1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.

Slides:



Advertisements
Similar presentations
October 7, 2013 QMWG Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
Advertisements

Alignment of CSC Shadow Price Caps with New System-wide Offer Caps ERCOT WMS Meeting January 16, 2008.
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Market Solution 1 Definitions Market Solution A Market Solution exists when at least three unaffiliated Resources, with capacity available, submit bids.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
PRR 692 APPEAL PRESENTED BY: Constellation NewEnergy DATE: November 2, 2006.
Market Operations Presentation Board of Director’s Meeting November 18, 2003.
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
DSWG Update to WMS May 17, DSWG Goals Update.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
1 PRR 776 in the Context of the ERCOT Market Design Eric S. Schubert Regulatory Affairs Advisor BP Energy Company.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
ERCOT WHOLESALE MARKET OPERATIONS MODULE 2. 2 Essential Concepts Ancillary Services Congestion Management Topics.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Real Time Mitigation During Exceptional Fuel Cost Events.
Nothing below this point Subtitle Nothing below this point Congestion.
1 WMS Report TO TAC March In Brief Three Working Group Reports Three Working Group Reports Three Task Force Reports Three Task Force Reports EILS.
July QMWG Update (WMS). GREDP Discussion GREDP is currently used as a compliance tool ERCOT is considering now just using it as an investigative tool.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Demand Side Working Group Chairman Slides June 27, 2008 Mary Anne Brelinsky Vice President 1.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
1 ERCOT Wholesale Settlement Module 3. 2 BENA iq = -1 * (Σ (RI iz + LI iz + URC iz + MISD iz + MISR iz ) z + TCRPAY Bei + Σ CSC Bei ) * LRS iq Can you.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Nodal Program Update and SEWG Update COPS 3/12/2011 Jim Galvin.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
1 DAM Credit parameters review The “Procedures for Setting Nodal Day Ahead Market (DAM) Credit Requirements Parameters” is a document that is required.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2007.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
ROS July 10, 2008 Meeting WOTF Update on ROS Action Plan Summary: EECP Step #2 (Feb.26 th, 2008) Mark Garrott WOTF Chair.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
ERCOT Wholesale Market Basics Module 3 Settlement.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
EILS Discussion February WMS. Charge to WMS from PRS The benefit. The cost based on the EILS PRRs. Changes in Market since April 17, 2006.
Ancillary Services Methodology Changes Bill Blevins Manager, Operations Planning.
1 TAC Report to the ERCOT Board November 14, 2006.
Technical Advisory Committee Presentation to the ERCOT Board of Directors October 21, 2008.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.
DAM and Nodal Collateral Requirements Concerns and Solutions December 7, 2009.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
CMWG Update to WMS Met 4/24 & 5/11 Continued Work on PRR 801 –Discussed outages as related to TCR Cases –ERCOT evaluates various outage combinations.
Congestion Management Work Group 2008 Overview CMWG Marguerite Wagner, Reliant Energy Inc.
Report to TAC June In Brief Working Group Reports Working Group Reports CMWG CMWG MCWG MCWG QMWG QMWG VCWG VCWG Other Reports Other Reports NOGRR.
WMS UPDATE CMWG n CMWG has completed their data collection and evaluation of congestion n Based on this evaluation WMS recommends that the same CSCs with.
PRR619 Procedural History DSWG discussed the need to reduce market exposure to default should negative bids be selected and result in negative $/MW MCPC.
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Market Architectures Integrating Ancillary Services from Distributed Energy Resources Olivier Devolder Head of Energy Group N-SIDE.
ERS Procurement Methodology
Presentation transcript:

1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004

2 There are concerns that there are probably costs being uplifted to the Market unnecessarily. As an example, if in the first step of the determination for RPRS there are units that are required to operate and the selection of those units creates no need to make additional RPRS procurements that would have been needed due to system inadequacy without the local constraint procurements, these costs are uplifted. WMS 1/22/2004

3 The question to be investigated is, should these costs be charged to those entities that are short in the Market when the system inadequacy is solved by the local constraint procurements. WMS 1/22/2004

4 Option 1: Average RPRS Price 1.Calculate Average RPRS Price: Average RPRS Price = (Total Cost of Steps 1 and 2) / (MW Cleared in Steps 1 and 2) 2.Parties who are short of capacity will be charged using Max (Average RPRS Price, MCPC step3 ) Note:Step 1: solve Local Congestion; Step 2: solve Zonal Congestion and capacity inadequacy; Step 3: calculate MCPC.

5 Option 2: Additional steps Step 1: solve Local Congestion; Step 2: solve Zonal Congestion and capacity inadequacy; Step 3: calculate MCPC. Step 4: Perform Step 2 again ignoring the procurement in step 1. Step 5: Calculate MCPC for Step 4. Parties who are short of capacity will be charged using Max (MCPC step3, MCPC step5 ) Parties who have scheduled CSC impact will be charged using: Max (SP step3, SP step5 )

6 OptionProsCons (1) Average Price Easy to implement Transparent cost calculation Less accurate cost assignment – Includes procurement costs for local and zonal congestion (2) Additional Steps More accurate cost assignment – Isolates cost for capacity inadequacy and zonal congestion Adds complexity to RPRS market clearing

7