MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.

Slides:



Advertisements
Similar presentations
58 th MPE-TM – October 2, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report Energy Extraction Systems On behalf of all EE teams involved.
Advertisements

Production Readiness Review of Frascati MWPC Production Site December 4 th, 2003 – P. Campana.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
Upgrade, IST and Powering tests of the 13kA Energy Extraction system Bozhidar Panev – LS1 Review.
41 st LSC – March 21, 2014 G.J. Coelingh, TE-MPE-EE Long Shutdown 1 Status Report The upgrade of 600 A Energy Extraction Systems.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
Upgrades and Activities of 13kA EE systems during LS1 Bozhidar Panev TE-MPE-EE
TE/MPE/EE Presentation to MPE at TM #52 on K. Dahlerup-Petersen TE/MPE/EE – Individual System Tests of the 13 kA Energy Extraction.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
TE-MPE-TM 25/10/2012, ELQA team TP4 System – the main tool for ELQA Mateusz Bednarek, CERN, Geneva Jaromir Ludwin, IFJ-PAN, Krakow.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
Update and status for the Work Unit ‘Energy Extraction’ - equipping the three test benches for series testing of Super-FRS Dipoles D2, D3, D4 and Quadrupoles.
TE-MPE LS1 review 02/06/2015, Mateusz Bednarek, TE/MPE-EE ELQA during LS1 – the “unexpected” activities New developments Exceptional NCs Other tests.
TE/MPE/EE J. Mourao T/MPE/EE 23 December 2012 LHC Machine Redundant Power supply (DQLPUR) & interface Module (DQLIM) assembling during LS1.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
13 kA Energy Extraction LHC machine Gert Jan Coelingh – Knud Dahlerup-Petersen – TE/MPE/EE.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
TE-CRG-CE OMP Meeting 06 / 11 / 2014TE-CRG-CE OMP Meeting.
TE/MPE/EE Summary of Electrical Engineering Session Ed & Knud K. Dahlerup-Petersen TE/MPE/EE 23 November RB – RQ EE facility consolidation & upgrades.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
Special interventions Status of production and QC Nicolas Bourcey TE-MSC-MDT Fourth LHC Splice Review November 2013.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
TE-MPE LS1 workshop – November 22-23, 2012 G.J. Coelingh TE-MPE-EE LS1 The upgrade of 600 A ENERGY EXTRACTION SYSTEMS.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Christophe Martin TE-MPE-EP 02/06/ The BIS and SMP activities during LS1 MPE Group Review, 2 June 2015 Christophe Martin, Stephane Gabourin & Nicolas.
July 11, 2007 HC WorkshopG.J. COELINGH - AT / MEL 1 Energy Extraction.
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
PROPRIETARY INFORMATION - © 2015 WOODWARD, INC. PAGE 1 HighPROTEC-2 MRI4-2 Feeder Relay Sales presentation 2015/08/10.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
EDMS N° V.1 TE-EPC Activities during LS1 V. Montabonnet [TE-EPC]
07/05/2015 MPE-TM G.J. Coelingh, A. Dinius, A. Erokhin TE-MPE-EE Quality assurance and tests  Quality assurance should include:  Before arriving to CERN.
Warm Magnets - LS1 Feedback J. Bauche, on behalf of the TE-MSC-MNC Team.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Mikhail Ovsienko TE-MPE-EE
Power Supply and Energy Extraction System for the CBM magnet
Beam Interlock System SPS CIBU Connection Review
Document Plan & Milestones WP7
RELIABILITY OF 600 A ENERGY EXTRACTION SYSTEMS
Looking back on 2014 and Perspectives for the MPE Group in 2015
Nikolaos TRIKOUPIS on behalf of TE-CRG-CI CRG-TM for LS2 preparation Preliminary activities of the CI section 25/09/2017
J. Uythoven for the MPE-MI & MS Teams
MPE main activities planned for LS2
Status of ELQA equipment and related software
Powering from short circuit tests up to nominal
LS1 TE/MPE/EE CABLE ACTIVITIES
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Power Supply and Energy Extraction System for the CBM magnet
PSS verification and validation
Review of hardware commissioning
Presentation transcript:

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems On behalf of all EE teams involved

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE OUTLINE 1. EES introduction. 2. Planning and resources. 3. What was done during LS1, achievements / problems. 4. HWC, achievements / problems. 5. What should be learned, improved, changed.

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE 600A Energy Extraction Systems   202 systems installed in the LHC tunnel in corrector circuits with stored energy between 2.2 and 150 kJ.   In 15 different locations: 8 x UA parallel service tunnel and 6 x RR and 1 x UJ tunnel caverns.   Systems developed in close collaboration between CERN and the Budker Institute of Nuclear Physics (BINP), Novosibirsk, Russia. Delivered to CERN in 2005.

