Diagnostics Overview for the LCLS Presented by Josef Frisch For the LCLS ANL / LBNL / LLNL / SLAC.

Slides:



Advertisements
Similar presentations
Femtosecond Pump / Probe Operation and Plans at the LCLS
Advertisements

R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Richard M. Bionta XTOD July 19-21, 2005 UCRL-PRES-xxxxxx X Ray Diagnostics LCLS FAC Meeting Oct. 27, 2005.
James Welch October 30, FEL Commissioning Plans J. Welch, et. al. FEL Commissioning Plans J. Welch, et. al. Accelerator.
Patrick Krejcik LCLS April 29, 2004 Breakout Session: Controls Physics Requirements Overview P. Krejcik.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
Cecile Limborg-Deprey Injector Commissioning September Injector Commissioning Plans C.Limborg-Deprey Gun exit measurements.
R. M. Bionta SLAC November 14, 2005 UCRL-PRES-XXXXXX LCLS Beam-Based Undulator K Measurements Workshop Use of FEL Off-Axis Zone Plate.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
P. Emma, SLACICFA XFEL July 29, 2004 Electron Bunch Measurements with a Transverse RF Deflector P. Emma ICFA XFEL 2004 Workshop July 29, 2004 ICFA.
Patrick Krejcik LCLS April 7-8, 2005 Breakout Session: Controls Physics Requirements and Technology Choices for LCLS Instrumentation.
Diane Fairley High Level October High Level Applications FAC Review October 12, 2006 High Level Applications.
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Low Emittance RF Gun Developments for PAL-XFEL
SPPS, Beam stability and pulse-to-pulse jitter Patrick Krejcik For the SPPS collaboration Zeuthen Workshop on Start-to-End Simulations of X-ray FEL’s August.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
FLASH II. The results from FLASH II tests Sven Ackermann FEL seminar Hamburg, April 23 th, 2013.
A bunch compressor design and several X-band FELs Yipeng Sun, ARD/SLAC , LCLS-II meeting.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
P. Krejcik LINAC 2004 – Lübeck, August 16-20, 2004 LCLS - Accelerator System Overview Patrick Krejcik on behalf of the LCLS.
‘S2E’ Study of Linac for TESLA XFEL P. Emma SLAC  Tracking  Comparison to LCLS  Re-optimization  Tolerances  Jitter  CSR Effects.
Sept 16-17, 2003 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Controls.
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
Franz-Josef Decker 14-Dec-2011 CSR is a big deal limiting performance Tolerance studies beforehand helped a lot Tor’s List Software adaptability helped.
What did we learn from TTF1 FEL? P. Castro (DESY).
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
Operation and Upgrades of the LCLS J. Frisch 1,R. Akre 1, J. Arthur 1, R. Bionta 2, C. Bostedt 1, J. Bozek 1, A. Brachmann 1, P. Bucksbaum 1, R. Coffee.
Bunch Length Monitor Development
LCLS_II High Rep Rate Operation and Femtosecond Timing
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
Slice Parameter Measurements at the SwissFEL Injector Test Facility
Short pulse, low charge LCLS operation
Accelerator Physics and Engineering Update Jan 6, 2010
Revised Commissioning Strategy
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
Commissioning Status of the LCLS Accelerator and Undulator Systems
Diagnostics overview and FB for the XFEL bunch compressors
Accelerator Physics and Engineering Update Jan 6, 2010
LCLS Injector Diagnostics
Z. Huang LCLS Lehman Review May 14, 2009
FEL-Beam-Dynamics Group
Linac/BC1 Commissioning P
LCLS Commissioning P. Emma, et al
High Level Physics Applications for LCLS Commissioning
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Breakout Sessions SC1/SC2 – Accelerator Physics
Breakout Session SC5 – Control Systems
Diagnostics RF and Feedback
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
Photon Systems Breakout Lehman Review July 11, 2007
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Breakout Session SC5 – Control Systems
Breakout Session SC1/SC2 – Accelerator System
Breakout Session SC3 – Undulator
Presentation transcript:

