Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation.

Slides:



Advertisements
Similar presentations
Ongoing discussions on the formulation of National Appropriate Mitigation Actions (NAMAs) and their possible inclusion as market mechanisms in a post-2012.
Advertisements

Paulo Manso CDM EB September, 2011 Proceeder for Submission & Approval Standardized Baselines.
The CDM Project Activity Cycle UNFCCC CDM joint workshop March 2003 Bonn Kai-Uwe Barani Schmidt UNFCCC/Cooperative Mechanisms
UN Climate Change Secretariat CDM Project Cycle calibration 1 st Sustainable Development Mechanisms Joint Coordination Workshop Bonn, Germany, March.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
UNFCCC secretariat, programme Gyungae Ha, Programme Officer Ensuring sustainability in project assessment 7 th CDM Joint Coordination Workshop, Bonn, Germany,
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
CERUPT The Experiences so far Reginald Hernaus Ministry of Housing, Spatial Planning and the Environment.
1 Validation and registration Verification and issuance Technical Workshop on CDM Paramaribo, 20 June 2008 Adriaan Korthuis.
CDM – LULUCF Project Cycle Winrock International Sandra Brown Training Seminar for BioCarbon Fund Projects.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Glenn S. Hodes UNEP Risø Center CDM Project Screening & PIN Development.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
UNFCCC Secretariat Overview of the CDM and the CDM project Cycle Training-Workshop to support the “Uganda Municipal Waste Compost Programme” Kampala, Uganda,
SDM programme UNFCCC secretariat Session 2: The CDM project cycle Monitoring, Verification and CER issuance Training-Workshop to support the “Uganda Municipal.
CDM Project Cycle Carbon Markets – CDM project development, 8. August 2010 Jørgen Fenhann.
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Idea’ for JISC Maurits Blanson Henkemans Netherlands Montreal.
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
Accreditation of Independent entities under JI - Status of JISC work Georg B ø rsting UNFCCC Technical Workshop on Joint Implementation, 9-10 March 2006.
Capacity Development for CDM - National Workshop on PDD, Cairo, June Capacity Development for CDM Fourth National Workshop Cairo, June.
CARBON CONTRACTS - the PCF experience September 30, 2002.
Energy efficiency measures in the public building sector: the DEEP project Freiburg, 14 June 2007 Philipp Tepper Sustainable Procurement ICLEI - Local.
· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.
PDD Preparation Cairo, June 14 th -15 th, 2004 TIMS/EEAA CD4CDM- Third National Workshop (Phase II) UNEP RISO / APEXPDD Preparation Process and Format.
The Second Regional Workshop on capacity development for Clean Development Mechanism Siem Reap, Cambodia, March 2004 Capacity Development for Policymakers,
Expertise everyday, everywhere Verifying Sinks and Bio-energy Projects Irma Lubrecht Société Générale de Surveillance.
How to develop a Carbon Finance project?. Assessment of tool - Is this landfill project feasible? Source:
Expert Group Meeting ‘Using Energy Management Standards to stimulate persistent application of Energy Efficiency in Industry’ Alexandre V. MELLO Environmental.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
CLEAN ENERGY MECHANISMS IN CONVENTIONAL POWER GENERATION H.AZOUZ, CDM Project Management Officer at STEG
The CDM Project Cycle. The first step -- submit a PIN (template on Description of Project Proponent Type of Project Location of.
WB Carbon Finance Project Cycle and Role of Key Players Introduction to Carbon Finance March 10, 2004.
Capacity Development for CDM - RW4 Tunis, August Capacity Development for CDM General Description of the Project Cycle Tunis, August.
GIS Development in Romania Vlad Trusca Head of Climate Change Unit Ministry of Environment and Sustainable Development “REC Workshop “Facilitating GIS:
UNFCCC Secretariat Utilizing the existing CDM institutional arrangements for NAMAs Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America.
Validation of Scenario Analysis and Control Group Baselines World Bank/PCF Workshop Delhi, Oct. 22, 2002 Trygve Roed-Larsen Det Norske Veritas (DNV)
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
UNIDO Vietnam Support for CDM projects in the Industrial sector: Pilot Project in Co-operation with the Austrian Industry Training Sessions on the Kyoto.
© 2006 UNDP. All Rights Reserved Worldwide. Proprietary and Confidential. Not For Distribution Without Prior Written Permission. CDM Project Cycle Anna.
CDM Project Cycle LGED Bhaban, Dhaka 8 – 9 April 2008 Presented by Khandaker Mainuddin Fellow, BCAS.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
Seite Hier steht ein thematisches Foto Demand side perspective on JI UNFCCC Side event on Joint Implementation Gertraud Wollansky Federal Ministry.
UNFCCC secretariat, Sustainable Development Mechanisms programme Nashib Kafle, Associate Programme Officer Session 3: The Concept of Programme of Activities.
UNFCCC secretariat From CDM to NAMAs – Synergies between CDM and NAMAs Perumal Arumugam Latin American Carbon Forum, Bogota (03 – 05 Sep 2014)
Morten Pedersen Deputy Programme Director Danish Environmental Protection Agency Climate Change Division.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
The Danish CDM Project Development Facility Gustya Indriani Climate Change Researcher, Yayasan Pelangi Indonesia
JISC work on Small Scale JI Projects UNFCCC Technical Workshop on Joint Implementation Bonn 9 th March 2006 By: Fatou Ndeye Gaye and Evgeny Sokolov.
Determinations / verifications under JI – Experience to date UNFCCC Technical Workshop on Joint Implementation Bonn, February 13 th, 2007 For the benefit.
Capacity Development for the CDM (CD4CDM) First National Workshop - SURINAM Host Country Institutional Issues Miriam Hinostroza UNEP.
1 CDM institutional framework Maria Netto UNFCCC secretariat Addis Ababa 21 October 2003
“Status of the CDM Project Pipeline " Jørgen Fenhann, UNEP Risø Centre Jerba CDM Investment Forum Sept Content of the presentation: 64 CDM.
Italian policies and programmes on JI
CDM –Functional Overview
Clean Development Mechanism
Role of Parties involved in JI-projects: Sweden
UNFCCC Technical Workshop on Joint Implementation
Joint Implementation A Parties and Buyers Perspective
Presentation title Africa Carbon Forum 13 April, 2018 Nairobi
The various tracks of JI…
Small Scale Projects – Learning from the CDM Paul Soffe
Small-Scale Projects Under JI
JISC from COP/MOP 1 to COP/MOP 2 UNFCCC Technical Workshop on JI
Possibilities for promoting environmental protection projects
THE KYOTO PROTOCOL AND BEYOND: A LEGAL PERSPECTIVE, Siena June 10, 2006 The Clean Development Mechanism: Challenges and Opportunities Axel Michaelowa.
Presentation transcript:

