Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply.

Slides:



Advertisements
Similar presentations
US Army Corps of Engineers BUILDING STRONG ® State of Tennessee Regional Water Supply Planning Pilot Studies Benjamin L. Rohrbach, P.E. Chief, Hydrology.
Advertisements

Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Presentation Texas Water: What You Should Know November 6, 2010.
Water. ©2008 DOMANI reputation & brand license to operate business continuity why?
© 2014 HDR, Inc., all rights reserved. Catawba-Wateree Water Supply Master Plan.
Chisholm Trail Special Utility District Open House September 19, 2009.
Durham – Where Great Things Happen City of Durham Jordan Lake Allocation Request Presentation to the Jordan Lake Partnership March 21, 2014.
Regional Partnerships for a Sustainable Water Future Britta Strother Water Resource Specialist July 22, 2010.
Coosa North Georgia Regional Water Plan: Goals, Major Resource Issues, Recommendations, and Lessons Learned Doug Baughman.
Colorado Springs’ ASR Program Presented by Cortney Brand Western Water Workshop, Gunnison, CO July 28, 2005.
Bruce Moore, Manager Colorado River Division Southern Nevada Water Authority July 28, 2010.
Martha Davis Inland Empire Utilities Agency April 8, 2010.
Reclaimed Water–A Sustainable Source for Florida’s Growing Water Needs Larry R. Parsons, Ph.D. Citrus Research & Education Center Lake Alfred Liz Felter.
Is there a Drought in Ventura? City Manager’s Report July 16, 2007.
Mid-Range Streamflow Forecasts for River Management in the Puget Sound Region Richard Palmer Matthew Wiley Department of Civil and Environmental Engineering.
Review of the 2009 Snowmelt and Rain Streamflow Forecasts & Snow Survey Advisory Team Ron Abramovich, Hydrologist Water Supply Specialist USDA Natural.
A Preliminary Analysis of the Impacts of Climate Change on the Reliability on West Side Water Supplies Richard Palmer and Margaret Hahn Department of Civil.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
Water Issues In India by Vijay Kumar Eppakayala. India on the globe.
1 Investing in your water … investing in your future California American Water General Rate & Conservation Case Applications.
Seawater Desalination and Water Supply Reliability in Marin County Louis Armstrong, URS Corporation.
Water System Planning Study
OUR URBAN WATER SUPPLY … THE PLAN FOR MEETING OUR FUTURE WATER SUPPLY NEEDS LAWRENCE C. TROPEA, JR., P.E.,DEE EXECUTIVE DIRECTOR RIVANNA WATER & SEWER.
North Fork Shenandoah River Results Application For the State Drought Assessment Plan Jennifer L. Krstolic and Donald C. Hayes.
Future Water Supply - for the Ashley Valley D. Gerard Yates Central Utah Water Conservancy District.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
IRP Approach to Water Supply Alternatives for Duck River Watershed: Presentation to XII TN Water Resources Symposium William W. Wade Energy and Water.
TWCA 2009 Mid-Year Conference Groundwater Regulation Panel.
Financial Impact of Drought March 5, 2008 Updated 3/17/08.
Roseville Drought Response 2014 Ed Kriz Environmental Utilities Director 7 November, 2014.
Water Demands in the Jackson Blue Spring Basin.
What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners.
SOUTH METRO WATER SUPPLY STUDY DECEMBER 2003 Stretching our Water Supplies South Metro Denver Area Gunnison Water Conference July 28, 2004.
Equus Beds ASR Program A Case Study in Success Texas Innovative Water 2010 Seminar October 11, 2010 Texas Innovative Water 2010 Seminar October 11, 2010.
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
Overview of Alabama Power’s Tallapoosa River Operations Martin Dam Relicensing Informational Meeting April 1, 2008 Andy Sheppard, P.E. Project Mgr. - Hydro.
1.Projects 2.Rates 3.Projects and Rates Today’s Presentation:
Evaporation in Texas CE 394K.2 Spring Evaporation In Texas  Evaporation is an important component of the hydrological cycle.  Globally volumes.
Texas Innovation Water 2010 Seawater Desalination What is the benefit to the State from implementing the Brownsville Seawater Demonstration Project?
Maximizing Water Supply Sustainability for the Goleta Valley Ryan Drake Water Supply and Conservation Manager 2015 Central Coast Sustainability Summit.
Geospatial Analysis of the Big Spring, TX Area. Types of Wastewater Reuse Non-Potable Reuse Watering lawns Industrial cooling Indirect Potable Reuse Aquifer.
ERCOT Generation Drought Best Practices Workshop Water Conservation Practices for Texas Generators February 27, 2012.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
EXPANSION OF BRUNSWICK COUNTY’S NORTHWEST WATER TREATMENT PLANT Public Utilities.
Water Supply Planning in Hampton Roads: Options for an Uncertain Future The State of Virginia’s Water Resources October 28, 2015 Whitney S. Katchmark,
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
“Development of Community Water Deficit Index (CWDI) for small to mid-size communities of Southeastern United States” “Development of Community Water Deficit.
Reservoir Development Update Region K Meeting July 11, 2012 Karen Bondy, P.E. Manager of Resource Strategy 1.
High Altitude View of ACF Regional Water Plans.
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
Water Balance for the Lower Colorado River Basin: Impacts of Water Efficiency BRUK BERHANU 11/26/2013.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
Water System Master Plan & Rate Study City of DeKalb, Illinois City Council Presentation May 16, 2015.
Water Advisory Board March 29, Annual rainfall
June 2009: How severe is the current drought in the Hill Country?
Climate Change Threat Drought 1. Potential Impacts from Drought How might our community be impacted by drought? 2.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Southern California Water Dialogue September 23, 2015.
Richland Creek Water Supply Program Briefing
2015 Urban Water Management Plan Overview
Kings Bluff Raw Water System Parallel Raw Water Main Project
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Reservoir Operations and Water Supply Planning at Salt River Project
Department of Water Management Water Supply Update
City of Durham Department of Water Management
June 2009: How severe is the current drought in the Hill Country?
October 29, 2018 Terry Lauritsen, P.E.
Antelope Valley-East Kern Water Agency
Why Potable Reuse in Florida?
Presentation transcript:

Alabama Water Resources Conference Perdido Beach, Alabama Mac Underwood, General Manager BWWB BIRMINGHAM WATER WORKS BOARD Sustainability of Water Supply for the Metro Birmingham Area September 5, 2007

Outline of this Presentation… 1. Existing BWWSB System 2. Management of the 2006/2007 Drought 3. Long Range Water Resource Planning

Outline of this Presentation… 1. Existing BWWSB System 2. Management of the 2006/2007 Drought 3. Long Range Water Resource Planning

We are Among the 40 Largest Water Utilities in the Nation Largest water utility in Alabama Largest water utility in Alabama Supply water to over 650,000 people (approximately 15% of the State of Alabama) Supply water to over 650,000 people (approximately 15% of the State of Alabama) We produce in excess of 100 MGD of drinking water We produce in excess of 100 MGD of drinking water 31 MGD of raw water provided to Industrial customers 31 MGD of raw water provided to Industrial customers

Our Intakes are in the Black Warrior and Cahaba Basins 4 Raw Water Intakes 4 Water Treatment Plants

Our Intakes are in the Black Warrior and Cahaba Basins Reliable Withdrawal is 176 MGD Average Day Demand is 134 MGD MGD to Treatment Plants - 31 MGD to Industry (raw water customers) Cahaba River Pump Station Source Capacity Appears Adequate through 2023 or 2035 (Depending on Future Service Area)

The Board has 4 Water Filtration Plants Total Treatment Capacity is 179 MGD Max Day Historical Demand is 167 MGD Shades Mountain 80 MGD Western 55 MGD Putnam 24 MGD Carson 20 MGD Treatment Capacity Adequate through 2010

Outline of this Presentation… 1. Existing BWWSB System 2. Management of the 2006/2007 Drought 3. Long Range Water Resource Planning

2006/2007 has been a Near-Record Drought!

Our 2007 Rainfall Deficit is 18 Inches!

We are in Stage 3 of our Drought Management Plan Stage 1: (April 10th) Stage 2: (May 10th) Stage 3: (June 7th) Stage 3 Highlights Mandatory Restrictions 2-tiered surcharge above 12 CCF per month Hand watering only (2 days per week) No watering on Wednesday, Saturday, Sunday

Our Inland Lake Reservoir is Approximately 67% Full

Our Lake Purdy Reservoir is Also Approximately 67% Full

We Manage Each of our Sources Conjunctively 4 Raw Water Intakes 4 Water Treatment Plants

Our Ability To Do So This Year has Been Hampered by Bromide Levels in the Warrior River

On October 27, 2006 ADEM Notified us That Jasper’s Consecutive Systems were Experiencing DBP Problems… The source of the problem was an industrial discharge into the Riley Maze Treatment Plant in Arab Alabama. The source of the problem was an industrial discharge into the Riley Maze Treatment Plant in Arab Alabama. We had to shut down our Mulberry Intake until the issue was resolved in late May. We had to shut down our Mulberry Intake until the issue was resolved in late May. This significantly impacted our ability to control lake levels as the drought developed this spring! This significantly impacted our ability to control lake levels as the drought developed this spring!

Our Challenges Are to Manage the Reservoir Levels in the Face of the Extended Forecast!

“This all adds Impetus to our Long- Range Water Resource Planning”

Outline of this Presentation… 1. Existing BWWSB System 2. Management of the 2006/2007 Drought 3. Long Range Water Resource Planning

Projected Population Change Service Population is projected to grow between 43% and 63% by 2075!

2005 – 2075 RPCI Population Projections (Adjusted) for Existing and Potential Future Service Areas

Existing and Potential Future Service Areas

Existing and Potential Service Area Total Average Daily Demand

Future Supply Shortfall for Both Service Area Scenarios

“BWWSB plans to augment its supply by up to 50 MGD by 2025!”

Finding and Implementing Solutions

Potential Water Supply Alternatives New Source in the Black Warrior Basin New Source in the Tennessee River Basin New Source in the Coosa River Basin New Source in the Black Belt Groundwater Local Quarries Aquifer Storage and Recovery Water Reuse / Recycling – for Industrial Customers Increased Capacity at Lake Purdy Conservation

Questions?