Alternative Buffer Material Project meeting #2 2006-11-30.

Slides:



Advertisements
Similar presentations
Materials And Construction Technology PALESTINE UNIVERSITY Chapter No. 6 Tiling.
Advertisements

HVAC523 Heat Sources.
INTRODUCTION. Seminar on IMPROVEMENT OF THERMAL EFFICIENCY BY RECOVERY OF HEAT FROM IC ENGINE EXHAUST.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
EURADWASTE´04 Large-scale Experiments in Underground Research Laboratories Experience in EBS Engineering Development and Handling Feasibility Christer.
DOPAS Project: Demonstration of Plugs and Seals The FSS Experiment (Full Scale Seal) J.M. Bosgiraud, F. Plas, R. Foin, G. Armand, J. Morel More about the.
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
 Established in 1995  Located in Wilmington, NC with a 40,000 Sqft facility.  Specializes in the design and manufacturing of connection solutions. 
Manual Flo-tap Installation Instructions
@earthscience92. What is Matter? Matter – Anything that has mass and takes up space. – Makes up most materials. – Can you think of something that is not.
CONDOMS A series of presentations developed by TGPSH/GTZ and PSI-TANZANIA.
Making a trap cage. You need plastic bottles, wire, string, a plastic bag and tools.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Drug Delivery & Tissue Engineering Laboratory
Screw Lift Prepared by : Areen abu kishek Amjad Haj Yousef Julia Thaher Heba Asmar Mohammed Qasrawi Presented To : Eng. Jad Mouqadi.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Wood Frame Construction Common Components of a Traditional Wood Framed Building Gateway – Unit 7 – Green Architecture © 2012 Project Lead The Way, Inc.Green.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Task #8: Hydraulic interaction rock/bentonite Objectives: Scientific understanding of the exchange of water across the bentonite-rock interface. Better.
Hydro-Electric Generator Manual Group number 403 Dan KJ Daewoo JT Group number 403 Dan KJ Daewoo JT.
Improvements for next parts PIMS production meeting February 2013 Rolf Wegner.
ABM Project meeting 2012 The upcoming TR report: Content and mayor findings Some thoughts about the continuation Daniel Svensson.
CYLINDER HEADS AND VALVES. 1.DEFINITION  Cylinder head is a casting that covers the top of a cylinder.
Posiva Oy Olkiluoto Eurajoki Puh. (02) 8372 (31) faksi (02) DOPAS Demonstration of Plugs and Seals Posiva Plug Experiment POPLU at URCF.
Summary of the Executive Session TF#22. Status of Task 6 Papers and Reports All MG have delivered drafts. Waiting for the overall paper from the reviewer,
Starter:.
Coconut oil extraction This presentation is an introduction only. There is more to do. Oil can be extracted if the coconut is dried then water added to.
MAGNA M a g n a D i g i t e c h I n d i a P r i v a t e L i m i t e d STEEL FABRICATTION TO DUCTILE IRON CASTING CONVERSION PROJECT NAME: CHARGE AIR PIPE.
THE UNDERDOG By Lexi Walsh and Maddi Savedra. The objective of the Can Challenge was to build a insulator box (10 cm x 10 cm x 20 cm) that can keep a.
Contributed by: Integrated Teaching and Learning Program, College of Engineering, University of Colorado at Boulder.
Malmö, ABM meeting May 2012 Mineralogical investigations of the alternative buffer material test – II. Exchangeable cation population rearrangement Dohrmann,
An-Najah National University Faculty of Engineering & IT Mechanical Engineering Department P repared by Waleed Najjar Khaled Jawabreh Jehad Shamlouli Supervisor.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
TRENTON Casing Filler Presentation
Floating and Sinking.  Density is a measure of how closely packed the atoms in a substance are  Density is a physical property  All matter has measurable.
1 CXS490 - Pre-Engineered Fire Protection Systems Off-Road Vehicle Systems.
1. What is Density?  A. Amount of atoms (mass) divided by the space (volume) they take up, M/V.
Block Manufacturing Ulf Nilsson Clay Technology. Materials IkosorbIKO Deponit Ca-NCAN Ibeco Seal M-90IBE Friedland TonFRI Asha 505ASH CalcigelCAL.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
Equipment and apparatuses for growing crystals by hydrothermal method Shvanskiy P.P., Pereverzev D.V. Shvanskiy P.P., Pereverzev D.V. Arkhipov M.A., Romanov.
Lithium Hydride Absorber Program C. M. Lei March 17, 2008.
Recognize various soil types Discuss soil horizons
@earthscience92. What is Matter? Matter – Anything that has mass and takes up space (volume) – Makes up most materials. – Can you think of something that.
Page 1 Sapphire Training Report in Mineral from Anice Lee and Sky Huang ~
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
1 Proposal of the mechanical support on the Buffer for the 10“ PMTs by Enrique Calvo Alamillo.
DENSITY RULES. All pieces of the SAME material (no matter what the size) should have the density. When a piece breaks, the density of each piece is the.
Daniel Svensson 1 Alternative Buffer Materials Project meeting 30 nov Contents -Short introduction of myself -My part in the project.
CYLINDER HEADS AND VALVES. 1.DEFINITION  Cylinder head is a casting that covers the top of a cylinder.
Baby Mind C OIL DESIGN AND ASSEMBLY SCENARIOS Helder Silva Phillipe Benoit Alexey Dudarev Gabriela Rolando Herman ten Kate Etam Messomo Laurent Nicola.
Quality Control and Troubleshooting Arista Biologicals Inc.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
1 Waste volumes and categories Low active waste Medium active waste High active waste Short livedCategory A Category C Long livedCategory B Category C.
SPS High Energy LSS5 Thermal contact & cooling aspects
First Wall Panel - Overview
WELD POLYETHYLENE (PE) PIPE USING FUSION METHOD
DENSITY RULES.
Ti/SS transitions A.Basti INFN-PISA*
Physics Support Materials Higher Mechanics and Properties of Matter
Properties of Fluids.
Test box for ProtoDUNE SP – Integration Test
Properties of Fluids.
Making a trap cage.
Fuel Supply System Chapter 21 Lesson 1.
Density -density is the amount of stuff in a given volume; it is symbolized as ρ -it is mass per volume; note that units can be virtually any mass or volume.
P.Fabbricatore & S.Farinon
Cryomodule Assembly Plan
After service guide for changing PCB
Presentation transcript:

Alternative Buffer Material Project meeting #

Agenda 09:00Welcome and introduction Project status. Anders Eng, Acuo Engineering 09:45Block Manufacturing. Ulf Nilsson, Clay Technology 10:15 Coffee 10:30Bentonite characteristics Dietrich Koch, IKO Minerals 11:15Experiment site visit 12:00Lunch 13:00Storage (parameters, amount etc) Anders Eng 13:15Future work, analyses Daniel Svensson, SKB - 15:00Discussions

Talk points Project outlines Installation Current status Future work

Talk points Project outlines Installation Current status Future work

Project goals Verify laboratory results with in situ studies, emphasis on temperature, scale and geochemical conditions. Discover possible problems with block manufacturing and handling Give further data for verification of thermo-hydro-mechanical (THM) and geochemical models.

International participation Participating organizations: SKB Andra BGR GRS JAEA Nagra Posiva RAWRA University of Bern

Experiment design Experiment design based on LOT experiment with some modifications: Several materials Less instrumentation Shorter deposit holes Complete package length heated Steel pipes No inserts or tracers m Short time (1-2 years). Heated from start. Artificial saturation from start. Medium time (2-4 years). Heating starts when buffer is saturated. Artificial saturation from start. Long time (  5 years). Heated from start. No artificial saturation.

Materials Block material: Ikosorb Deponit CA-N Ibeco Seal M-90 Friedland Asha 505 Calcigel Febex Kunigel V1 Callovo Oxfordian (both discs and remoulded) Rokle Mx-80 Granulates: MX-80 MX-80 with quartz Total of 14 variations of 11 materials !

Talk points Project outlines Installation Current status Future work

Experiment site

Package design Package parts: Steel pipe Buffer blocks Saturation system Instrumentation Heater system ”Backfill”

Steel pipes ”Black” steel. Bottom plate welded to pipe. Welds are pressure leak tested. Corrosion prevention at top and bottom.

Buffer blocks Roughly 100 blocks manufactured Block dimensions: –10 cm high –Dy = 29 cm –Di = 11 cm Pressure about 100 MPa. Density about 2 g/cm kg each.

Granulate cage Problem: Keep granulates in place during installation. Used tools / materials should not interfere with experiment. Solution: Steel granulate container. Frame will take force from blocks above. Same material as heater pipe. GeoTextile keep granulates in place and allows water passage. Open at top and bottom for interaction with surrounding blocks.

Granulate cage

Saturation system System properties: Four perforated titanium pipes in each package Pipes connected in pair at package bottom – flushing possible. 0,1 m between perforation in package 1. 1 m between perforations in package 2 & 3. Pipes protected by “plastic textile” – prevent holes from clogging with sand.

Sensors Monitoring temperature and humidity: Thermocouples –20 per package Temperature indicators, –2 between each block. Relative humidity sensors –4 in package number 2.

Sensors

Putting the pieces together

Talk points Project outlines Installation Current status Future work

Current status Project status as of today: All three packages assembled and installed in deposit holes. Monitoring system completed. Remaining buffer blocks are in storage. Remaining work Final assembly of saturation system Heater installation System startup

Talk points Project outlines Installation Current status Future work

Storage Reference blocks is presently stored on Äspö. Temperature above 0°C. Temperature variations with season. Blocks wrapped in plastic bags and put in boxes. Other parameters to consider? Test program – Daniel Svensson is responsible for planning from SKB side.