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE 600A Energy Extraction Systems

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE LS1 Actions   Breakers - Regular maintenance and Consolidation.   Equalizing Resistors – Installation & wiring of Thermostats.   Voltage measurement channel improvement.   Visual inspection of main axles – Endoscope.   Individual System Test (IST) and Short Circuit Test.   Hard-Ware Commissioning (HWC).

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE

~ 0.4 man-year over period of 18 months ~ 2 man-months over period of 3 months ~ 10 man-months over period of 5 months ~ 1 man-year over period of 6 months ~ 2 man-year over period of 6 months

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE LS1 problems  “Internal” problems Breaker contacts: Increasing number of breakers towards the end of SCT period: P6, P7, P1, P2: < 5%. “short” time between maintenance and SCT P8 & P3: 30%. Reasons: One year after cleaning, high humidity (or water on the floor during long time) systems unpowered and breakers opened P4 and P5: 10 % of breakers. Reason: almost one year after cleaning systems unpowered and breakers open). Changing transformers (overheating of zener diodes with the old ones).  “External” problems: At many points AC power (UPS) was not present – hard to check the systems after interventions. “water damage” in UA67 – 16 systems were replaced by spares which were just delivered 2 months before – reducing the number of new spares from 20 to 4. Dust on top of the racks and water under the racks is often event => influence on the systems reliability and breakers contacts.

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE LS1 problems found Water damages in UA67

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE LS1 problems found Water on the floor in UA83_87 Dust on top of the racks in UA67

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Hardware Commissioning  Circuits powering tests PLI3.b1 (200A) and PNO.b1 (nominal): EE role was to participate in PLI3.b1 and PNO.b1 tests to validate EE systems.  Automatic measurements in the tunnel: With the help of ELQA team we checked our “most worried” parameters of the systems.  Automatic analysis tool: helped to optimize the analysis efforts and delegate it to the CCC shifts

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Hardware Commissioning Automatic measurement system based on PXI

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Hardware Commissioning Automatic analysis tool

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Lessons learnt for future  Positive/good to repeat  Good planning and preparations well in advance.*  Automatic measurement system is very useful (in and de-installation in the shadow).  Automatic analysis tool is very useful (less need for expert presence in CCC).  Teams involved showed lots of goodwill and worked hard. *Preparations before LS1  jobs and procedures were discussed and frozen more than 1.5year before start of LS1.  resources and time needed were calculated 1 year in advance.  All documents (manuals for the teams detailed to minor operation including guides/pictures) were prepared approx. one year before start of LS1.  All components and parts were ordered and received in advanced.  All tools sets (optimized for each type of job) were prepared before start of LS1.  Few minor items were not in time (delivering of endoscope), but did not influence the schedule.

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Lessons learnt for future  Less positive/ better not to be repeated  External factors (listed before).  Too often too many breakers to clean – procedure should be optimized.  Rotation of personnel was not very efficient (training “on the job” in case of external short term personnel => unforeseen increase of workload of the experts); external personnel must be experienced to execute the tasks they are hired for.  Wi-Fi absent or bad reception in many points.  WorldFip and PM not operational during IST and SCT.

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Lessons learnt for future  To improve  More people should be trained on constant base (mostly CERN staff or long-term external personnel).  Automatic measurement system – should be integrated into sequencer and PM generation and analyser.  Automatic analysis tool – reference curves should be closer to the reality: more detailed simulations, “field” measurements results implementation.  Signature rights and analysis procedures (improved at the end of HWC).  High resolution AMS cards are still in the pipe-line.  Treat non-conformities on the same base as ELQA team does.  Start late(r) with nominal infrastructure and conditions prior to HWC (maintenance of breakers) - breakers should be cleaned as close to the HWC as possible. If SCT is needed there is only one way to do it – after the cleaning campaign.  To have in mind: we have 5 sets of Jaromir’s measurements systems – should be carefully stored and kept until next campaigns, to be tested several months prior the next use.

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Thanks for your attention!

MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE LS1 actions LIST 1New Voltage divider board 2New voltage measurement wires + Vtap 3Thermostats on equalizing Resistors 4New Thermostat connection PCB 5Wiring Thermostat PCB to connector SK24 6Replacement of A and Z imbus to hexag. Screws 7Screwed connections "torque" check 8Breaker maintenance general and Breaker plate gluing 9Visual inspection main axle 10Interlock PCB resistor change 11Interface card firmware upgrade 12Acquisition and Monitoring board (firmware) upgrade 13New measurement PCB 14Replacement of transformer (- overheated zener) 15Dump Resistor modification - RQTL9