LCG Introduction John Gordon, STFC GDB June 8 th 2011.

Slides:



Advertisements
Similar presentations
CREAM John Gordon GDB November CREAM number of sites now – gstat2 says 24. Batch systems supported Experiment Tests Feedback from sites. Evaluation.
Advertisements

New VOMS servers campaign GDB, 8 th Oct 2014 Maarten Litmaath IT/SDC.
Pilots 2.0: DIRAC pilots for all the skies Federico Stagni, A.McNab, C.Luzzi, A.Tsaregorodtsev On behalf of the DIRAC consortium and the LHCb collaboration.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) WLCG GDB, CERN 8 July 2015.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP35, Liverpool 11 Sep 2015.
LCG Introduction John Gordon, SFTC GDB December 2 nd 2009.
The HEPiX IPv6 Working Group David Kelsey EGI TF, Prague 18 Sep 2012.
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
LCG Introduction John Gordon, STFC GDB September 9th 2009.
UK NGI Operations John Gordon 15 th May NGS continuation NGI Security Monitoring VOMS Helpdesk I am reacting to some issues highlighted by Jeremy.
LCG Introduction John Gordon, STFC-RAL GDB September 9 th, 2008.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
WLCG Collaboration Workshop 7 – 9 July, Imperial College, London In Collaboration With GridPP Workshop Outline, Registration, Accommodation, Social Events.
GDB July 2015 Jeremy’s quick summary notes Also refer to the meeting minutes
WebFTS File Transfer Web Interface for FTS3 Andrea Manzi On behalf of the FTS team Workshop on Cloud Services for File Synchronisation and Sharing.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
Security Policy Update David Kelsey UK HEP Sysman, RAL 1 Jul 2011.
LCG Introduction John Gordon, STFC-RAL GDB May 2, 2007.
HEPiX IPv6 Working Group David Kelsey GDB, CERN 11 Jan 2012.
LCG Introduction John Gordon, STFC GDB September 14 th 2011.
LCG Introduction John Gordon, STFC GDB December14 th 2011.
EMI INFSO-RI Argus Policies in Action Valery Tschopp (SWITCH) on behalf of the Argus PT.
Federated Identity Management for HEP David Kelsey HEPiX, IHEP Beijing 18 Oct 2012.
CCRC’08 Monthly Update ~~~ WLCG Grid Deployment Board, 14 th May 2008 Are we having fun yet?
WLCG Planning Issues GDB June Harry Renshall, Jamie Shiers.
Accounting Update John Gordon and Stuart Pullinger January 2014 GDB.
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
GDB Introduction Ian Collier STFC Rutherford Appleton Laboratory Group info (if required) GDB, January 13 th 2016.
LCG Support for Pilot Jobs John Gordon, STFC GDB December 2 nd 2009.
December GDB Brief summary – J Coles. Meetings January meeting moved to 15 th 2014 events created. Check March meeting outside CERN. Copenhagen workshop.
DJ: WLCG CB – 25 January WLCG Overview Board Activities in the first year Full details (reports/overheads/minutes) are at:
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
LCG Introduction John Gordon, STFC GDB July8th 2009.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
New solutions for large scale functional tests in the WLCG infrastructure with SAM/Nagios: The experiments experience ES IT Department CERN J. Andreeva.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Andrea Sciabà Ideal information system - CMS Andrea Sciabà IS.
WLCG Operations Coordination Andrea Sciabà IT/SDC 10 th July 2013.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
Placeholder ES 1 CERN IT EGI Technical Forum, Experiment Support group AAI usage, issues and wishes for WLCG Maarten Litmaath CERN.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Ian Collier, STFC, Romain Wartel, CERN Maintaining Traceability in an Evolving Distributed Computing Environment Introduction Security.
ATLAS Distributed Computing ATLAS session WLCG pre-CHEP Workshop New York May 19-20, 2012 Alexei Klimentov Stephane Jezequel Ikuo Ueda For ATLAS Distributed.
CERN - IT Department CH-1211 Genève 23 Switzerland t IT-GD-OPS attendance to EGEE’09 IT/GD Group Meeting, 09 October 2009.
News from the HEPiX IPv6 Working Group David Kelsey (STFC-RAL) HEPIX, BNL 13 Oct 2015.
The HEPiX IPv6 Working Group David Kelsey (STFC-RAL) EGI OMB 19 Dec 2013.
GGUS summary (3 weeks) VOUserTeamAlarmTotal ALICE7029 ATLAS CMS LHCb Totals
Outcome should be a documented strategy Not everything needs to go back to square one! – Some things work! – Some work has already been (is being) done.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
LCG Introduction John Gordon, STFC-RAL GDB June 11 th, 2008.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
WLCG Operations Coordination report Maria Dimou Andrea Sciabà IT/SDC On behalf of the WLCG Operations Coordination team GDB 12 th November 2014.
Accounting Update John Gordon. Outline Multicore CPU Accounting Developments Cloud Accounting Storage Accounting Miscellaneous.
Flexible Availability Computation Engine for WLCG Rajesh Kalmady, Phool Chand, Vaibhav Kumar, Digamber Sonvane, Pradyumna Joshi, Vibhuti Duggal, Kislay.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
LCG Introduction John Gordon, STFC GDB December 7 th 2010.
Jeremy Coles, STFC-RAL GDB April 4, 2007
Communication, Communication, Communication
Ian Collier STFC Rutherford Appleton Laboratory
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
Update on Plan for KISTI-GSDC
John Gordon, STFC-RAL GDB March 11, 2009
John Gordon, STFC-RAL GDB April 8th 2009
John Gordon, STFC GDB October 12th 2011
John Gordon, STFC-RAL GDB June 6, 2007
John Gordon, STFC GDB April 6th 2011
ARGO Central Monitoring
Presentation transcript:

