Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Nick Walker KEK-DESY meeting 7 th March 2005.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
Philip Burrows LCABD Meeting, RHUL 12/04/07 WP7: Beam feedback and control systems Philip Burrows John Adams Institute Oxford University.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
Measuring and Improving Practice and Results Practice and Results 2006 CSR Baseline Results Measuring and Improving Practice and Results Practice and Results.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Introdcution to Workpackage/Activity Reflection D. Schulte.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Global Design Effort Progress and Plans of the Beam Delivery Systems and Machine Detector Interface WG Daniel Schulte (CERN), Brett Parker (BNL), Andrei.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
FP7: EuCARD after a year of preparation… A.Jeremie.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
1 MICE RLSR Summary of Issues Relating to Question One of Review charge ‘ Given a resource-limited, year-by-year schedule for the project, how reasonable.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
BPM development at ATF/CLIC
Oversea collaborators
What Should We Do?.
CLIC-ILC BDS & MDI work.
ATF2 review R. Tomas ATF2 review web:
CLIC/ILC Collaboration Meeting: Objectives & Organization
Beam Delivery System Schedule at ILC2010
Andrei Seryi Materials for discussion TILC-08
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
Presentation transcript:

Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007

Global Design Effort 2 Dec 19, 2007, A.Seryi,T.Tauchi Support our UK colleagues We would like to start from expressing our complete support to UK colleagues, in this difficult times, when STFC announced withdrawal from ILC and applied pressure of funding cuts to HEP and Universities research The worldwide ILC community is mobilized to provide support in many ways As one of the actions, the ATF collaboration is preparing letter that will highlight importance of UK contribution to International Research Facilities, such as ATF, stressing that such research give immediate results and may also give direct opportunity for engagement of UK industry

Global Design Effort 3 Dec 19, 2007, A.Seryi,T.Tauchi ATF2 Scaled down model of ILC final focus

Global Design Effort 4 Dec 19, 2007, A.Seryi,T.Tauchi ATF2 construction Assembly hall before construction Assembly hall emptied for construction Construction of reinforced floor Construction of shielding Photos: Nobu Toge

Global Design Effort 5 Dec 19, 2007, A.Seryi,T.Tauchi ATF2 goals & schedule ATF2 goals –prototype ILC Final Focus system –develop FF tuning methods, instrumentation (laser wires, fast feedback, submicron resolution BPMs) –learn achieving ~35nm size & ~nm stability reliably –possibly test ILC Final Doublet prototype with beam ATF2 final goal – help to ensure collisions of nanometer beams, i.e. luminosity of ILC ATF2 schedule –start of commissioning with beam: Autumn 2008 –commissioning & beam size studies: 2009 –assessment of beam size studies: beginning of 2010

Global Design Effort 6 Dec 19, 2007, A.Seryi,T.Tauchi Importance of ATF2 for EDR ATF2 goals are essential for Engineering Design Report phase of ILC –The EDR phase extends to the middle of 2010 ATF2 is one of central elements of Beam Delivery System EDR work, as it will address a large fraction of BDS technical cost risk ATF2 results on beam size are expected to come within the EDR time, and will affect the EDR Assessment of ATF2 studies on beam size are one of the top deliverables of EDR R&D plan What does it mean for us:

Global Design Effort 7 Dec 19, 2007, A.Seryi,T.Tauchi Preparing for ATF2 start Internal friendly reviews by ATF collaboration –at the project meetings like this one External formal reviews by ILC Project Managers –With invited independent reviewers & formal reports to PMs The formal PM driven review tentatively suggested for late spring – early summer At this 5 th ATF2 Project Meeting, we should identify critical path items – they will be the topics of PM driven review

Global Design Effort 8 Dec 19, 2007, A.Seryi,T.Tauchi Checking the readiness Status of construction Status of hardware essential for ATF2 goals –How do we mitigate funding difficulties –How we focus on key systems Overall integration of beamlines –Any important systems missed from discussion? –E.g. what are specs for electrical noises & plans for grounding? Procedures & shift organization –How to ensure focus on the primary goals? –Is continuous (>week) operation required? –How to optimize shift schedule?

Global Design Effort 9 Dec 19, 2007, A.Seryi,T.Tauchi Checking the readiness… ATF Damping ring readiness –Importance of routine achievement of design  –Can we do this just with existing hardware? –Should methods like MIA be implemented? –Standardization & how to guarantee repeatability? Readiness of control system for envisioned tuning –How contribution of collaborators can be included? Readiness for remote participation –Number of remote participants will be increasing –Will communication hardware be ready? –Paper logbooks? Strongly encourage use of e-logs?

Global Design Effort 10 Dec 19, 2007, A.Seryi,T.Tauchi Schedule of the meeting Review of technical readiness of –hardware, production plans –installation & integration –control system work, etc. Planning for the future –long term plans – Final Doublet upgrade, etc Closed session on budget –Friday 8am-9am Technical Board and System/Group Coordinators meeting –Friday afternoon Forget the year party on Friday evening!

Global Design Effort 11 Dec 19, 2007, A.Seryi,T.Tauchi Let’s start Next: Conventional facilities and construction schedule –Conveners: Junji Urakawa, Nobuhiro Terunuma