13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.

Slides:



Advertisements
Similar presentations
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Advertisements

MRP and Related Concepts
Material Requirements Planning (MRP)
CHAPTER MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights.
Materials Requirements Planning
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
MRP and ERP Chapter 12.
Class 24: Chapter 15: Materials Requirements Planning Class 24 Agenda –Review Deliverables Due Dates –Review Final Exam 90% of the 30 questions will come.
1 Chapter 15 MRP and ERP. 2 Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods. Dependant.
MRP and ERP Copyright © 2015 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of McGraw-Hill.
MRP, MRP II, and ERP.
 You should be able to: 1. Describe the conditions under which MRP is most appropriate 2. Describe the inputs, outputs, and nature of MRP processing 3.
Chapter 12 MRP and ERP.
Material Requirements Planning
Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Product Structure Tree.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
Adeyl Khan, Faculty, BBA, NSU. Material requirements planning (MRP)  Computer-based information system that translates master schedule requirements for.
MRP Material Requirements Planning. MRP …is a planning and scheduling technique used for batch production of assembled items. … is a computer-based information.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
13-1MRP and ERP. 13-2MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements.
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 14 MRP and ERP.
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 18 Materials Requirements Planning.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
MRP.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Material Requirements Planning
CHAPTER 12 MRP and ERP H.W.: 2,6,8, and 17..
Materials Requirements Planning
Chapter 15 MRP and ERP.
1 Materials Requirements Planning. 2 Material Requirements Planning Defined Materials requirements planning (MRP) is a means for determining the number.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. MRP (Material Requirement Planning) (Method under Dependent.
© The McGraw-Hill Companies, Inc., Master scheduling Material requirements planning Order scheduling Weekly workforce and customer scheduling Daily.
Materials Requirements Planning. Collins Industries  Largest manufacturer of ambulances in the world  International competitor  12 major ambulance.
Materials and Resource Requirements Planning CHAPTER FIFTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 MRP and ERP Chapter Transparency on aggregate to master plan.
Materials Requirements Planning
1 MRP AND ERP Chapter 12 MIS 373: Basic Operations Management Additional content from Jeff Heyl and L. Beril Toktay.
© The McGraw-Hill Companies, Inc., Chapter 15 Materials Requirements Planning.
BUAD306 MRP.
11-1  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased.
Chapter 12: Learning Objectives Instructor Slides You should be able to: 1.Describe the conditions under which MRP is most appropriate 2.Describe the inputs,
15-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
1 © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved Chapter 16 Materials Requirements Planning.
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 MRP and ERP.
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All Rights Reserved. Chapter 14 MRP and ERP.
MRP and ERP McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP  Material Requirements Planning (MRP) is a software based production planning and inventory control system used to manage manufacturing processes.
1. Enterprise Resource Planning Enterprise Resource Planning Systems is a computer system that integrates application programs in accounting, sales, manufacturing,
Chapter 13 MRP: Material Requirement Planning ERP: Enterprise Resource Planning.
13-1MRP and ERP William J. Stevenson Operations Management 8 th edition.
Chapter 13 MRP and ERP.
SISTEM INFORMASI ENTERPRISE
LESSON 5 Introduction to Materials Requirements Planning (MRP)
MRP and ERP Chapter 14 Dr. H. Kemal İlter, BE, MBA, DBA
Lecture 34 MRP and ERP Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
MRP and ERP.
CHAPTER 14 MRP and ERP.
Chapter 12 MRP and ERP McGraw-Hill/Irwin
MRP and ERP.
14 MRP and ERP.
Material Requirement Planning (MRP)
Production and Operations Management
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

13-1MRP and ERP William J. Stevenson Operations Management 8 th edition

13-2MRP and ERP CHAPTER 13 MRP and ERP McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.

13-3MRP and ERP  Material requirements planning (MRP): Computer-based information system that translates master schedule requirements for end items into time-phased requirements for subassemblies, components, and raw materials. MRP

13-4MRP and ERP Independent and Dependent Demand Independent Demand A B(4) C(2) D(2)E(1) D(3) F(2) Dependent Demand Independent demand is uncertain. Dependent demand is certain.

