Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalence Calculation Under Inflation.

Slides:



Advertisements
Similar presentations
Lecture No. 36 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Advertisements

1 Project Cash Flow Analysis Lecture No. 27 Professor C. S. Park Fundamentals of Engineering Economics Copyright © 2005.
Contemporary Engineering Economics, 4 th edition, © 2007 Effects of Inflation on Project Cash Flows Lecture No. 45 Chapter 11 Contemporary Engineering.
Contemporary Engineering Economics, 4 th edition, © 2007 Equivalence Calculation under Inflation Lecture No. 44 Chapter 11 Contemporary Engineering Economics.
IEN255 Chapter 11 - Inflation
Contemporry Engineering Economics, 4 th edition, © 2007 Equivalence Calculations with Continuous Payments Lecture No.12 Chapter 4 Contemporary Engineering.
CHAPTER 8 PRICE CHANGES and ECHANGE RATES. Definitions Inflation –An increase in the average price paid for goods and services bringing about a reduction.
Contemporary Engineering Economics, 4 th edition, © 2007 When Projects Require Financing Activities Lecture No. 41 Chapter 10 Contemporary Engineering.
Economic Equivalence Lecture No.3 Professor C. S. Park
Contemporary Engineering Economics, 4 th edition © 2007 Economic Equivalence Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2006.
Contemporary Engineering Economics, 4 th edition, © 2007 Meaning and Measure of Inflation Lecture No. 43 Chapter 11 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, ©2007 Interest Formulas for Single Cash Flows Lecture No.6 Chapter 3 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Process of Developing Project Cash Flows Lecture No.38 Chapter 10 Contemporary Engineering Economics.
Contemporary Engineering Economics, 4 th edition, © 2007 Unconventional Equivalence Calculations Lecture No. 9 Chapter 3 Contemporary Engineering Economics.
(c) 2001 Contemporary Engineering Economics 1 Chapter 13 Inflation and Its Impact on Project Cash Flows Meaning and Measure of Inflation Equivalence Calculations.
Engineering Economics in Canada Chapter 9 Inflation.
(c) 2001 Contemporary Engineering Economics 1 Chapter 13 Inflation and Its Impact on Project Cash Flows Meaning and Measure of Inflation Equivalence Calculations.
Lecture slides to accompany
Lecture No. 35 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Advanced Engineering Economy Contemporary Engineering Economics, 5th edition, © 2010.
L13: Equivalence Calculations under Inflation
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh Contact info:
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
Contemporary Engineering Economics
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalence Calculations with Effective.
Effects of Inflation Inflation – the increase in the amount of money necessary to obtain the same amount of product or service before the inflated prices.
Lecture No. 37 Chapter 11 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
14-1 Lecture slides to accompany Engineering Economy 7 th edition Leland Blank Anthony Tarquin Chapter 14 Effects of Inflation © 2012 by McGraw-Hill All.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Nominal and Effective Interest Rates.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Meaning and Measure of Inflation.
Copyright ©2015 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Sixteenth Edition By William.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Effects of Inflation on Project Cash.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Process of Developing Project Cash.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 1-1 Developed.
Chapter 12 Inflation Effects.
Lecture No.5 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5 th edition © 2010.
Effects of Inflation Inflation – the increase in the amount of money necessary to obtain the same amount of product or service before the inflated prices.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
Irregular Payment Series and Unconventional Equivalence Calculations
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Discounted Cash Flow Analysis Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Applying Annual Worth Analysis Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas (Gradient Series)
Lecture No. 9 Chapter 3 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
Interest Formulas for Single Cash Flows
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Blank & Tarquin: 5 th edition. Ch.14 Authored by Dr. Don Smith,
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Interest Formulas – Equal Payment.
Corporate Income Taxes
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Engineering Economic Decisions Lecture.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Economic Equivalence Lecture No.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Estimating Profit from Production.
Example 1: Because of general price inflation in the economy, the purchasing power of the Turkish Lira shrinks with the passage of time. If the general.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
1 Chapter 4 Equivalence Calculations Under Inflation.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Comparing Mutually Exclusive Alternatives.
Effects of Inflation on Project Cash Flows
Equivalence Calculation under Inflation
Inflation and Its Effects on Project Cash Flows
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Unconventional Equivalence Calculations
Contemporary Engineering Economics
Economic Equivalence Lecture No.5 Chapter 3
Chapter 11 Inflation and Its Impact on Project Cash Flows
Lecture slides to accompany
Meaning and Measure of Inflation
EXAMPLE 8-1 Real-Dollar Purchasing Power of Your Salary
Project Cash Flow Analysis
Contemporary Engineering Economics, 6e, GE Park Copyright © 2016, Pearson Education, Ltd. All Rights Reserved Meaning and Measure of Inflation Lecture.
Chapter 4 Measure of Inflation
Presentation transcript:

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalence Calculation Under Inflation Lecture No. 36 Chapter 11 Contemporary Engineering Economics Copyright © 2016

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Inflation Terminology III o Inflation-free interest rate (i’): an estimate of the true earning power of money when the inflation effects have been removed (also known as real interest rate). o Market interest rate (i): an interest rate which takes into account the combined effects of the earning value of capital and any anticipated changes in purchasing power (also known as inflation-adjusted interest rate).

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Inflation and Cash Flow Analysis  Constant dollar analysis o Estimate all future cash flows in constant dollars. o Use i’ as an interest rate to find the equivalent worth.  Actual dollar analysis o Estimate all future cash flows in actual dollars. o Use i as an interest rate to find the equivalent worth.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalence Calculations Under Inflation Types of Analysis Method Constant-Dollar AnalysisActual-Dollar Analysis Types of Cash Flows Estimated in Constant DollarsEstimated in Actual Dollars Types of Interest Rate Market Interest Rate (i)Inflation-free Interest Rate (i’)

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved When to Use Constant Dollar Analysis? o In the absence of inflation, all economic analysis up to this point is, in fact, the constant dollar analysis. o Constant dollar analysis is common in the evaluation of many long-term public projects, because governments do not pay income taxes. o For private sector, income taxes are levied based on the taxable income in actual dollars, so the actual dollar analysis is more common.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Actual Dollars Analysis Method 1: Deflation Method o Step 1: Bring all cash flows to have common purchasing power. o Step 2: Consider the earning power. Method 2: Adjusted-discount Method o Combine Steps 1 and 2 into one step.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 11.6: Deflation Method Step 1: Converting actual dollars into constant dollars Step 2: Calculating equivalent present worth

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Graphical Overview on Deflation Method -$75,000$30,476 $32,381 $28,334$23,858 $45,455 -$75,000 $32,000 $35,700 $32,800 $29,000 $58,000 -$75,000 $27,706 $26,761 $21,288 $16,295 $28,218 $45,268 Actual Dollars Constant Dollars Present Worth n = 0 n = 1n = 2n = 3n = 4n = 5

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Adjusted-Discount Method Step 1 Step 2 o Discrete compounding o Continuous compounding

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Example 11.7: Adjusted- Discounted Method Given: inflation-free interest rate = 0.10, general inflation rate = 5%, and cash flows in actual dollars Find: i and NPW

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Graphical Overview on Adjusted Discount Method n = 0 n = 1n = 2n = 3n = 4n = 5 -$75,000 $32,000 $35,700 $32,800 $29,000 $58,000 Actual Dollars -$75,000 $27,706 $26,761 $21,288 $16,295 $28,218 $45,268 Present Worth

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Mixed-Dollar Analysis Age (Current Age = 5 Years Old) Estimated College Expenses in Today’s Dollars College Expenses Converted into Equivalent Actual Dollars 18 (Freshman)$30,000$30,000(F/P,6%,13) = $63, (Sophomore)30,00030,000(F/P,6%,14) = 67, (Junior)30,00030,000(F/P,6%,15) = 71, (senior)30,00030,000(F/P,6%,16) = 76,211  College Savings Plan: Determine the required quarterly contribution  Approach: Convert any cash flow elements in constant dollars into actual dollars. Then use the market interest rate to find the equivalent present value. Assume f = 6% and i = 8% compounded quarterly.

Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Required Quarterly Contributions to College Funds V 1 = C(F/A, 2%, 48) V 2 = $229,211 Let V 1 = V 2 and solve for C: C = $2,888.48