Lessons Learned from Integrity Management Inspections Byron Coy – OPS Eastern Region Derick Turner – OPS Southern Region May 17, 2005.

Slides:



Advertisements
Similar presentations
Radiopharmaceutical Production
Advertisements

Internal Control–Integrated Framework
[Organisation’s Title] Environmental Management System
ISO 9001:2000 Documentation Requirements
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Software Quality Assurance Plan
EPA EMS General Awareness Training Presented by David Guest, Esq. U.S. EPA Washington, D.C.
More CMM Part Two : Details.
Integrity Management Program Special Permits (IMP-SP) Draft Administrative Plan 12/5/2007.
Overview of Key Rule Features
IS Audit Function Knowledge
Purpose of the Standards
CORPORATE RISK MANAGEMENT & INSURANCE BY R P BLAH D.G.M. INCHARGE THE ORIENTAL INSURANCE COMPANY LIMITED REGIONAL OFFICE BHUBANESWAR.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
© 2008 Prentice Hall11-1 Introduction to Project Management Chapter 11 Managing Project Execution Information Systems Project Management: A Process and.
Project Execution.
Internal Auditing and Outsourcing
S/W Project Management
SCC DA Program Stress-corrosion-cracking direct assessment (SCCDA) is a structured process that contributes to pipeline company’s efforts to improve.
Integrity Management Inspection Process Don Moore, OPS Central Region.
Auditing Internal Control over Financial Reporting
Auditing Internal Control over Financial Reporting
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Current Inspection Process for Operators of Hazardous Liquids Pipelines Rod Seeley OPS SW Region Director May 18, 2005.
RAILROAD COMMISSION OF TEXAS Stephanie Weidman Austin Regional Manager Oversight and Safety Division Pipeline Safety September 2015.
TEN-T Experts Briefing, March Annual Call Award Criteria.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
ISO 9001:2008 to ISO 9001:2015 Summary of Changes
Office of Pipeline Safety Integrity Management Inspection Process Louisiana Pipeline Safety Seminar August 2003.
Chapter 7 Auditing Internal Control over Financial Reporting McGraw-Hill/IrwinCopyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
ISO NON-CONFORMANCE, CORRECTIVE AND PREVENTIVE ACTION.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
QUALITY MANAGEMENT STATEMENT
HCAs & Pipeline Assessment Intervals Is There a Need for Change? Richard B. Kuprewicz President, Accufacts Inc. For Pipeline Safety Trust New Orleans Conference.
McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 6-1 Chapter 6 CHAPTER 6 INTERNAL CONTROL IN A FINANCIAL STATEMENT AUDIT.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 6-1 Chapter Six Internal Control in a Financial Statement Audit.
Ensuring Success in Integrity Management Marty Matheson American Petroleum Institute July 24, 2002.
Analysis & Presentation of Integrity Management Audit Results Western Regional Gas Conference August 21, 2007 Gary R. White.
A Framework for Your Pipeline Integrity Program. 2 A Few Thoughts Before Beginning l This rule is new to the pipeline industry although many of the concepts.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
Research Needs on SCC of Pipelines Raymond R. Fessler Stress-Corrosion Cracking (SCC) Workshop DOT/RSPA Houston, TX December 2, 2003.
A Guide for Management. Overview Benefits of entity-level controls Nature of entity-level controls Types of entity-level controls, control objectives,
Project management Topic 7 Controls. What is a control? Decision making activities – Planning – Monitor progress – Compare achievement with plan – Detect.
International Security Management Standards. BS ISO/IEC 17799:2005 BS ISO/IEC 27001:2005 First edition – ISO/IEC 17799:2000 Second edition ISO/IEC 17799:2005.
2015 Pipeline Safety Trust Conference November 20 th, 2015 | New Orleans, LA API RP 1175 Pipeline Leak Detection Program Management – New RP Highlights.
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Auditing Internal Control over Financial Reporting Chapter Seven.
ISO Registration Common Areas of Nonconformances.
The common structure and ISO 9001:2015 additions
© Michael Crosby and Charles Sacker, 2001 Systematic Software Reviews Software reviews are a “quality improvement process for written material”.
OPS Observations, Expectations, and Concerns Zach Barrett (OPS) Direct Assessment Workshop November 4, 2003.
Distribution Integrity Management Program
Continual Service Improvement Methods & Techniques.
Enforcement of Integrity Management Rule Workshop on the Integrity Management Rule for Large Liquid Pipelines Chris Hoidal, Director OPS Western Region.
Office of Pipeline Safety Remedial Action Review Protocol Integrity Management Workshop July 23-24, 2002.
18-1 Copyright © 2016 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill Education.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Governance, risk and ethics. 2 Section A: Governance and responsibility Section B: Internal control and review Section C: Identifying and assessing risk.
Integrity Management Continuous Improvement Project Status and Implementation Process Presentation for: PHMSA Advisory Committees July 11, 2012.
1 Auditing Your Fusion Center Privacy Policy. 22 Recommendations to the program resulting in improvements Updates to privacy documentation Informal discussions.
McGraw-Hill/Irwin © The McGraw-Hill Companies 2010 Internal Control in a Financial Statement Audit Chapter Six.
Internal Control in a Financial Statement Audit
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Utility Technologies International
Distribution Integrity
Radiopharmaceutical Production
Presentation transcript:

