SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.

Slides:



Advertisements
Similar presentations
Evaluation Independent Monitoring Presented at: LPSC Staffs Technical Conference and ESIs Bidders Conference for the Fall 2006 Limited-Term RFP September.
Advertisements

The Midwest ISO from a Transmission Owner Perspective.
SPP-Entergy Market Power Analysis Presented By: David B. Patton, Ph.D. President, Potomac Economics September 16, 2008.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Network Customer Meeting Access Metric Update November 16, 2006.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
OSC Meeting April 27, Transmission Cost Allocation Overview.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Updated 1/28/2011. Cost Allocations and Affordability of Tariffs March 8, 2011 Jay Caspary ·
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
©2005 PJM 1 APEx The Mature PJM Market Kenneth W. Laughlin PJM October 31, 2005 Orlando, FL.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org Transmission Expansion and Cost Allocations for FERC SPP-Entergy CBA 1.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
1.
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
SPP.org 1. Status Update: Retail Open Access for ETI within SPP Stakeholder Meeting June 20 th, 2008 Austin, TX.
Utility Responsibility to Maintaining Load Reliability Resource Adequacy Forum Technical Committee Meeting June 20, 2007.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
ERCOT – MISO DC Tie Study Comments
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
SPP-Entergy Market Power Analysis Update Presented By: David B. Patton, Ph.D. President, Potomac Economics April 16, 2008.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Response to TAC Questions on PGRR031 TAC– January 28, 2014 Jeff Billo, ERCOT 1.
High Level Post Processing Cost Estimates MWG SSC Meeting September 26, 2011.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Transmission Planning in ERCOT- Overview
Wind Management at MISO
Status Update for Reliability/Market Power Mitigation Assessment
Entergy Integration Study Update
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Status Update for Reliability/Market Power Mitigation Assessment
SPP-Entergy Market Power Analysis
Agenda Provide a recap of primary northern route alternatives for the MPRP Describe basis for selected route N5 Overview of analyses performed Description.
Use of EDWG Data by the LTPT
Strategic Plan and Economic Upgrade Process
Presentation transcript:

SPP.org 1

Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX

SPP.org 3 Activities Completed Since Last Meeting Reliability Assessment  Include 69 kV assessment for 2012 Summer Peak case  Sensitivity with Cottonwood connected to ERCOT  Transfer analysis into ETI as a result of reliability projects Economic Assessment  Input assumptions into PROMOD IV revised based on stakeholder comments  Status Quo 2012 and Base Case run with reliability upgrades completed

SPP.org 4 Reliability Assessment

SPP.org 5 Reliability Study Cases Contingency analysis (N-1) for SPP- ETI system  More stringent reliability criteria in Western Region (N-1, G-1)  Monitored 69 kV and above Several potential thermal and voltage violations found SPP examined a set of reliability upgrades to mitigate these violations  New 500/230 kV Transformers at Orange County and Cypress  Reconductor nine 138 kV lines in ETI area High level planning estimate of projects required to meet SPP Criteria is $115 M COTTONWOOD IN SPP Projects to meet SPP Criteria  New Orange County 500/230kV Transformer + Substation work ($50 M)  New Cypress 500/230kV Transformer ($10 M) Planned Known Projects  ETI Proposed Projects for 2012  Local Reliability projects for Western Region  Transmission Reliability projects from the 2007 approved STEP Plan  ETI Transmission Construction Plan

SPP.org 6 Reliability Study Cases Two Step analysis to assess Cottonwood moving to ERCOT  Identified projects to address Cottonwood exiting SPP (Similar STEP plan, this cost is excluded from Cost/Benefit analysis)  Examined additional reliability projects to address SPP Criteria Major projects to meet SPP criteria include  New 500/230 kV Transformers at Orange County and Cypress  Reconductor six 138 kV lines in ETI area High level planning estimate of projects required to meet SPP Criteria is $90 Million COTTONWOOD IN ERCOT Cottonwood Related Projects Projects to meet SPP Criteria Planned Known Projects  ETI Proposed Projects for 2012  Local Reliability projects for Western Region  Transmission Reliability projects from the 2007 approved STEP Plan  ETI Transmission Construction Plan  New Webre – Richard 500kV line ($180 M)  New Orange County 500/230kV Transformer + Substation work ($50 M)  New Cypress 500/230kV Transformer ($10 M)

SPP.org 7 Cost allocation of ETI Reliability projects Reliability projects are required solely to integrate ETI into SPP SPP policy is to allocate these costs to the local zone  Similar to current discussion with Nebraska entities  Consistent with treatment with Pre Base Plan funding SPP analysis will measure benefits on an equivalent basis

