1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

Design of Standing-Wave Accelerator Structure
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
RF scenarios and challenges for FCC-ee A. Butterworth, O. Brunner, CERN with input from R. Calaga, E. Jensen, S. Aull, E. Montesinos, U. Wienands.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Stress and cool-down analysis of the cryomodule Yun He MLC external review October 03, 2012.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Anders Sunesson RF Group ESS Accelerator Division
RF system issues due to pulsed beam in ILC DR October 20, Belomestnykh, RF for pulsed beam ILC DR, IWLC2010 S. Belomestnykh Cornell University.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
The RF system for FCC- ee A. Butterworth, CERN Thanks to: O. Brunner, R. Calaga, E. Jensen, E. Montesinos, F. Zimmermann (CERN), U. Wienands (SLAC)
SINGLE-STAGE BUNCH COMPRESSOR FOR ILC-SB2009 Nikolay Solyak Fermilab GDE Baseline Assessment Workshop (BAW-2) SLAC, Jan , 2011 N.Solyak, Single-stage.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
5 K Shield Study of STF Cryomodule Norihito Ohuchi, Norio Higashi KEK Xu QingJin IHEP 2008/3/3-61Sendai-GDE-Meeting.
I. Ben-Zvi Update Ilan Ben-Zvi for the Stony Brook, BNL and AES SPL teams Presented by Rama Calaga.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
1Matthias Liepe08/02/2007 ERL Main Linac: Overview, Parameters Cavity and HOM Damping Matthias Liepe.
Review 09/2010 page RF System for Electron Collider Ring Haipeng Wang for the team of R. Rimmer and F. Marhauser, SRF Institute and Y. Zhang, G. Krafft.
Longitudinal HOM damping estimations for SPL cavity. status W. Weingarten 26 July 20101SPL Cavity WG Meeting.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
704 MHz warm cavity November 4, 2015 A.Zaltsman: SRF & warm RF components for LEReC1  A single cell 704 MHz warm cavity is used to correct the beam energy.
Advances in Development of Diffused Nb3Sn Cavities at Cornell
CRYOGENICS FOR MLC Cryogenic Principle of the Module Eric Smith External Review of MLC October 03, October 2012Cryogenics for MLC1.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
A Four Rod Compact Crab Cavity for LHC Dr G Burt Lancaster University / Cockcroft Institute.
UK-Jlab-TechX Designs for the LHC Crab Cavity Dr G Burt Lancaster University / Cockcroft Institute.
S1 global: thermal analysis TILC09, April 19th, 2009 Serena Barbanotti Paolo Pierini.
Overview of Main Linac Cryomodule (MLC)
5 K Shield Study of STF Cryomodule (up-dated) Norihito Ohuchi KEK 2008/4/21-251FNAL-SCRF-Meeting.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Overview of ERL Projects: SRF Issues and Challenges Matthias Liepe Cornell University Matthias Liepe, TTC meeting, Beijing 2011 Slide 1 Overview of ERL.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
Ralf Eichhorn Cornell on behalf of Paul Bishop, Benjamin Bullock, Brian Clasby, Holly Conklin, Joe Conway, Brendan Elmore, Fumio Furuta, Andriy Ganshyn,
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
Stress and cool-down analysis of the cryomodule
WP5 Elliptical cavities
Odu/slac rf-dipole prototype
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
NC Accelerator Structures
Design Fabrication and Processing Group H. Padamsee
High Gradient Cavities: Cost and Operational Considerations
BriXS – MariX WG 8,9 LASA December 13, 2017.
Wolfgang Anders, BESSY, Berlin
High Q Cavity Operation in the Cornell Horizontal Test Cryomodule
V. Veshcherevich Cornell University
CW Operation of XFEL Modules
Cost Optimization Models for SRF Linacs
ERL Main-Linac Cryomodule
SCRF for cw operating XFEL
CEPC Main Ring Cavity Design with HOM Couplers
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
ILC Cryogenics -- Technical Design Report Planning
Alignment of Main Linac Cryomodule (MLC)
CEPC-650MHz Cavity Cryomodule
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
ERL Director’s Review Main Linac
SNS Coupler Shipping Plans
Presentation transcript:

1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe

2Matthias LiepeAugust 2, 2007 Outline Options for cost reduction SRF Cavities and higher Q 0 Microphonics, RF Power and Input Couplers HOM damping –Waveguide HOM damping –Beam-line absorber Cryomodule Simplifications