Diagnostics Overview for the LCLS Presented by Josef Frisch For the LCLS ANL / LBNL / LLNL / SLAC

250 MeV4.3 GeV GeV OTR or YAG screen BPM in dispersive location Wire Scanner Pyroelectric bunch length monitor Laser Heater Tune-up Stopper Beam arrival time cavity X-ray Gas Detector RF structure - S- band RF structure – X band Transverse Cavity Quad scanned for emittance measurements 135 MeV 500 eV-10 KeV X-ray Gas Attenuator Primary LCLS Diagnostics BPMs distributed throughout machine not shown Undulator

3 Stripline Beam Position Monitors 4.8 micron resolution at 200pC S. Smith et. al.

4 Cavity Beam Position Monitors ~300nm Resolution 250pC Expect ~2 micron resolution at 20pC Note: good resolution has been demonstrated in high Q cavity bpms for multi-bunch beams (ATF Japan)

5 Beam Orbit (stripline BPMs) Undulator BC2 LINAC Orbit too Small to see

6 Undulator Orbit (cavity BPMs)

7 Transverse Orbit Feedbacks Gun Launch Injector launch X-band launch L2 Launch L3 Launch Sector 28 Launch BSY Launch DL2A DL2B LTUUndulator Launch Orbit Feedbacks operate independantly at ~10 Hz. Provide stabilization, not jitter supression Time slot control (120Hz) in near future. Possible cascading for better bandwidth

8 Electron Beam Transverse Screens Ce:YAG Cathode Emission Image at 6 MeV Ce:YAG in 135 MeV spectrometer TCAV on OTR in 135 MeV bend, TCAV on 135 MeV OTR image COTR makes OTR screens useless above 250 MeV 10,000X enhanced COTR

9 Wire Scanners No Jitter Correction With Jitter Correction

10 TCAV Bunch Length Measurement Can't measure bunch lengths <~20 femtoseconds RMS with S-band X-band TCAV 4X F, 2X V Resolution to ~2fs RMS X-band with SLED? TCAV with wire scanner

11 Relative Bunch Length Monitor Pyroelectric detector good from 100GHz to light (response is not flat) Si transmits from mm-wave to ~20 um and 7um to 1um

12 Precision Timing System Phase Cavity Fiber System Experiment Laser System Phase cavity measures electron beam timing Noise ~10fs, drift ~100fsec Note that X-ray timing may not exactly match electron beam timing Fiber system (LBNL) transmits time information ~100M to Near Hall laser. ~20 fs stability Laser system locking ~25fs stability

13 Phase Cavity System Standard Deviation of single cavity ~100fs RMS Time Difference between Cavities ~100 fs drift over 1 day Standard deviation of difference between cavities ~15 fs RMS Phase Cavity Adjustable Attenuator Mixer 2805 MHz X6 Multiplier 476 MHz Reference 51 MHz ¼ Divider Digitizer 16 Bit 2856 MHz 119 MHz Phase Measurement Software Trigger

14 Master Source MDL PLL Injec tor L2L3 BC1 DL2 Undulato r PCA V AM O PLL Optical / RF phase Detector Optical transmitt er Optical / RF phase Detector ΔΦ X6 Pha se Det Pha se Det PCA V BP Filte r BP Filte r BP Filte r BP Filte r ΔΦ Feedback Lengths Matched Laser BP Filte r Lase r Diod e Feedback 476 Out (unused) High Pow er RF High Pow er RF High Pow er RF BLD Full timing sytsem ~50 fs timing (offline reconstruction) When discussing timing systems, need to ask “stability relative to WHAT reference?“

Longitudinal Feedbacks GeV 135 MeV Undulator Energy → amplitude Energy and bunch length → Amplitude and phase Energy and bunch length → Amplitude and phase Energy → amplitude (phases of 2 sectors) Longitudinal feedbacks operate independently at ~5Hz (MATLAB) In L2 and L3 amplitude is controlled by moving phases in opposite directions