Lessons Learned from Integrity Management Inspections Byron Coy – OPS Eastern Region Derick Turner – OPS Southern Region May 17, 2005

Summary of Experience to Date Operators generally understand and are implementing the assessment provisions of the rule Operators generally understand and are implementing the assessment provisions of the rule Operators are generally able to meet repair deadlines Operators are generally able to meet repair deadlines

Progress is needed in development of some IM Program Elements, but this is expected Progress is needed in development of some IM Program Elements, but this is expected Improved performance results from senior management support and a commitment to continuous improvement Improved performance results from senior management support and a commitment to continuous improvement Summary of Experience to Date

OPS successfully implemented a programmatic inspection approach (vs. “yes/no” checklist) OPS successfully implemented a programmatic inspection approach (vs. “yes/no” checklist)  Measures to achieve consistency in identifying issues have been effective OPS Perspective on Inspection Process

Protocol application can be tailored to: Protocol application can be tailored to:  Risk  Leak history  Extent of HCA exposure  Pipeline system complexity  IM process maturity and sophistication  Conservatism in assumptions and methods  Organization structure and complexity OPS Perspective on Inspection Process

Operator interactions have been generally cooperative with open communication Operator interactions have been generally cooperative with open communication  OPS provided operators with significant and well- received feedback on areas for improvement OPS Perspective on Inspection Process

Enforcement approach strives to promote operator program development and ongoing improvement Enforcement approach strives to promote operator program development and ongoing improvement Inspection approach continues to improve Inspection approach continues to improve OPS Perspective on Inspection Process

Initial inspections may involve significant “education” for some operators of small systems Initial inspections may involve significant “education” for some operators of small systems Operators of small systems may be more likely to contract out significant portions of IM program development Operators of small systems may be more likely to contract out significant portions of IM program development Operator is still ultimately responsible Operator is still ultimately responsible General Inspection Observations

Program quality correlates better to corporate resources than pipeline mileage Program quality correlates better to corporate resources than pipeline mileage General Inspection Observations

Experience Everything from outlines to multi-volume documents Everything from outlines to multi-volume documents Evidence of compliance for completion sometimes missing Evidence of compliance for completion sometimes missingExpectations IM Plan Organization

Experience Everything from outlines to multi- volume documents Everything from outlines to multi- volume documents Evidence of compliance for completion sometimes missing Evidence of compliance for completion sometimes missing Expectations Do not regurgitate the rule Do not regurgitate the rule Not all processes have to be fully documented within the IMP – can be referenced Not all processes have to be fully documented within the IMP – can be referenced Process should support the implementation of a more consistent and thorough approach Process should support the implementation of a more consistent and thorough approach IM Plan Organization

Experience Buffer zones of several sizes Buffer zones of several sizes Some weak technical justifications Some weak technical justifications Overland spill transport models Overland spill transport models Simplifying assumptions for water transport Simplifying assumptions for water transport Segment Identification Expectations