3Matthias LiepeAugust 2, 2007 Options for cost reduction Parameteroldnewchange [%] Q0Q0 2.0E+103.0E loaded Q6.5E+071.0E module cost100%80%-6.70 fill factor49%55%-0.80 total-14%-27% “Baseline layout” should work well, but operating costreduction in construction and operating cost is desirable Need to balance lower cost against increased risk ExamplesExamples of parameter tuning/optimization: Cost of cryo- plant  (power) 0.4

4Matthias LiepeAugust 2, 2007 SRF Cavities and higher Q 0 Cavities account for  30% of cryomodule cost! –keep end groups simple: “the end groups (beam pipe, input coupler port, HOM couplers, flanges, transition to LHe container) cost a much as the 9-cells alone.” (D. Proch, COST REDUCTION IN CAVITY FABRICATION) Q 0 =3· at T=1.8K: –9 n  surface resistance gives Q 0 =3· –At 1.8 K with 120C bake: R BCS =3 n   need <6 n  residual resistance –Very good magnetic shielding required (<15 mOe) –This has been achieved in vertical tests

5Matthias LiepeAugust 2, 2007 Q 0 =3· at T=1.8K Such Q-values have been demonstrated in vertical cavity tests, but not in linacs Issues: shielding, FE 16.2 MV/m  R&D program for high Q 0 –High Q R&D program –Daresbury / Cornell / LBNL Test Module –Main linac test module –Main linac module

6Matthias LiepeAugust 2, 2007 Q L =10 8 Microphonics and RF Power for Q L =10 8 <600 W at 12.3 MV/m <1 kW  <1 kW at 16.2 MV/m! peak detuning [Hz] gradient [MV/m] For peak detuning <10Hz: Q L,opt = 10 8 P < 2kW sufficient! We have demonstrated this at the JLAB FEL: time [sec] klystron power [kW] 5.5 mA 4 mA 2.5 mA 0 mA 7-cell cavity

7Matthias LiepeAugust 2, kW RF System (R&D required!) Solid state amplifiers become an alternative to IOTs –Simpler, require less space in tunnel R&D item –40% overall efficiency is feasible (R&D item!) –Similar cost at kW power level, further reduction in cost likely Power RF cables instead of waveguides –Require less space in tunnel –Much simpler input couplers –Much simpler input couplers (similar to the once used in vertical cavity tests) and coupler ports at vacuum vessels 7/16 DIN 7/8" Foam Heliax 2kW cw RF amp Coax input coupler

8Matthias LiepeAugust 2, 2007 HOM Damping Alternative I: Waveguide HOM Damping Scheme Similar to JLAB 1 A plans 6 HOM waveguides per cavity (with integrated fundamental mode input coupler) Design / optimization under progress… High Q 0 requires relative long superconducting niobium waveguide sections Mechanical / thermal design needs to be worked out

9Matthias LiepeAugust 2, 2007 Waveguide HOM Damping Simulations Cell shape optimized for high R/Q*G 85º wall angle Fill factor: 59% 85º Length of beam tubes and Nb section of waveguides adjusted for sufficient attenuation of fundamental mode (-40dB) Niobium section of waveguide

10Matthias LiepeAugust 2, 2007 First HOM Damping Simulation Results Level of damping very similar to damping with beam line HOM absorbers Brillouin diagram Valery Shemelin

11Matthias LiepeAugust 2, 2007 HOM Damping Alternative II: Simplified HOM Beam Line Absorber Fewer absorber tiles Fewer parts overall Reduced length  fill factor increases by  4% to 53% 2 instead of 3 types of materials?

12Matthias LiepeAugust 2, 2007 Simplified HOM Beam Line Absorber: ANSYS Results HOM load allows for 2mm longitudinal length change from cool-down and cavity tuning 1mm longitudinal from F=1kNThermalAtmospheric pressure

13Matthias LiepeAugust 2, 2007 Simplified HOM Beam Line Absorber: CLANS HOM Damping Results  Similar level of HOM damping

14Matthias LiepeAugust 2, 2007 Cryomodule Simplifications No coaxial coupler ports (only feed-thoughts for power RF cables) –No precise machining of ports required –Cavities are free to move longitudinal during cool down  Can use simple, fixed cavity support without breaking the HGRP into sections Simplified thermal shield and outer magnetic shield Tolerances on many parts can be relaxed More items: see Eric’s talk