1.5 ÅEt over- compressedEt under- compressed E t f fully compressed peak current Monitor (CSR) gasdetector Ultra-short Bunch Operation Operate at 20pc near full compression, estimate 5 femtosecond FWHM bunch length Challenge for diagnostics – low charge, better timing precision desired

GeV Undulator Quick-change Diagnostic (ST0) Port 1: Test samples for wavelenth filters, diffraction slits, visible light blocking filter, X-ray attenautors Port 2: Ce:YAG screen, thermal sensor (future) Port 3: B4C Stopper to protect downstream safety stoppers Designed for rapid changes

GeV Undulator X-ray YAG: YAGXRAY 100um Ce:YAG Screen YAGXRAY 10KeV Saturation Curve YAG saturates At high intensity or Long wavelength

19 Primary FEE Diagnostics Gas Detector Gas Attenuator Direct Imager (Scintillator) FEL Offset Mirror Systems Beam Direction Solid Attenuators K-Monochromator Thermal Sensor Slit Collimators Pop-in cameras Reticule C0 collimator (in e- beam dump Fixed Mask Gas Detector Originally designed to help find lasing R. Bionta

20 Direct Imager YAG Screen Scintillators YAG::Ce NFOV Camera (12 x 12 mm) WFOV Camera (60 x 60 mm) UV and visible light sources ND filter wheels

GeV Undulator X-ray YAGs: Direct Imager Direct Imager Multiple Ce:YAG screens 5um, 100um, Wide and narrow field of view Direct Imager WFOV 20pc at 800eV NFOV Gas and solid attenuators allow adjustment of intensity to avoid saturation Speckle from Be Attenuator Pop-in monitors

22 Gas Detector FEL Primary photoelectrons cause N 2 molecules to fluoresce in the near UV N 2 gas inlet Photo detector Magnet coils Removable aperture Vital for user operations: Provides non-invasive shot by shot pulse energy to users and accelerator operations

23 Gas Detector Calibration Energy loss scan, vary steering measure energy loss from DL2 to dump 10 MeV 2.5mJ Calibration of gas detector against energy loss (linearity check)

24 Monocromator Datum Axis Set to pass 8.17 KeV Scan of K-mono transmission vs beam energy Can use harmonics for calibration at longer wavelengths Would like a Spectrometer

25 Total Energy Monitor Raw signal from total energy sensor Calibration of TE sensor against energy loss Cryogenic pulsed temperature rise sensor By the time this was operational we were trusting calibration from the e-beam energy loss

26 Critical Diagnostics for Operations BPMs: High stability low noise BPMs critical to machine operation Relative bunch length monitor Wire Scanners: For us these are the ONLY option for electron beam size measurements Single shot beam time monitor X-ray YAG screens: Versatile diagnostic. Gas Detector: Non-invasive pulse energy diagnostics.

27 What we need: Near Term Calibrated thermal X-ray pulse energy monitor Needs to be compact and inexpensive for installation after each X-ray mirror X-ray spectral measurement Can probably use the SXR experiment spectrometer with K-edge foils for absolute calibration Electron bunch length measurement for ultra- short bunches Multi-bunch diagnostics

28 What we need: Longer Term Non-invasive X-ray bunch length measurement Non-invasive, single shot X-ray to Laser relative time measurement with 1fs resolution Non-invasive single shot X-ray spectral measurement Above measurements need to work over full operation range (500eV to 10 KeV) Difficult Problems – Will keep us busy!

29 Comments Diagnostics are critical: Tolerances in XFELs are too tight for operation "as built". Need resources to build diagnostics after operation begins. New machines are likely to produce surprises. Some surprises are good! Close integration with experiments is important: XFELS have more flexibility and more variability than synchrotron sources. Experimenters need extensive online beam instrumentation.