Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.

Slides:



Advertisements
Similar presentations
1 CM24 – 2 nd June 2009 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Advertisements

1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen R&D System Operational Procedures and Test Plan M Courthold.
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
MICE OsC – 22 nd June 2010 Liquid-hydrogen system and absorber M Hills T Bradshaw M Courthold S Ishimoto W Lau I Mullacrane P Warburton.
1 MICE Hydrogen System Elwyn Baynham, Tom Bradshaw, Iouri Ivaniouchenkov RAL MICE / RAL Safety RAL, 30 October 2003.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE Superconducting Solenoids: Status and Update RAL: T W Bradshaw M Courthold J Rochford M Hills D Baynham Oxford: J Cobb W Lau S Yang MICE.
Hydrogen Hazard Summary and Preliminary FMECA and HAZOP Yury Ivanyushenkov Elwyn Baynham Tom Bradshaw.
1 Status of Hydrogen System Development MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov, Tom Bradshaw, Elwyn Baynham, Mike Courthold,
CM26 – 26 th March 2010 Step IV: Liquid Hydrogen Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
1 MICE Absorber working group Columbia, 13 June 2003 MICE Hydrogen System. Preliminary HAZOP. Elwyn Baynham, Tom Bradshaw and Iouri Ivaniouchenkov,
MICE Safety System DE Baynham TW Bradshaw MJD Courthold Y Ivanyushenkov.
MICE Project Board 23 rd September 2010 Liquid Hydrogen and General Infrastructure M Hills T Bradshaw M Courthold S Griffiths T Hayler S Ishimoto A Lintern.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Hydrogen R&D system HAZOP and failure analysis Yury Ivanyushenkov, Elwyn Baynham, Tom Bradshaw, Mike Courthold, Matthew Hills and Tony Jones.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
MICE Hydrogen System Design Tom Bradshaw Iouri Ivaniouchenkov Elwyn Baynham Columbia Meeting June 2003.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
MICE hydrogen review Summary of system hardware. System function To provide 22 litres of liquid hydrogen for use as a muon absorber within a superconducting.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
Mechanical Safety Systems and DSEAR Compliance
MICE hydrogen review System modifications. Relief circuit repair During leak testing of R&D tests, the insulating vacuum would not go lower than
MICE Hydrogen System Tom Bradshaw Yury Ivanyushenkov Elwyn Baynham Meeting October 2004 – Coseners House.
MICE Hydrogen Control System MICE H2 Review Meeting RAL 15 th Jan 2015 PJ Warburton – STFC Daresbury Lab.
1 Project Manager Report Andy Nichols, STFC MICE Collaboration Meeting, RAL, June 2009.
The MICE Hydrogen System Summary Tom Bradshaw, Yury Ivanyushenkov, Elwyn Baynham, Tony Jones, Mike Courthold and Matthew Hills Rutherford Appleton Laboratory.
MICE CM30 7 th July 2011 Liquid Hydrogen Delivery System M Hills (STFC, RAL) T Bradshaw (STFC, RAL) M Courthold (STFC, RAL) S Ishimoto (KEK) A Muir (STFC,
MICE - UK Project Progress Roy Preece 30 th April 2013.
Iouri Ivaniouchenkov RAL Safety considerations at RAL July 9, RAL MICE Collaboration Meeting 1.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
1 Liquid Hydrogen R&D test report Video Conference – 23/08/12 S Watson P Warburton M Courthold.
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
1 MICE MPB/RLSR Integration of Step IV Readiness of the major subsystems Installation sequence and schedule considerations Logistics, staffing and local.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Hydrogen Delivery System Schedule MICE Schedule Review 23 rd -25 th May 2011 M Hills STFC.
MICE Hydrogen Control System MICE Safety Review Meeting 4 th Oct 2011 PJ Warburton - Daresbury Lab.
Issues with variable thickness absorbers Iouri Ivaniouchenkov, RAL MICE Video Conference, 22 Jan
CM31 - Vacuum System Update Mike Courthold Matt Hills 1.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
CM28 - Vacuum System Update Matt Hills Mike Courthold 1.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
SOME CEDAR NEWS Lau Gatignon / EN-MEF TD meeting 12/07/2011  Summary of HAZOP and Zoning meeting  Forthcoming CEDAR related work at CERN.
1 Small Coolers for MICE Michael A. Green University of Oxford Department of Physics Oxford OX1 3RH, UK MICE Collaboration Meeting RAL.
Hydrogen Control System MJD Courthold TW Bradshaw Y Ivanyushenkov D Baynham.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Hydrogen System Update Video Conference 19 th January 2012 S Watson.
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Progress on Hydrogen R&D System Yury Ivanyushenkov on behalf of Elwyn Baynham, Tom Bradshaw, Mike Courthold Matthew Hills, Tony Jones MICE Collaboration.
1 Liquid Hydrogen R&D test report CM34 – 17/10/12 S Watson P Warburton M Courthold.
1 Liquid Hydrogen update CM33 S Watson P Warburton M Courthold.
1 MICE absorbers work package MPB – 27/10/15 Mike Courthold Mark Tucker Phil Warburton Steve Watson.
1 MICE Hydrogen system Working group mtg – 01/09/14.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Replacing hydride bed with bottle Advantages No risk of diminished bed capacity Following jobs no longer necessary – Move pressure gauge – Replace cracked.
Working group meeting 07/05/15. Agenda Overview of review and current action list Relief system – Summary of problem – Details of analysis, testing and.
S A Griffiths CM42 June 2015 Electrical & Control.
Hydrogen System Update
Absorber progress MICE-ISIS review of the liquid hydrogen system will be held in early January; guidance from Nominated Engineers on the imported absorber.
MICE CM31 Schedule summary
Status of Hydrogen System Development
Presentation transcript:

Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills

Hydrogen Pre-Operation Safety Review 4 th October 2011 In Block Diagram 2 –Each Hydrogen Delivery System in MICE is designed to fill an Absorber with 22L of liquid hydrogen (~18000L (or 18m 3 ) of gas) in a controllable and safe manner. –Prior to use with the final MICE absorbers, the system will be tested with a Test Cryostat which represents the final absorber (this is the “R&D system”)

Hydrogen Pre-Operation Safety Review 4 th October 2011 System Components

Hydrogen Pre-Operation Safety Review 4 th October In CAD 4 Relief lines Ventilation ducts Fans Test Cryostat Gas Panel Enclosure Vacuum Pump Enclosure

Hydrogen Pre-Operation Safety Review 4 th October 2011 In photos 5 – Gas Panel Enclosure is situated on the south mezzanine – Hydride Bed heater/chillers located along the mezzanine – Ventilation and vacuum pipework is routed above the magnetic shield wall – Test Cryostat sits at floor level, approximately in the eventual location of the third AFC module

Hydrogen Pre-Operation Safety Review 4 th October H2 Charging Station –Hydrogen “Charging Station” (right) installed below south mezzanine –Will provide a ventilated area for hydrogen bottles during the periods when the hydride beds are being filled –Hydrogen bottles will only be brought into the hall during charging. This means for 1-2 days max. and (hopefully) once per bed.

Hydrogen Pre-Operation Safety Review 4 th October 2011 Hydrogen Local Control Room (HLCR) 7 –L ocated adjacent to the main hall, opposite the MICE Local Control Room – Home to the Hydrogen System control racks: – one for control functions specific to the first system – one for general control functions (H2 detection and ventilation system) – Houses the UPS and battery rack to keep safety critical systems running during a power outage

Hydrogen Pre-Operation Safety Review 4 th October 2011 On the roof 8 – Vacuum Pump Enclosure (left) houses the vacuum pumps and is ventilated by the two smaller fans in the fan stack (right) – Ventilation stack contains the fans and flow monitoring – The relief lines vent above the stack platform

Hydrogen Pre-Operation Safety Review 4 th October External Helium and Nitrogen Store –Storage area for the nitrogen and helium bottle packs that serve the system –Final stage of construction still in progress –Gas panels for connection of the bottle packs have been manufactured and are ready to be fitted –Gas panels include regulators that allow for automatic switching between packs –Current estimate is that continuous purging of the relief lines with nitrogen will use ~1pack/week (with 3 systems) –With two packs of nitrogen in position and automatic changeover, there will be a week to replace a used pack during continuous running 9

Hydrogen Pre-Operation Safety Review 4 th October 2011 In reality... Hall Tour: –Will visit all the areas described above –Hall is a CDM (Construction Design and Management) area and also a (very low) radiation area –PPE and radiation monitoring will be provided –Please stay with the guides and watch your step 10

Hydrogen Pre-Operation Safety Review 4 th October 2011 Latest news Matt Hills is taking a two-year career break – very best wishes from MICE Stephen Watson of STFC assumes responsibility for LH2 system w.e.f October 17 th Successful pre-operation safety review held at RAL, expect formal report next few days Minor pipework on bottle rack and vac system to do, but all major installations are complete Very likely we can repeat LHe test and do LH2 test early in 2012 Director-level safety responsibility (David Wark) has been established at RAL 11