13-5MRP and ERP  Dependent demand: Demand for items that are subassemblies or component parts to be used in production of finished goods.  Once the independent demand is known, the dependent demand can be determined. Dependant Demand

13-6MRP and ERP Dependent vs Independent Demand Time Demand Stable demand “Lumpy” demand Amount on hand Safety stock Figure 13.1

13-7MRP and ERP MRP InputsMRP ProcessingMRP Outputs Master schedule Bill of materials Inventory records MRP computer programs Changes Order releases Planned-order schedules Exception reports Planning reports Performance- control reports Inventory transaction Primary reports Secondary reports Figure 13.2

13-8MRP and ERP  Master Production Schedule  Time-phased plan specifying timing and quantity of production for each end item.  Material Requirement Planning Process Product Structure Tree Lead Times MPR Inputs

13-9MRP and ERP Master Schedule Master schedule: One of three primary inputs in MRP; states which end items are to be produced, when these are needed, and in what quantities. Cumulative lead time: The sum of the lead times that sequential phases of a process require, from ordering of parts or raw materials to completion of final assembly.

13-10MRP and ERP Planning Horizon Procurement Fabrication Subassembly Assembly Figure 13.4

13-11MRP and ERP Bill-of-Materials Bill of materials (BOM): One of the three primary inputs of MRP; a listing of all of the raw materials, parts, subassemblies, and assemblies needed to produce one unit of a product. Product structure tree: Visual depiction of the requirements in a bill of materials, where all components are listed by levels.

13-12MRP and ERP Product Structure Tree Chair Seat Legs (2) Cross bar Side Rails (2) Cross bar Back Supports (3) Leg Assembly Back Assembly Level Figure 13.5

13-13MRP and ERP Inventory Records  One of the three primary inputs in MRP  Includes information on the status of each item by time period  Gross requirements  Scheduled receipts  Amount on hand  Lead times  Lot sizes  And more …

13-14MRP and ERP MPR Processing  Gross requirements  Total expected demand  Scheduled receipts  Open orders scheduled to arrive  Planned on hand  Expected inventory on hand at the beginning of each time period

13-15MRP and ERP MPR Processing  Net requirements  Actual amount needed in each time period  Planned-order receipts  Quantity expected to received at the beginning of the period  Offset by lead time  Planned-order releases  Planned amount to order in each time period

13-16MRP and ERP MRP Outputs  Planned orders - schedule indicating the amount and timing of future orders.  Order releases - Authorization for the execution of planned orders.  Changes - revisions of due dates or order quantities, or cancellations of orders.

13-17MRP and ERP MRP Secondary Reports  Performance-control reports  Planning reports  Exception reports

13-18MRP and ERP Other Considerations  Safety Stock  Lot sizing  Lot-for-lot ordering  Economic order quantity  Fixed-period ordering

13-19MRP and ERP  Food catering service  End item => catered food  Dependent demand => ingredients for each recipe, i.e. bill of materials  Hotel renovation  Activities and materials “exploded” into component parts for cost estimation and scheduling MRP in Services

13-20MRP and ERP Benefits of MRP  Low levels of in-process inventories  Ability to track material requirements  Ability to evaluate capacity requirements  Means of allocating production time

13-21MRP and ERP Requirements of MRP  Computer and necessary software  Accurate and up-to-date  Master schedules  Bills of materials  Inventory records  Integrity of data

13-22MRP and ERP  Expanded MRP with emphasis placed on integration  Financial planning  Marketing  Engineering  Purchasing  Manufacturing MRP II

13-23MRP and ERP MarketDemand Productionplan Problems? Rough-cut capacity planning Yes No Yes No Finance Marketing Manufacturing Adjust production plan Master production schedule MRP Capacityplanning Problems? Requirementsschedules Adjust master schedule MRP II Figure 13.14

13-24MRP and ERP  Enterprise resource planning (ERP):  Next step in an evolution that began with MPR and evolved into MRPII  Integration of financial, manufacturing, and human resources on a single computer system. ERP

13-25MRP and ERP ERP Strategy Considerations  High initial cost  High cost to maintain  Future upgrades  Training