org 19 Key Market Assumptions – Status Quo Model SPP Market Assumptions  SPP modeled as Day 2 Market planned by SPP Cost Benefit Task Force  System wide unit commitment  System wide treatment of spinning reserve requirements  Security Constrained Unit Commitment and Economic Dispatch  SPP operates as a Single Balancing Authority Entergy (including ETI) Operating Assumptions  System wide unit commitment  Security Constrained Economic Dispatch  Reserve Requirements set and met on Entergy System wide basis  ETI RMR Requirement consistent with historical operation to address local voltage constraints  ETI and Entergy generation output consistent with historical operations Hurdle rates between SPP / other Regions and Entergy / other Regions  Dispatch hurdle 7 $/MWh (Entergy/SPP hurdle rate $14/MWh)  Commitment hurdle 25 $/MWh  Consistent with SPP Future Market Design Study assumptions

SPP.org 20 Key Market Assumptions – ETI/SPP Integrated Model SPP Market Assumptions same as Status Quo model ETI is a Member of SPP ETI RMR Requirements are reduced due to Reliability and Economic Transmission upgrades  Consistent with preliminary stability analysis results  Thermal constraints continue to be identified via Security Constrained Economic Dispatch (transmission system now includes all Reliability Projects and Economic Projects) Hurdle rates same as Status Quo except no hurdle rate between SPP and ETI

SPP.org 21 Benefit Metric – ETI Adjusted Production Cost Same Benefit metric being used by the SPP Cost Benefit Task Force in the Future Market Design Study Adjusted Production Cost for ETI  Generation Total Variable Cost  + Purchase Cost at ETI Load-Hub Rate  – Sales Revenue at ETI Generation-Hub Rate

SPP.org 22 ETI Benefits

SPP.org Benefits to ETI

SPP.org 24 Discussion of Findings - ETI Cottonwood in Eastern Interconnection (EIC)  ETI Generation Cost reduced by $404 M, purchase costs increased by $237 M and sales revenue was reduced by $64 M, resulting in an overall benefit of $103 M.  Based on an 18% carrying charge rate for Transmission Investment, this $103 M would support about $570 M in transmission investment  Proposed total cost of Reliability and Economic Upgrades is about $344 M  Benefit to Cost Ratio is 1.63  Includes $5 M in ROA implementation cost Cottonwood in ERCOT  Benefits reduced due to loss of Cottonwood generation  $90 M in benefits would support about $500 M in Transmission Investment  Benefit to Cost Ratio drops slightly to 1.43  Includes $5M in ROA implementation costs

SPP.org 25 ETI Benefits Sensitivity – NO RMR Requirements

SPP.org Benefits to ETI if RMR Requirement Removed

SPP.org 27 Discussion of Findings – No RMR Requirement Benefits increase to $163 M, creating an incremental benefit of about $60 M This $60 M in incremental benefits would support about $333 M in potential projects  Based on 18% carrying charge rate on transmission investment  Potential for future Economic Upgrade  There is no guarantee that this level of investment would be sufficient to relieve the remaining RMR requirements

SPP.org 28 Questions?

SPP.org 29 Detail Slides

SPP.org ETI Benefits Breakdown

SPP.org ETI Benefits Breakdown

SPP.org 32 Mak Nagle Manager, Technical Studies & Modeling (501) Wayne Camp Accenture