RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.

Slides:



Advertisements
Similar presentations
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
Advertisements

S Y S T E M S E N G I N E E R I N G.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
Define & Compare Flowcharts of Each Method Tom Delong.
1 Chapter 2: Product Development Process and Organization Introduction Importance of human resources: Most companies have similar technology resources.
Environmental Risk Management Teaching material and methods Yiannis Xenidis, Lecturer Department of Civil Engineering Faculty of Engineering, Aristotle.
Scandpower AS P.O. Box 3, N-2027 Kjeller, Norway Risk management in the Scandinavian railway industry Karl Ove Ingebrigtsen Vice president Sweden Norway.
Combining Product Risk Management & Design Controls
Reliability Risk Assessment
1 Solution proposal Exam 19. Mai 2000 No help tools allowed.
“ Hard work and concern for the society is the key to success ” - O P Jindal On-site and Off-site Emergency Plans Based on Integral Risk Management – Key.
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
1 Risk evaluation Risk treatment. 2 Risk Management Process Risk Management Process.
Trade Study Training Need and Goals Need Consistent methodologies and practices performing trade studies Pros/cons, advantages/disadvantages, customer/management.
CSC 402, Fall Requirements Analysis for Special Properties Systems Engineering (def?) –why? increasing complexity –ICBM’s (then TMI, Therac, Challenger...)
Title slide PIPELINE QRA SEMINAR. PIPELINE RISK ASSESSMENT INTRODUCTION TO RISK IDENTIFICATION 2.
Tony Gould Quality Risk Management. 2 | PQ Workshop, Abu Dhabi | October 2010 Introduction Risk management is not new – we do it informally all the time.
Hazard Analysis and Critical Control Points
Hazards Analysis & Risks Assessment By Sebastien A. Daleyden Vincent M. Goussen.
Annex I: Methods & Tools prepared by some members of the ICH Q9 EWG for example only; not an official policy/guidance July 2006, slide 1 ICH Q9 QUALITY.
West Virginia University A Bayesian Approach to Reliability Predication of Component Based Systems H. Singh, V. Cortellessa, B. Cukic, E. Gunel, V. Bharadwaj.
Quality Risk Management ICH Q9 Annex I: Methods & Tools
Automation for System Safety Analysis: Executive Briefing Jane T. Malin, Principal Investigator Project: Automated Tool and Method for System Safety Analysis.
CARLOS CEDEÑO DSES /04/2008 Reliability of the Three Main Engines of Space Shuttle.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 24 Slide 1 Critical Systems Validation 1.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Introduction to ISO New and modified requirements.
OSMA2003 Center for Reliability Engineering 1 Integrating Software into PRA Presented by C. Smidts Center for Reliability Engineering University of Maryland.
VTT-STUK assessment method for safety evaluation of safety-critical computer based systems - application in BE-SECBS project.
Guidance Notes on the Investigation of Marine Incidents
WHAT IS SYSTEM SAFETY? The field of safety analysis in which systems are evaluated using a number of different techniques to improve safety. There are.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
FAULT TREE ANALYSIS (FTA). QUANTITATIVE RISK ANALYSIS Some of the commonly used quantitative risk assessment methods are; 1.Fault tree analysis (FTA)
Slide 1V&V 10/2002 Software Quality Assurance Dr. Linda H. Rosenberg Assistant Director For Information Sciences Goddard Space Flight Center, NASA
2013 NWHA CONFERENCE FERC’S RISK-INFORMED DECISION MAKING Doug Johnson – Regional Engineer - Portland From PFMA to Risk Assessment.
Assessment of Alternate Methodologies for Establishing Equivalent Satisfaction of the Ec Criterion for Launch Licensing Terry Hardy AST-300/Systems Engineering.
9 th Workshop on European Collaboration for Higher Education and Research in Nuclear Engineering & Radiological Protection Salamanca, Spain 5-7 June 2013.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
Risk Management Handbook by H Global Managing Project - Group H Samuel SuarezMark McCann Ankit TanejaNazmul Alam LaurenceHsuTony Huang Farid MojahediEddie.
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
Safety Critical Systems 5 Testing T Safety Critical Systems.
1 Improving the Risk Management Capability of the Reliability and Maintainability Program An introduction to the philosophy behind the AIAA S-102 Performance-Based.
SOFTWARE PROJECT MANAGEMENT
Over View of CENELC Standards for Signalling Applications
Ensure that the right functions are performed Ensure that the these functions are performed right and are reliable.
Requirements Engineering-Based Conceptual Modelling From: Requirements Engineering E. Insfran, O. Pastor and R. Wieringa Presented by Chin-Yi Tsai.
Machine Design Under Uncertainty. Outline Uncertainty in mechanical components Why consider uncertainty Basics of uncertainty Uncertainty analysis for.
Center for Reliability Engineering Integrating Software into PRA B. Li, M. Li, A. Sinha, Y. Wei, C. Smidts Presented by Bin Li Center for Reliability Engineering.
Introduction to Project Management Chapter 9 Managing Project Risk
Safety Assessment: Safety Integrity Levels
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Fault Tree Analysis for the BLEDP Student meeting Vegard Joa Moseng.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Failure Modes, Effects and Criticality Analysis
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Camera PDR/CD1 Planning 19 September 2008
Maintenance strategies
PRA: Validation versus Participation in Risk Analysis PRA as a Risk Informed Decision Making Tool Richard T. Banke– SAIC
OH&S Plant Obligations make
Security SIG in MTS 05th November 2013 DEG/MTS RISK-BASED SECURITY TESTING Fraunhofer FOKUS.
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Uncontrolled variation is the enemy of quality
Quality Risk Management
Level - 3 Process Areas (CMMI-DEV)
HSE Case: Risk Based Approach.
CPM, PERT & Schedule Risk Analysis in Construction
PMI North Area PMP Exam Study Group
Transmitted by the expert from ISO
Hazards Analysis & Risks Assessment
A New Concept for Laboratory Quality Management Systems
Presentation transcript:

RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004

2 Introduction What are reliability analyses? Why are reliability analyses important? Why develop guidelines? How are reliability analyses used? Acceptable reliability analysis methods. Typical documentation.

3 What Are Reliability Analyses? Reliability analyses are quantitative and qualitative tools used to determine whether an item will perform its intended function for a specified interval under foreseeable operating conditions. Reliability is not safety –Components may be reliable and still unsafe –Accidents arise from interactions between machines, software, humans, and the environment, as well as from component failure Reliability must be considered in the context of system safety.

4 Why Are Reliability Analyses Important? Reliability analyses are important because: Risk to the public can depend on reliability of safety- critical systems and consequences of failures of those systems. Reliability analyses can provide risk assessment data to support launch vehicle safety analyses. Reliability analyses help make decisions leading to improved reliability and safety.

5 Why Develop Guidelines? AST is developing Reliability Analyses Guidelines to: Facilitate valid RLV reliability analyses by providing a set of acceptable methods that demonstrate compliance with regulatory requirements. Provide examples of methods and approaches to assist RLV developers. Capture best practices in the aerospace community. Illustrate integration of safety and reliability analyses.

6 How Are Reliability Analyses Used? Reliability analyses can be used to: –Support the system safety process: Identify potential reliability/safety problems Compare alternate designs to improve reliability/safety Identify operational/test requirements Provide validation and verification data –Provide vehicle failure probability estimates to support E c analysis. –Help specify operating restrictions. –Evaluate whether a flight safety system will meet reliability or safety requirements. Guidelines will document how reliability analyses are applied

7 Acceptable Reliability Analysis Methods Reliability Block Diagrams Parts Count Analysis Failure Modes, Effects, and Criticality Analysis Fault Tree Analysis Event Tree Analysis Reliability Allocation Probabilistic Risk Assessment Monte Carlo Simulation Guidelines will describe each of these methods, including approach, advantages, disadvantages, and RLV-specific examples

8 Typical Documentation Reliability analysis documentation typically includes: Item identification Intended use of the analysis results Analysis methods used Analysis inputs Analysis results Confidence in analysis (assumptions, sources of uncertainty, limitations) Guidelines will provide a description of each documentation element

9 Summary AST is developing RLV Reliability Analysis Guidelines to facilitate valid reliability analysis. Guidelines will include how reliability analyses are used, acceptable methods, and RLV-specific examples. Draft guidelines posted for comment: April 2005