Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012.

Slides:



Advertisements
Similar presentations
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Advertisements

Interest Rate Swaps and Agreements Chapter 28. Swaps CBs and IBs are major participants  dealers  traders  users regulatory concerns regarding credit.
Concerns with RUC Capacity Short Charge and Energy Trades.
1 NPRR638 Back-casting Updated Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 01, 2015.
Market Overview in Electric Power Systems Market Structure and Operation Introduction Market Overview Market Overview in Electric Power Systems Mohammad.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
© Copyright 2011, NASDAQ OMX Commodities Clearing Company. All rights reserved. 1 Presentation to ERCOT Technical Advisory Committee November 3, 2011 A.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
Stakeholder Meeting February 13, 2008 Interaction between Scarcity Pricing and Demand Response Dongqing Holly Liu, Ph.D. Senior Market and Product Economist.
1 Demand Response in Midwest ISO Markets 09 February 2007.
Forward contracts by Samuel Domian and Andrej Husár MPA1.
Protocol Revision Subcommittee Sandy Morris October 6, 2011.
Day Ahead Market Working Group April 14, Agenda Discussion of SMD-style DAM review questions posed by the DAM WG and Coral regarding the SMD-
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
PJM©2013www.pjm.com Economic DR participation in energy market ERCOT April 14, 2014 Pete Langbein.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
THE ELECTRICITY PRODUCERS BID PRICES FORMATION BASED ON PROFITABILITY PhD student, M. sc. ing. Umbrashko I. PhD student, M. sc. ing. Varfolomeyeva R. Dr.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
1 DAM Credit parameters review The “Procedures for Setting Nodal Day Ahead Market (DAM) Credit Requirements Parameters” is a document that is required.
Nodal Credit DAM Non-Business Day Treatment of Available Credit Limit (ACL)
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Swap Contracts. Swaps Swap: An agreement between two parties (“counterparties) to exchange a series of cash flows in the future –Essentially a series.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
1 Tab X ERCOT Confidential Credit Impact of Increased Caps The credit exposure impact of higher system-wide offer caps was estimated using an internal.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
1 Nodal Credit Update at WMS June 16, 2010.
ERCOT CWG/MCWG April 24, 2013 DAM Credit Parameters.
1 Nodal Stabilization Market Call December 03, :30 PM.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
DAM Collateral Requirements Carrie Bivens Manager, Day-Ahead Market Dec 16,
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
WMS – Nodal Credit Integration Start Up May 19,
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
1 NPRR638 Back-casting Updated and Supplementary Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public May 20, 2015.
NPRR639 Discussion CWG/MCWG August 20, Current MCE Calculation MCE ignores net purchases of bilateral energy. See red portion of MCE formula below.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Market Energy Settlements Business Requirements.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
ICE Futures ERCOT North Hub Liquidity Analysis Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 20, 2016.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
Market Credit Working Group update to the Wholesale Market Subcommittee 3/02/
ICE Futures ERCOT North Hub Liquidity Analysis Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit April 11, 2016.
CRR Deration and NPRR821 WMS 09/06/2017.
Real-Time Co-optimization of Energy & Ancillary Services
Principles of Participation in Real-Time Co-optimization
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
* Amendment to Appendix P to ensure correct treatment of Interconnector Unit Offer Data 29th May 2012 * 1##
CME Cash (Spot) Market Cheese, NDM, & Butter Session—
February 12 – 19, 2018.
Understanding Supply.
Correction of Minor Material Drafting Errors
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Update on Market Trials
Presentation transcript:

Carrie Tucker Supervisor, Day-Ahead Market DAM data supporting MCWG/CWG credit parameters discussion February 29, 2012

2 Total DAM Credit Usage February 29, 2012 * Total DAM charges represent the actual settlements amount for the sum of all Energy Bid charges

3 DAM Credit Usage – Energy Bids February 29, 2012

4 DAM Credit Usage – Energy Only Offers February 29, 2012

5 DAM Volume by Type February 29, 2012

6 DAM Energy Bids February 29, 2012

7 DAM Energy Bid Price Behavior February 29, 2012 * Only looks at first PQ pair of a curve

8 DAM Bid Behavior - Effects on Credit Exposure February 29, 2012

9 Counterparties Participating in DAM February 29, 2012

10 Counterparties Participating in DAM February 29, 2012