Experience Buffer zones of several sizes Buffer zones of several sizes Some weak technical justifications Some weak technical justifications Overland spill transport models Overland spill transport models Simplifying assumptions for water transport Simplifying assumptions for water transport Segment Identification Expectations Technical justification is important Technical justification is important Elaborate approaches are not always necessary Elaborate approaches are not always necessary Use of field knowledge to capture all HCAs Use of field knowledge to capture all HCAs May not need major re- review May not need major re- review

Experience Most Plans satisfactory, but some did not include basic requirements – e.g., dates, assessment method, justification Most Plans satisfactory, but some did not include basic requirements – e.g., dates, assessment method, justification For ILI, Plans are structured around piggable sections – correlation with “could affect” segments sometimes difficult For ILI, Plans are structured around piggable sections – correlation with “could affect” segments sometimes difficultExpectations Baseline Assessment Plan

Experience Most Plans satisfactory, but some did not include basic requirements – e.g., dates, assessment method, justification Most Plans satisfactory, but some did not include basic requirements – e.g., dates, assessment method, justification For ILI, Plans are structured around piggable sections – correlation with “could affect” segments sometimes difficult For ILI, Plans are structured around piggable sections – correlation with “could affect” segments sometimes difficultExpectations Spreadsheet or table can suffice as the plan Spreadsheet or table can suffice as the plan 50% and 100% mileage requirements must be satisfied 50% and 100% mileage requirements must be satisfied Prioritization method can match complexity and risk of system used to establish a schedule Prioritization method can match complexity and risk of system used to establish a schedule Baseline Assessment Plan

Experience Broad spectrum of approaches – GIS- based analytical tools to nothing at all Broad spectrum of approaches – GIS- based analytical tools to nothing at all Data integration varies from computer based to informal process to none Data integration varies from computer based to informal process to noneExpectations Integrity Assessment Results Review

Experience Broad spectrum of approaches – GIS- based analytical tools to nothing at all Broad spectrum of approaches – GIS- based analytical tools to nothing at all Data integration varies from computer based to informal process to none Data integration varies from computer based to informal process to noneExpectations Thorough review of vendor ILI reports by operator personnel Thorough review of vendor ILI reports by operator personnel Involve the experience/ expertise in the company Involve the experience/ expertise in the company Integration with non-ILI data Integration with non-ILI data Document cause of hydrotest failures Document cause of hydrotest failures Integrity Assessment Results Review

Experience Timely vendor reporting can be a problem Timely vendor reporting can be a problem Some lengthy times between deformation and metal loss tools Some lengthy times between deformation and metal loss tools Operators build in time to confirm defects are “real” (e.g., not previously repaired) Operators build in time to confirm defects are “real” (e.g., not previously repaired)Expectations “Discovery”

Experience Timely vendor reporting can be a problem Timely vendor reporting can be a problem Some lengthy times between deformation and metal loss tools Some lengthy times between deformation and metal loss tools Operators build in time to confirm defects are “real” (e.g., not previously repaired) Operators build in time to confirm defects are “real” (e.g., not previously repaired)Expectations Expect operators to promptly reduce pressure for immediate repair conditions Expect operators to promptly reduce pressure for immediate repair conditions Act on data from single tool if sufficient for discovery and 2 nd tool delayed Act on data from single tool if sufficient for discovery and 2 nd tool delayed Document why discovery extends beyond 180 days after assessment Document why discovery extends beyond 180 days after assessment “Discovery”

Experience Operators understand and are trying to meet repair deadlines Operators understand and are trying to meet repair deadlines Rule’s repair provisions not always in O&M procedures Rule’s repair provisions not always in O&M procedures Some notifications when schedule can not be met and pressure not reduced Some notifications when schedule can not be met and pressure not reducedExpectations Repair and Remediation

Experience Operators understand and are trying to meet repair deadlines Operators understand and are trying to meet repair deadlines Rule’s repair provisions not always in O&M procedures Rule’s repair provisions not always in O&M procedures Some notifications when schedule can not be met and pressure not reduced Some notifications when schedule can not be met and pressure not reduced Expectations Records should clearly show assessment, discovery, and repair dates Records should clearly show assessment, discovery, and repair dates Feedback to ILI analyst of actual excavated defect conditions and repair information Feedback to ILI analyst of actual excavated defect conditions and repair information Repair and Remediation