Validation and Verification of CDM projects SGS Climate Change Programme Shivananda Shetty Business Manager – SGS India Syed Khursheed Zaidi Operation Coordinator

2 Contents Brief introduction to SGS Track record in the CDM Eligibility Criteria Key steps in the validation and verification process Initial (preliminary) verification (optional) Annual (periodic) verification Conclusions

3 Introduction to SGS SGS is the World’s largest Inspection, Verification, Testing and Certification organisation  30,000 employees in 140 countries  Including offices in Egypt, Morocco, Tunisia, Algeria, Syria, Lebanon, Yemen Offer a very wide range of services designed to facilitate trade. Independent. No manufacturing, trading or financial interests. No consulting services. Accredited UK ETS, EU ETS, CCAR, CCX……. Provisional DOE for CDM in scopes 4,5,6,9,10,11 and 12. Witnessing for Scope 13 underway. Project for Scopes 1,2 and 3 in the pipeline. Submitted the first request for registration of a CDM projects

4 Eligibility Criteria for Validation of CDM Projects The eligibility criteria: In a nut shell, All projects which demonstrate that they supply” Real, Measurable, Long Term Emission Reductions by fulfilling the rules described in Decision 17/CP7 (Marrakech Accord), for more info refer: The project must not be a business as usual and demonstrate additionality, for more info refer those projects submitted for public comments from the following web: Host country approval and confirmation that the project meets sustainable development criteria. Non Host Party letter of approval Project must use approved Baseline and Monitoring methodologies.

5 Eligibility Criteria for Validation of CDM Projects Project must reflect the beneficial requirements of Environmental Social Sustainable Developments Complete version 2 of CDM PDD should be submitted with out altering the template

6 Key Steps in Validation & Verification Process  Use of Approved methodology (Large Projects)  Draft PDD  Final PDD and letters of Authorisation and Approval  Unilateral CDM  Request for Registration  Requests for review

7 Conclusions CDM is slowly gaining momentum Prices for carbon are increasing - EU ETS is creating some demand DOEs are increasing in number and scope of accreditation CDM EB is at an important cross-roads - EB16 and 17 will be quite important meetings Bring projects forward for registration Make sure your meters are calibrated

8 Thank you for your attention. For further information on SGS: Or Also brochures available