PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy.

Slides:



Advertisements
Similar presentations
BAL-002-WECC-1 Contingency Reserves
Advertisements

BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Proposal on Ancillary Service Deliverability Requirements QMWG January 6, 2012.
Don Blackburn Vice Chair
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
ERCOT VRT Study, Phase I ERCOT ROS Meeting December 10, 2009.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
ORDC Phase 2 Analysis Summary Wholesale Market Subcommittee March 4, 2015 David Thompson.
NERC LTRA Update / CDR Capacity Counting Issues
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
March 30, 2015 SCED Event Follow up: Proposed Improvements QMWG, May 08, 2015.
PDCWG Report to ROS August 12, 2010 Sydney Niemeyer.
RTWG Report to TAC August 5, 2010 Howard Daniels.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Demand Side Working Group Load Resource Performance Subgroup April 9, 2010 Mary Anne Brelinsky EDF Trading North America.
BAL-001-TRE-1 Primary Frequency Response in the ERCOT Region
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
NPRR 097 DSR and Small Capacity / Low Operating Level Issues for Compliance Monitoring.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
Overview of Revised Ancillary Services (AS) Framework Proposal
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Analysis of ERCOT Regulation Service Deployments during 2011 David Maggio Market Enhancement Task Force Meeting 3/29/
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
1 PDCWG Report to ROS October 13, 2011 Sydney Niemeyer.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Outstanding Issues & Action Items 1.Obligations to Honor Ancillary Services Commitments 2.Variable ERCOT Bias 3.Sign reversals of the Regulation Signal.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
QMWG Report to WMS S. Looney April 9, NPRRs Assigned to QMWG NPRR595, RRS Load Treatment in ORDC – Provides ORDC payment for non-controllable Load.
Resource Parameters Needed for LFC NATF WebEx Meeting 05/11/2010 Dave Maggio Operations Engineer, Supply Integration and Grid Applications.
PDCWG 8/25/2015 GTBD Bias Analysis ERCOT Market Analysis and Design PDCWG August 25, 2015.
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
PDCWG Report to ROS Sydney Niemeyer Chair NRG Energy Don Blackburn Vice Chair Luminant Energy.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
PDCWG Report to ROS March 11, 2010 Sydney Niemeyer.
Improving Primary Frequency Response Bob Green PDCWG August 3, 2011.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
Responsive Reserve Service Deliverability Review September 15,
Frequency Control Task Force Presentation to the ERCOT Technical Advisory Committee June 1, 2006.
Document number Anticipated Impacts for FRRS Pilot Program ERCOT TAC Meeting September 7, 2012.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
ROS Report Bill Hatfield 2014 ROS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public June 26, 2014 TAC Meeting.
A Broad Review of August 13, 2015 and Similar Historical Situations Luminant Energy January 22, 2016.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
1 Compliance Update April Control Performance Highlights  NERC CPS1 Performance Performance further declined in March  March performance comparison.
Preliminary Report on ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 12th, 2013.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) June 13, 2012 WMS and June 14, 2012 ROS.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) PDCWG April 26, 2013.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
PDCWG Report to ROS October 16, 2008 Bob Green PDCWG Chair Garland Power & Light.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Congestion Management and Ramp Rate for Delivering Ancillary Services
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Reflecting Losses in DR within ERCOT August 22, 2012
Presentation transcript:

PDCWG Report to ROS David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy

May Meetings Met May 29 & 30, 2013 –May 29 – Joint & open meeting with QMWG re NPRR 524 & 527 –May 30 – Regular closed meeting. 28 members representing 16 companies as well as ERCOT & TRE. System oscillations SCR update FRRS data review NPRR update NPRR 527 – update Event reviews Frequency Control Report May 2013

System Oscillations - update Member reported that PSS tuning is working to protect generator PSS tuning SME reported that oscillations are still occurring –PSS only fixes symptom, not problem PMU data is still desired Action Requested: –ERCOT will look back at 2002 study as starting point for dynamic study –Request RPG be given action to review study and results

SCR Update Early look at the data (five days) Some indications that SCR 773 may be successful Dataset is too small to draw any conclusions

FRRS update ERCOT presented analysis PDCWG provided feedback Consensus was that the response seems to impact frequency as expected No consensus on how to “fit” in current market design