Experience Complicated mathematical models to SME approaches Complicated mathematical models to SME approaches Simple approaches for prioritizing segments; more detailed methods for looking at segment-specific threats Simple approaches for prioritizing segments; more detailed methods for looking at segment-specific threats Justification for assumptions lacking Justification for assumptions lackingExpectations Information/Risk Analysis

Experience Complicated mathematical models to SME approaches Complicated mathematical models to SME approaches Simple approaches for prioritizing segments; more detailed methods for looking at segment-specific threats Simple approaches for prioritizing segments; more detailed methods for looking at segment-specific threats Justification for assumptions lacking Justification for assumptions lackingExpectations Systematic process Systematic process Comprehensive consideration of threats Comprehensive consideration of threats Inclusion of facilities Inclusion of facilities Involvement of all relevant operator expertise/experience Involvement of all relevant operator expertise/experience Investigative approach Investigative approach Information/Risk Analysis

Experience Few operators had mature process for this element Few operators had mature process for this element Processes often not well developed or documented Processes often not well developed or documented Have seen few leak detection and EFRD evaluations Have seen few leak detection and EFRD evaluationsExpectations Preventive & Mitigative Measures

Experience Few operators had mature process for this element Few operators had mature process for this element Processes often not well developed or documented Processes often not well developed or documented Have seen few leak detection and EFRD evaluations Have seen few leak detection and EFRD evaluationsExpectations Consideration of potential preventive and mitigative actions – not assumption that existing programs are enough Consideration of potential preventive and mitigative actions – not assumption that existing programs are enough Documented, risk-based justification Documented, risk-based justification Leak Detection / EFRD analysis to be in place Leak Detection / EFRD analysis to be in place Preventive & Mitigative Measures

Experience Few operators considered periodic evaluations Few operators considered periodic evaluations Tendency to default to a 5 year assessment interval Tendency to default to a 5 year assessment intervalExpectations Continual Evaluation and Assessment

Experience Few operators considered periodic evaluations Few operators considered periodic evaluations Tendency to default to a 5 year assessment interval Tendency to default to a 5 year assessment intervalExpectations Baseline Plan transitions into an on-going assessment plan Baseline Plan transitions into an on-going assessment plan For some lines assessment more frequently than 5 years is appropriate For some lines assessment more frequently than 5 years is appropriate Continual Evaluation and Assessment

Experience Wide variation in how continuing evaluation is approached Wide variation in how continuing evaluation is approached Some interval extension notifications received by OPS Some interval extension notifications received by OPSExpectations Continual Evaluation and Assessment

Experience Wide variation in how continuing evaluation is approached Wide variation in how continuing evaluation is approached Some interval extension notifications received by OPS Some interval extension notifications received by OPSExpectations Available techniques for corrosion growth modeling, fatigue crack growth models may be useful Available techniques for corrosion growth modeling, fatigue crack growth models may be useful Sound basis for treatment of seam integrity susceptibility, SCC Sound basis for treatment of seam integrity susceptibility, SCC Continual Evaluation and Assessment

Experience Little attention given to this element Little attention given to this element Performance measures have mostly been those in API-1160 – sometimes less Performance measures have mostly been those in API-1160 – sometimes less Some good approaches to root cause analysis Some good approaches to root cause analysisExpectations IM Program Effectiveness

Experience Little attention given to this element Little attention given to this element Performance measures have mostly been those in API-1160 – sometimes less Performance measures have mostly been those in API-1160 – sometimes less Some good approaches to root cause analysis Some good approaches to root cause analysisExpectations Process in place by which the operator reviews its program effectiveness (e.g., internal and external audits, management reviews) Process in place by which the operator reviews its program effectiveness (e.g., internal and external audits, management reviews) Management awareness and support Management awareness and support IM Program Effectiveness

Common IM Program Issues

Segment Identification Issues

RankIssue Description 1 Failure to require use of local knowledge, field personnel input, and other sources to update HCA information 2 Failure to adequately document the segment identification results, process and assumptions 3 Failure to adequately justify the buffer size used to identify segments or facilities that could affect HCAs 4 Failure to perform adequate water transport analysis where applicable 5Failure to adequately identify and locate HCAs Segment Identification Issues

