Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, 20011 Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

Stephen Gibson, ATLAS Offline Alignment, 2 nd July Incorporating FSI with the Offline Alignment Overview ATLAS Group, University of Oxford Stephen.
S. M. Gibson, IWAA7 November ATLAS Group, University of Oxford, UK S. M. Gibson, P. A. Coe, A. Mitra, D. F. Howell, R. B. Nickerson Geodetic Grids.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
Hardware activity at SX5 including detector alignment for the next three years Valery Andreev UCLA October 9-10, 2006 UCLA DOE review, task L.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Warsaw University LiCAS Linear Collider Alignment & Survey IWAA08, G. Moss 1 The LiCAS LSM System First measurements from the Laser Straightness.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
1 CMS Tracker Alignment and Implications for Physics Performance Nhan Tran Johns Hopkins University CMS Collaboration SPLIT
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
MUON_EDR-06 (Alignment) Enrique Calvo Alamillo February 28-March 1, 2002 Link Mechanics: Status.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
GE alignment- status, proposal N. Béni, Z.Szillási (ATOMKI, Debrecen, HU) G. Bencze, G. Endrőczi (Wigner RCP, Budapest, HU) GMM meeting 1.
1 James N. Bellinger University of Wisconsin-Madison CMS Week June 2010 Coordination: Things to do Coordination: James N. Bellinger CMS week 2010.
Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech.
LHCC - May THE CMS ALIGNMENT SYSTEM Alignment scheme Task of the align. system Monitor the position of the  -chambers and the CT detectors with.
Irakli Chakaberia Final Examination April 28, 2014.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
Workshop on B/Tau Physics, Helsinki V. Karim ä ki, HIP 1 Software Alignment of the CMS Tracker V. Karimäki / HIP V. Karimäki / HIP Workshop.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Partial Disassembly of the alignment devices on each ME11transfer plate, ME1/1 chamber and ME1/2 chamber. (6 on +Z and 6 on –Z side of the CMS)
Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
TRT Offline Software DOE Visit, August 21 st 2008 Outline: oTRT Commissioning oTRT Offline Software Activities oTRT Alignment oTRT Efficiency and Noise.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
CMS Torino meeting, 4 th June, 2007 R. Castello on behalf of Torino Tracker’s group Tracker Alignment with MillePede.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
Simulation of the CMS Endcap Alignment Scheme Using COCOA.
Samir Guragain, Marcus Hohlmann Florida Institute of Technology, Melbourne, FL Z′ Mass Reach MC Analysis USCMS meeting Brown University May 6 – 8, 2010.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
Chris Parkes, Silvia Borghi, Christoph Hombach WP2 Alignment Task: Status Report Introduction Alignment Monitoring – LHCb VELO Weak Modes – LHCb VELO AIDA.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
THE H8 TEST STAND Conceptual Design Mechanical supports Status of preparation Project schedule 1 (Brandeis, CERN, MPI, Seattle - presented by Sandro Palestini)
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
1 James N. Bellinger 26-Feb-2008 DCOPS DAQ Control Main DAQ Runs on Linux Data directly to Oracle Controlled via DIM Errors presented via DIM PVSS component.
1 James N. Bellinger University of Wisconsin-Madison 30 January 2008 DCOPS Software Report.
ATLAS The ConditionDB is accessed by the offline reconstruction framework (ATHENA). COOLCOnditions Objects for LHC The interface is provided by COOL (COnditions.
PACMAN : technical objectives Hélène Mainaud Durand.
1 James N. Bellinger University of Wisconsin-Madison 19-Feb-2010 Status of Transfer Line Reconstruction James N. Bellinger 19-February-2010.
Iterative local  2 alignment algorithm for the ATLAS Pixel detector Tobias Göttfert IMPRS young scientists workshop 17 th July 2006.
1 GSI, Darmstadt Goethe Universität Frankfurt Ph.D Committee meeting 16 th of August 2011 Grzegorz Kalicy Development and Test of a Prototype for the PANDA.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
University of Wisconsin at Madison
Muon Alignment: Organization
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
University of Wisconsin-Madison
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
Starting from the Basics
University of Wisconsin-Madison
University of Wisconsin-Madison
CMS Week Muon Alignment
Plans for the 2004 CSC Beam Test
Presentation transcript:

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, June - Sept 2000 at CERN ISR Tunnel Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy, L302 & L303) 1 Transfer Line (Single Laser, L301) 1 Transfer Plate Analog Sensors (Temp, Proximity) ISR Prototype System Test ISR Prototype System Test

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, ISR Prototype System Test Data: Events Reconstructed 3 Test Periods (July, Aug, Sept 2000) Test DAQ ( custom programmed, C++, Window98, using 3 serial ports 1.SLM line DCOPS sensors, 2.Transfer line DCOPS sensors, 3.Agilent34970A for analog sensors and laser on/off control. No DSP centroid finding for this test. Each pixcel was read out. Analysis Software: Flap (First Level Analysis Program) written in C++: find centroid of each DCOPS sensor, and do the first level analysis (stability of the laser centroids, etc.) CMS Object oriented Code for Optical Alignment (COCOA) is used to reconstruct positions of DCOPS sensors

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, ISR Test Layout

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, ISR Test Geometry Sensor locations for et2, et3, and es10 are given by the photogrammetry survey es9 was used due to survey errors in es10 Transfer plate geometry was fixed by machining Sensors et1 es1 were located on the transfer plate Provides link between Transfer and SLM lines Rotations of sensors are known within error limits of photogrammetry

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Comments on ISR Test Uncertainties: Estimated Survey Errors 60  m local  120  m global Errors in COCOA Reconstruction 220  m Systematic Errors  < 15  m Statistical Errors (1500 Events) General Remarks Good reconstruction requires all 4 CCDs on MABS and Transfer Plate SLM sensors 3 CCDs required for all other sensors Reconstruction is roughly independent of laser direction Reconstruction is independent of laser motions Laser ‘Jumps’ Do Not Affect Us

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, ISR Test Reconstruction Final ISR Results of COCOA reconstruction for July/August and September runs using es9 as the final reference sensor

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, ISR Results Final Results : System  = 130  m Typical Reconstructions within 300  m of expected survey location Sensors outside 300  m range have understood errors

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, COCOA Simulation Goals Create Model CMS EMU Alignment System DCOPS + Analog Sensors Integrate with Link and Barrel alignment Evaluate Intrinsic System Errors Chamber construction System design Evaluate System Performance Intrinsic Resolution Correlation of System Components Effects from component failure Provide ‘First Draft’ of Reconstruction Software Integration of Results into General Physics Simulation

Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Current Status (May 2001) (Robert Lee) Substantial Software Improvements Extraction of Component Data from Endcap Muon Production Drawings (Complete) SLM Lines and Endcap CSC Stations have been modeled COCOA Simulation ME2/3/4 COCOA ModelSimulated COCOA SLM Line