LCG Introduction John Gordon, STFC GDB June 8 th 2011

LCG Attendance at GDB is open to all T0, T1, T2, but there is also an official national membership that WLCG may contact for occasional national matters. – Please review and let me know if the names are still correct. No corrections since the last GDB so I assume everything is correct. 2 Membership

LCG 3 Since the Previous Meeting EGI Virtualisation and Clouds Workshop EMI All Hands Meeting, Lund –EMI 1 released just after the May GDB –This was planning for year 2. Database Workshop, CERN, 6-7 June –Tony will summarise

LCG Most months on the second Wednesday Rooms booked Cancel led July due to WLCG Workshop 4 GDB meetings in 2011

LCG World IPV6 Day, 8 th June, all over the world! Identity Management Workshop, CERN, 9-10 June LHCOPN Meeting, Washington, June WLCG Workshop, DESY, th July – =4019http://indico.desy.de/internalPage.py?pageId=1&confId =4019 EGI Technical Forum, Lyon, rd September HEPiX Fall Meeting, Vancouver, October –20 th Anniversary Meeting ISGC, Taipei, 26 February - 2 March 2012 WLCG Workshop, NYC, th May 2012 CHEP2012, NYC, th May Forthcoming Events

LCG The day to try out IPv6. Many web and other services will be supporting IPv6 today Try the tests If they fail, ask your internet supplier why. IPv4 won’t fail but if you try IPv6 you should get through to many services using it. 6 World IPv6 Day

LCG MU Pilot Jobs, SCAS, Argus, gLExec CREAM Virtualisation Installed capacity OPN, LHCONE CVMFS Information Service 7 GDB Issues

LCG GGUS Information Service EGI and the UMD Release Database Workshop glexec Discussions –Security –Job Management Today

LCG ACE the Availability Computation Engine –compared with the previous A&R stats –Good match, deviations as expected Compared different algorithms –OLD ignore CREAM, CE pass if no LCG-CE –AND require both CREAM.AND. LCG-CE at sites where both exist. –OR CE OK if either CREAM or LCG-CE OK –NEW ignore LCG-CE. A&R calculated only from CREAM 9 Availability (reminder)

LCG MB was minded to approve NEW. –But unstable CREAM on GridEngine would be unfair to those sites. May report will be with OR –CREAM on SGE should be fixed by June/July –Expect to move to NEW in October –ALL sites must run CREAM by then or their A&R will be 0. Old SAM database will close end of August –By then all tools which take data feeds must have migrated Results will be accepted up to 7 days late –And availability recalculated 10 Availability

Grid Technology GridView portal based on ACE –Till the time this functionality integrated in MyWLCG –Data transfers, FTS and old GridView availabilities: Excel Report Generation Form – Update on ACE - 11

LCG At the May GDB people asked whether there would be repercussions from a.Availability Reports b.Experiments... If they decommission their LCG-CEs now. a.No b.Alice, CMS, LHCb 12 LCG-CE

LCG At the May GDB there was a report of an instability in CREAM running with GridEngine. Shis was a showstopper for GE sites removing their LCG-Ces soon. CREAM CE to fix the known issues with SGE is coming soon for gLite 3.2. See: The fixes have already been implemented by CESGA as certification. 13 CREAM/GridEngine

LCG Romain Wartel, the WLCG Security Officer will present the WLCG view to the workshop later this week. His slides are ribId=4&resId=0&materialId=slides&confId= ribId=4&resId=0&materialId=slides&confId= Identity Management

LCG 6 Key Usage Scenarios Running a pre-- ‐ defined VM image. Running my VM image (with my data). Deciding which virtualised resource to use. Accounting across resource providers. Reliability/availability of the resource. State change notification from the VM manager. EGI Virtualisation and Clouds Workshop

LCG Introduce virtualised resources alongside current grid ones to increase flexibility while retaining the current federated model. Testbed using existing expertise and resources Technology providers to investigate and test a number of identified technologies Resource providers to set aside resources for testbed and investigations. 16 Conclusions

LCG WLCG Workshop, DESY, th July – &confId=4019http://indico.desy.de/internalPage.py?pageId=1 &confId=4019 Please register if you will be attending. Still a few slots for talks – Volunteer! Discussion encouraged. Talks should be no more than half the timeslot. WLCG Workshop

LCG WLCG has stickers left Available in white on black or black on white, both with coloured logo From the WLCG Office 18 Stickers