ERCOT methodology for determining FRRS capacity

Questions for PDCWG Can it be regulation? –Yes it can, depending on how the Resource allocates its obligation and the performance to the deployments. –FRRS can qualify for regulation AS and be evaluated by PDCWG via GREDP metric –Example: FRRS Resource with 60MW capacity can serve a 1MW obligation over 60 minutes. –FRRS Resources may want to follow the LFC regulation signal that Generation Resources follow to allow for pilot to be evaluated for regulation service. Current deployment signal is separate from regulation signal Should it be regulation? –Maybe not. The quality of response has a higher quality closer to primary frequency response. –Responsive reserve may be a better fit. How does this improve reliability? –Seems to improve frequency decay during frequency event –Frequency nadir is raised. How much? –TBD – more of an economic question, QMWG? How much regulation can ERCOT stand to be offset by FRRS? –Current participation (33MW up & 33MW down) levels are expected to be acceptable –Maximum amount provided should not exceed “ 65MW up & 35MW down” –Not a 1:1 equivalence of capacity between conventional generators and FRRS resources Proposed Changes to deployment? –Proportional control –Reserve for unit trips as opposed to frequency control

NPRR 524 PDCWG & QMWG 5/29/13

Summary NPRR524 considered in joint meeting of PDCWG & QMWG on 5/29/13 Language and comments were considered All issues raised in the group were understood by NPRR author Author plans to submit comments to incorporate the changes proposed by this group

Generator Specific Fundamentals Allocation & Awards Currently up to 24% of the HSL can be awarded RRS Proposal for the first 20% of the HSL of the Generation Resource is required to be frequency responsive The remaining 4% of the HSL can be carried as non-frequency responsive and must meet any subsequent deployments within 10 minutes

ERCOT Specific Fundamentals 2800MW RRS obligation –Frequency Responsive LR = 1400MW to 0MW –83% Frequency Responsive Generation = 1162MW to 2324MW –17% Non Frequency Responsive = 238MW to 476MW Possibly use portfolio based percentages. 83% of award has PFR & 17% of award will not have PFR. –Not feasible in ERCOT systems (EMS) –Can you carry all of the nonPFR MW on a single generator?

Identified Risks Risk of not passing BAL003. If this is the case, ERCOT would reduce maximum percentage of RRS capacity on a single resource from 24% to 20% (or what is deemed appropriate to pass standard) No mechanism to allocate RRS to differentiate what capacity is frequency responsive. –NPRR 527

Qualification & Deployment 10 minute is a definite requirement for non frequency responsive capacity serving Responsive Reserve How will the deployment work? (NPRR 429 problem) –Some technology can provide the power augmentation via AGC & follow SCED When changes are made to provide non frequency responsive capacity to market, RARF is updated to reflect the changes. –Qualification of new capacity may or may not be required by ERCOT (issue not addressed)

Testing Impact Referring to Governor testing and test submissions via NDCRC application –HSL changes may be an issue in the application

Market Policy Separation of services by value –Fast PFR –PFR –REG –RRS – GEN –RRS – LR –RRS – PA

NPRR 527 PDCWG & QMWG 5/29/13 PDCWG 5/30/13

NPRR 527 Collaborated with QMWG Solution was agreed upon Currently drafting comment language Request to table NPRR527 for 1 month to allow PDCWG time to complete and submit comments. (Vote)

Event Review PDCWG Reviewed 3 events loss of 522MW Combined cycles with duct firing capacity did not provide PFR. Regulation was nearly exhausted high frequency Generators in startup or transitions on combined cycles were noted as main driver based on the given dataset (repeat from last month) Seems that the online units are not dispatched down to make room for the generation that is coming online loss of 820MW Combined cycles with duct firing capacity did not provide PFR.

ERCOT Frequency Control Report Sydney Niemeyer NRG Energy June 4, 2013

May Daily Time Error Change

Time Correction History

ERCOT Primary Frequency Response – BAL Bias and Frequency Response Measure

Focus for 2013 Formal & documented review/report of frequency responsiveness for Power Augmentation on Combined Cycle Resources (train not individual unit) Review regulation/GTBD deployment effectiveness (SCR 773) Study the impact of HSL/basepoint/generation deviation on compliance and reliability Responsive Reserve requirements, qualification vs. compliance. (10min vs. 16 second) Standardized/consistent metrics for PFR analysis (BAL001-TRE). Standardized/reasonable expectations for extreme events (2750MW or larger lost) – driven by NERC. No performance required for nonpayment (freq. resp AS) ERS impact review with appropriate ERCOT group. Target Q PMU data understanding of implications Pilot of fast frequency response – characterize & create evaluation process. Work on realistic measurement of combined cycles

Questions?