Baseline Assessment Plan Issues

RankIssue Description 1 Failure to technically justify why pre-70 LF ERW or lap-welded pipe is not susceptible to seam integrity issues 2 Failure to document the reasons for changes to the BAP 3Failure to technically justify assessment method Baseline Assessment Plan Issues

RankIssue Description 4 Failure to develop a BAP schedule that reflects the relative risk of the HCA affecting segments 5 Failure to adequately specify assessment method(s) for all segments in the BAP 5 Use of an incomplete risk evaluation for BAP scheduling that does not consider each of the relevant risk factors required by the rule Baseline Assessment Plan Issues

Assessment Results Issues

RankIssue Description 1 Failure to develop a process to qualify personnel reviewing assessment results 2 Failure to require the integration of other pertinent data in a timely manner, when evaluating assessment results 3 Failure to specify adequate vendor specifications including tool tolerances and timeframes for ILI reports Assessment Results Issues

RankIssue Description 4 Failure to address the integrity assessment results review requirements in the IM plan or procedures 5 Failure to provide adequate assurance through calibration/verification digs, or other means, that tool data is valid and suitable for integrity-related analysis Assessment Results Issues

Remedial Action Issues

RankIssue Description 1 Failure to adequately document compliance with repair rule criteria 2 Failure to require compliance with the ASME B31.4 Section or document other acceptable pressure reduction methods when this code section is not applicable Remedial Action Issues

RankIssue Description 3 Failure to require implementation of time response requirements contained in the rule 4 Failure to require pressure reductions for immediate repairs 5Failure to require prioritization of anomalies for repair Remedial Action Issues

Information/Risk Analysis Issues

RankIssue Description 1 Failure to consider facilities (e.g., tanks) in risk analysis 2 Failure to develop a comprehensive risk analysis process or consider all required risk factors 3 Failure to require updates of the risk model for current conditions and environment 4 Failure to adequately document the risk analysis process 5 Failure to include explicit guidelines and process formality to support use of SME approach Information/Risk Analysis Issues

Preventive & Mitigative Issues

RankIssue Description 1 Failure to have a systematic, documented process to evaluate additional measures to protect HCAs 2Failure to have a documented EFRD needs analysis 3 Failure to document a leak detection evaluation process 4 Failure to require a documented justification for decisions regarding additional preventive and mitigative measures 5 Failure to consider risk analysis in making preventive and mitigative decisions Preventive & Mitigative Issues

Continual Assessment/Evaluation Issues

RankIssue Description 1 Failure to develop or document an adequate periodic evaluation process that meets rule requirements 2 Failure to consider all relevant information or develop adequate justification for reassessment intervals 3 Failure to consider all relevant information or provide an adequate explanation of re-assessment methods Continual Assessment/Evaluation Issues

RankIssue Description 4 Failure to develop or document a process for determining re-assessment intervals 5 Failure to specify appropriate intervals to periodically evaluate the pipeline risks 5 Failure to prohibit reassessment intervals that exceed five years without adequate technical justification or notification of OPS Continual Assessment/Evaluation Issues

Program Evaluation Issues

RankIssue Description 1 Failure to provide adequate detail in all or most areas of the IM Plan 2 Failure to develop adequate procedures for implementing the performance evaluation process 3 Failure to communicate the results of the Program Evaluation process to company personnel or third parties who need to make use of that information 4 Failure to specify document retention periods or distribution requirements in the IM Plan 5 Failure to require or perform root cause analyses of incidents that affect pipeline integrity Program Evaluation Issues

Three rule instances in which operators can notify Three rule instances in which operators can notify Use of “Other Technology” Use of “Other Technology” Inability to meet repair schedules or reduce pressure Inability to meet repair schedules or reduce pressure Interval longer than 5 years Interval longer than 5 years First notifications received in May 2002 First notifications received in May 2002 Notification Experience

Notifications by Type Notification Experience

Notifications by Pipeline Category 16 of the notifications for intrastate pipelines involved pipelines in Texas Notification Experience

Notifications by Disposition Notification Experience

Notifications by Operator A total of 26 operators have submitted notifications Notification Experience

More Information: Go to the Implementing Integrity Management (IIM) home page - Go to the Implementing Integrity Management (IIM) home page - Select Notifications/Notification Listing Select Notifications/Notification Listing Notification Experience