Quantifying Electrical Distribution Risk Canadian Airports Electrical Association – CANEW 2014 DateOctober 1 st, 2014 AuthorShawn BALDING.

Slides:



Advertisements
Similar presentations
The Department of Energy Enterprise Risk Management Model
Advertisements

Risk Management at Harvard – Panel Discussion Harvard IT Summit
Lisanne Sison Director ERM Bickmore
S3-1 © 2001 Carnegie Mellon University OCTAVE SM Process 3 Identify Staff Knowledge Software Engineering Institute Carnegie Mellon University Pittsburgh,
Introduction to Enterprise Risk Management (ERM)
Executive Insight through Enhanced Enterprise Risk Management Leverage Value From Your Risk Management Investment.
Tax Risk Management Keeping Up with the Ever-Changing World of Corporate Tax March 27, 2007 Tax Services Bryan Slone March 27, 2007.
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
Implementing SMS in Civil Aviation: the Canadian Perspective.
Reliability Risk Assessment
The Nature of Strategic Management
IT Governance and Management
Chapter 10 Information Systems Management. Agenda Information Systems Department Plan the Use of IT Manage Computing Infrastructure Manage Enterprise.
Enterprise Risk Management in DHHS
ERM for the Non-Risk Manager
8 Managing Risk Teaching Strategies
PAINTING THE FULL PICTURE
IT ASSET MANAGEMENT (From Booz-Allen & Hamilton).
Company Program. Disaster Recovery A Disaster Recovery Plan is a plan for business continuity in the event of a disaster that destroys part or all of.
Privileged and Confidential Strategic Approach to Asset Management Presented to October Urban Water Council Regional Seminar.
COBIT® 5 for Risk Introduction
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
The District Technology Plan The District Technology Plan Melanie & David Dillard Melanie & David Dillard
An Introduction to AlarmInsight
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Audits & Assessments: What are the Differences and How Do We Learn from the Results? Brown Bag March 12, 2009 Sal Rubano – Director, Office of the Vice.
1 Enterprise Risk Management (ERM) Program PNM Resources, Inc. March 29, 2007 Presentation to American Public Power Association March 2007 Austin, Texas.
2014 PAMIC Financial Management Seminar Enterprise Risk Management Presentation Jeff Pratt – Director FP&A September 30, 2014.
Enterprise Risk Management
Physical Building Audit Physical Building Audit By; Engr.Dr.Attaullah Shah PhD ( Civil) Engg, MSc Engg ( Strs), BSc Engg ( Gold Medalist),), MBA, MA (
Managing Risk for Opportunity. In the absence of certainty, the only way to maintain potentiality is to focus on excellent execution and demonstrable.
Risk Management for Technology Projects Geography 463 : GIS Workshop May
Tapping into private sector resources for humanitarian shelter projects: The opportunities offered by the Disaster Resource Partnership Shelter meeting.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
An Integrated Control Framework & Control Objectives for Information Technology – An IT Governance Framework COSO and COBIT 4.0.
Overcoming The Challenges Together Fred Brisbois Director, Aviation & Product Safety Sikorsky Aircraft REDUCING THE ACCIDENT RATE AHS Forum 63 May 3, 2007.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
An Overview of the Smart Grid David K. Owens Chair, AABE Legislative Issues and Public Policy Committee AABE Smart Grid Working Group Webinar September.
Insurance and ERM: Some Global Trends Craig Thorburn Lead Insurance Specialist, The World Bank Policy Advisory Consultant, CGAP
The Connection between Risk Management and Internal Control in Organizations Mag. Norbert Wagner Budapest,
Overcoming The Challenges Together Fred Brisbois Director, Aviation & Product Safety Sikorsky Aircraft REDUCING THE ACCIDENT RATE.
Nancy L. Owens & Karyn Boston
An R&D Manager’s Perspective TechExpo October 5, 2004 Presented by: Veena Rawat.
Bank Audit. Internal Audit Internal audit is an independent, objective assurance activity and can give valuable insight in providing assurance that major.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Copyright © The OWASP Foundation Permission is granted to copy, distribute and/or modify this document under the terms of the GNU Free Documentation.
Risk Management - “Local Government Pitfalls.” IMFO – Sustainability Workshop Risk Management 30 March
NFPA 1600 Disaster/Emergency Management and Business Continuity Programs.
Presentation to Membership. A Recap of Our Process February 2009: Decision to renew strategic plan March 2009: Engagement of Berlin, Eaton.
ISMS Implementation Workshop Adaptive Processes Consulting Pvt. Ltd.
Sapient Insurance Partners. Overview & Services We have almost four decades of combined experience in the property & casualty insurance and reinsurance.
CAS Spring Meeting June 2007 Introduction to ERM …The Measurements, Quadrants, Tools, and Solutions Prof. Mark C. Vonnahme Fox Family Clinical Professor.
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
PIC EU-28 Conference Paris, 26 – 27 November 2015 PIC An EU Approach Assurance Maps An Introductory workshop Nathan Paget United Kingdom.
Five Risk Management Best Practices Scott Moss, CIS P/C Trust Director ERM – ISO
Dolly Dhamodiwala CEO, Business Beacon Management Consultants
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Financial Risks David Wong Friday 21 May 2004, Staple Inn Hall wp c.
JMFIP Financial Management Conference
Implementing SMS in Civil Aviation: the Canadian Perspective
Service Management World Class Operations - Impact Workshop.
Systematic Project Management is our answer to the challenges in today’s project business We have the biggest portion of our business volume coming from.
The Role of Financial Leadership in a Challenging Economic Climate “Financial Management from a Provincial Perspective” Presented by: Bruce L. Bennett.
8 Managing Risk (Premium).
COSO and ERM Committee of Sponsoring Organizations (COSO) is an organization dedicated to providing thought leadership and guidance on internal control,
L’asset management appliqué aux Chemins de Fer
An Overview.
Top Strategies for Asset Performance Management (APM)
Cybersecurity ATD technical
Resilience Framework Mark Lauby, Senior Vice President and Chief Reliability Officer WIRES Winter Meeting February 15, 2018.
Presentation transcript:

Quantifying Electrical Distribution Risk Canadian Airports Electrical Association – CANEW 2014 DateOctober 1 st, 2014 AuthorShawn BALDING

Shawn Balding Offer Manager for Schneider Electric Canada Field Services Journeyman Electrician Electrical Engineer Previously was the North American R&D Hardware manager for Power Logic and ION meter development, as well as chair and risk assessor of a global offer safety committee 2

How do you quantify and communicate your electrical distribution risk to management? 3

Risk Reaction Spectrum 4 Without a structure or framework in place, everyone will have their own interpretation of any given risk. The Challenge in Quantifying Risk

The Challenge in Communicating Risk 5

Enterprise Risk Management A framework for identifying, communicating, and managing risks and opportunities. 6

A Justification & Application Guide to Deploying ERM at Airports 7

Excerpt from example ERM Policy “…We will involve, empower, and give ownership to all of our staff in the identification and management of risk.” 8

Example Airport Risk Tolerance Map 9

Example Airport Risk Appetite Statements 10 “If it ain’t broke, don’t fix it.”

Example Airport Risk Tolerance Map 11

12 The aging infrastructure install base and the retiring generation of knowledge in maintaining it. This is particularly true in electrical distribution. Drivers in Operational Risk

Leading Cause of Unscheduled Downtime Aging equipment (45%) and insufficient maintenance (28%) are the leading causes of unscheduled downtime, according to respondents. 13 *Source: PLANT ENGINEERING Maintenance Study February 2014 (n=317)

Average Age of Installed Electrical Distribution Systems 39% of the installation base is more than 20 Years old* 14 *Source: ARC Strategies Survey March 2011

15 The aging infrastructure install base and the retiring generation of knowledge in maintaining it. This is particularly true in electrical distribution. Drivers in Operational Risk

Age Distribution of Canada’s Population 36% of the population base is over 50* 16 *Source: Stats Canada

Age Distribution of Canada’s Population For 2014, 1100 Canadians will turn 65 years old everyday* This will increase steadily over the next fourteen years to 1450 per day in *Extrapolation from Stats Canada Census Data

Example Age Distribution of the Labour Force – Public Service Knowledge Management challenges have never been greater and will continue to grow 18 *Source: Treasury Board of Canada Population

Industry Experience Q: For approximately how long have you worked in a plant or engineering-related position? 33% of plant maintenance staff have 30 or more years of experience* 19 *Source: PLANT ENGINEERING Maintenance Study February 2014 (n=317)

20 The equipment is going to keep getting older and the people with the bulk of the tacit knowledge in how to maintain it are going to keep retiring. Drivers in Operational Risk

Enterprise Risk Management A framework for identifying, communicating, and managing risks and opportunities. This may be how you decide to, or how you are asked to, manage these drivers of Operational Risk. 21

ERM Requires… A mature, robust, & sustainable method for risk identification & prioritization > Identification & Prioritization  Identified risks should be assessed in terms of financial and non-financial impact and likelihood to enable prioritization and focus of resources for mitigation and control. A breadth of functional expertise is critical to the risk identification and assessment process, incorporating operational excellence, strategic decision- making, technical knowledge, and the external operating environment. 22

ERM Requires… A mature, robust, & sustainable method for risk identification & prioritization > Sustainable means that it can survive the experience lost through retirement.. 23

24 What does this look like for my Airport? “Should risk assessment demand quantitative analysis, it is likely that additional expertise will be required.”

25 Operational Risk Identification IEEE Based Age and Stress Level Analysis Software Based Risk Assessment & Criticality Mapping Recommended Actions An Advantage Electrical Distribution Assessment (MP4) is:

26 How Mature is your Risk Identification and Prioritization? ACRP 74 Appendix B

Leading Cause of Unscheduled Downtime Aging equipment (45%) and insufficient maintenance (28%) are the leading causes of unscheduled downtime, according to respondents. 27 *Source: PLANT ENGINEERING Maintenance Study February 2014

How You Plan to Reduce Unscheduled Downtime Thirty-one percent of respondents mentioned implementing better preventive maintenance in order to decrease future unscheduled downtime. 28 *Source: PLANT ENGINEERING Maintenance Study February 2014

How You Plan to Reduce Unscheduled Downtime An Advantage Electrical Distribution Assessment (MP4) produces four plans Maintenance Plan Modernisation Plan Monitoring Plan Management Plan 29 *Source: PLANT ENGINEERING Maintenance Study February 2014

30 Step 1Step 3Step 2Step 4 Operational Risk Identification Identify Unwanted Events Map Critical Distribution Points Analyze the Distribution System Asset Life Cycle Operational Stress Safety/Regulatory/ Design Issues Operational Risk Assessment Reliability/ Unavailability Mapping Criticality Mapping Recommended Actions Addressing Deficiencies Four Plans for Improvement

Management Plan Assessment Recommendations Monitoring Plan System Productivity/ Reliability Time Initial Performance What you need from your system Maintenance Plan Modernisation Plan Date of Advantage Assessment (MP4) Original Installation Deficiency Corrections Performance Degradation 31

How do you quantify and communicate your electrical distribution risk to management? 32

33 Questions?