SPP.org 8 Transfer Capability Assessment into ETI

SPP.org 9 Transfer Capability Assessment into ETI Observations based on Market Power Study  No mitigation needed for case with Cottonwood in SPP  Increase transfer capability into ETI by approx 500 MW in the case with Cottonwood in ERCOT Transfer Simulated between the rest of the Entergy and SPP combined into ETI Reliability Projects identified in Base Case are considered for this assessment  Series Compensation on Mt. Olive- Hartburg line also considered ($10 M) Found approx 460 MW transfer capability as a result of all projects above No additional projects recommended at this time

SPP.org 10 Other Activities In Progress Tie Back Analysis to evaluate SPP’s Reliability need for ERCOT QPR option Stability analysis performed by independent consultant (Powertech) for SPP QPR and ERCOT QPR study

SPP.org 11 Economic Assessment

SPP.org 12 Key Market Assumptions – Status Quo Model SPP Market Assumptions  SPP modeled as Day 2 Market planned by SPP Cost Benefit Task Force  System wide unit commitment  System wide treatment of spinning reserve requirements  Security Constrained Unit Commitment and Economic Dispatch  SPP operates as a Single Balancing Authority Entergy (including ETI) Operating Assumptions  System wide unit commitment  Security Constrained Economic Dispatch  Reserve Requirements set and met on Entergy System wide basis  ETI Must Run Generation modeled via transmission constraints that represent voltage constraints  ETI and Entergy IPP output consistent with current operations Hurdle rates between SPP / other Regions and Entergy / other Regions  Dispatch hurdle 7 $/MWh  Commitment hurdle 25 $/MWh

SPP.org 13 Key Market Assumptions – Base Model SPP Market Assumptions same as Status Quo model ETI is a Member of SPP ETI Local Area Operating Assumptions same as Status Quo case Hurdle rates same as Status Quo except no hurdle rate between SPP and ETI

SPP.org 14 Benefit Metric – ETI Adjusted Production Cost Same Benefit metric being used by the SPP Cost Benefit Task Force in the Future Market Design Study Adjusted Production Cost for ETI  Generation Total Variable Cost  + Purchase Cost at ETI Load-Hub Rate  – Sales Revenue at ETI Generation-Hub Rate

SPP.org 15 Entergy-TX Hub Prices On-Peak 2012 ($/MWh)

SPP.org 16 Transmission Congestion Impact on ETI Load Hub Status Quo – impact on $/MWH  Inland – Hartburg line under contingency  (Cottonwood in ETI) and (Cottonwood in ERCOT)  Mt. Olive – Hartburg line under contingency  5.07 (Cottonwood in ETI) and (Cottonwood in ERCOT)  Mabel line under contingency  (Cottonwood in ETI) and (Cottonwood in ERCOT)

SPP.org 17 Transmission Congestion Impact on ETI Load Hub Base Case – impact on $/MWH  Inland – Hartburg line under contingency  4.11 (Cottonwood in ETI)  Mt. Olive – Hartburg line under contingency  6.96 (Cottonwood in ETI) and 6.84 (Cottonwood in ERCOT)  Wyatt – Parnell under contingency  6.80 (Cottonwood in ERCOT)  McAdam line under contingency  4.05 (Cottonwood in ETI)

SPP.org Benefits to ETI Millions of $

SPP.org 19 SPP Load Hub Prices On-Peak 2012 ($/MWh) 2 - 7% increase if ETI joins

SPP.org SPP Generation Impact of ETI Joining SPP (Cottonwood in Eastern Interconnection)

SPP.org Benefits to SPP of ETI Joining SPP

SPP.org 22 Discussion of Findings - ETI Summary of Production Cost Analysis  $136.3 million in lower annual production costs to ETI area with Cottonwood in SPP  $167.3 million in lower annual production costs to ETI area with Cottonwood in ERCOT  Lower production costs driven by decline in ETI generation as ETI purchases more from SPP  Production Cost benefit greater in non-summer months due to lower seasonal demand allowing SPP lower cost generation to serve more ETI load  Major transmission congestion in Mt. Olive/Hartburg/Inland area and around Wyatt/Parnell had major impact on ETI hub prices Entergy – TX hub prices for load decline with inclusion of ETI into SPP about % Cottonwood reduces Entergy – TX load hub prices but lowest Entergy – TX load hub prices occur with ETI in SPP and Cottonwood in SPP

SPP.org 23 Discussion of Findings – SPP SPP/ETI generation increases but overall variable generation costs are lower by $173.4 million (if Cottonwood in EIC) due to more efficient commitment and dispatch SPP benefits due mostly to changes in load and generation hub prices which drive the cost of purchases and sales revenues SPP benefits more if Cottonwood is not included  $559.0 benefit with Cottonwood in SPP  $780.3 million benefit with Cottonwood in ERCOT SPP Load hub prices increase slightly with inclusion of ETI in SPP, about 2 - 7%

SPP.org 24 Questions?

SPP.org 25 Mak Nagle Manager, Technical Studies & Modeling (501)