DOCUMENT SUBMITTED TO: TIA TSSC, UPED and TC The document to which this cover statement is attached is submitted to a Formulating Group or sub-element.

Slides:



Advertisements
Similar presentations
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi / Stephen Berger Chair / Vice-Chair
Advertisements

Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Standards and Certification Training Module B – Process B5Consensus Process for Standards Development ASME S&C Training Module B5 Consensus Process for.
TIA Engineering Manual 6 th Edition Preview and Overview.
TIA Electronic Tools Standards Development Susan Hoyler Director, Standards Development and Promotion GSC/EWG Meeting Sydney, Australia November 2001.
Data Center Global Telecommunications Cabling Standards Landscape and Latest Developments Jonathan Jew - J&M Consultants, Inc. Chair TIA TR-42.6 Telecom.
Activity in TIA TR-42 Bob Jensen TR-42 Chair. TR-42 Responsibility Premises Telecommunications Cabling Standards All Optical Fiber Standards.
Activity in TIA TR-42 Bob Jensen TR-42 Chair. TR-42 Responsibility Premises Telecommunications Cabling Standards All Optical Fiber Standards.
MODULE B - PROCESS SUBMODULES B1.Organizational Structure B2.Standards Development: Roles and Responsibilities B3.Conformity Assessment: Roles and Responsibilities.
ASME C&S Training Module B5 MODULE B - PROCESS SUBMODULES B1. Organizational Structure B2. Standards Development: Roles and Responsibilities B3. Conformity.
Annex J Single-designation of Documents. Action Item (TSSC, Apr. 24) Single Designation Numbering and Annex J – Herb reported that the original Annex.
1 TR41Chairs’ Training Presented by: Billie Zidek-Conner Manager, Standards Secretariat Services Susan Hoyler Director, Standards Development and Promotion.
1 TIA Engineering Committees - Policies and Procedures TIA Staff.
January 2008 T. M. Kurihara, Chair, IEEE P1609Slide 1 doc: IEEE p Submission IEEE DSRC Application Services (P1609) Status Report.
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP m-session-62-closing-report Title: m Session #62 Closing Report Date Submitted:
Standards Report FOLS Meeting – February Overview TIA TR-42 update LAN application update.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All TIA’s Activities in the Areas of ICT and the Environment Anil Kripalani Chair Emerging Technologies.
ISO/IEC JTC1 SC25 WG3 Review for WG1 October 01, 2013 Kista, Sweden ISO/IEC SC25 WG1, Kista1 SC25 WG1 N1637.
TIA TECHNICAL COMMITTEE (Contribution Number) Title: UPED Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen.
TR L Virtual meeting August 23,, 2013 The document to which this cover statement is attached is submitted to a Formulating Group or sub-element.
TC Chair Training Cynthia Gage TAC Training Coordinator June 2014.
MembershipPolicy Standards EnvironmentNetworkingIntelligence 1 = Constituents Pillars Priorities Activities TIA Framework.
Kentucky Work Ready Communities Recertification Recertification updates Extension requests.
DOCUMENT SUBMITTED TO: TIA TSSC, UPED and TC The document to which this cover statement is attached is submitted to a Formulating Group or sub-element.
Submitting Your IEEE Standards Project for Approval Consideration RevCom Presentation PE/IC Meeting 9 November 2009 Prepared by Moira Patterson.
OVERVIEW OF ENGINEERING MANUAL, Part 1 Susan Hoyler TIA, Director Standards Development and Promotion.
ANSI/TIA-568-C Generic Telecommunications Cabling APPROVED: FEBRUARY 2, 2009 This template can be used as a starter file for presenting training.
1 S2ESC Quality Management Planning Group John Walz Quality Management Planning Group Chair P730 Vice-Chair S2ESC ExCom 30-Jul-08 Melbourne, FL.
Doc.: IEEE /169r0 Submission December 1999 Ian Gifford, M/A-COM & Tom Siep, TISlide 1 IEEE P Working Group for Wireless Personal Area Networks.
Session # TGn Opening Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE n-11/0019 Date Submitted:
TIA TECHNICAL COMMITTEE UPED Title: UPED Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #21, Big Island Closing Plenary Date Submitted: September, 2007.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #21, San Francisco Closing Plenary Date Submitted: July, 2007 Presented.
UPED Title: Update of Activities within TR-42, User-Premises Telecommunications Infrastructure NameBob Jensen CompanyFluke Networks Address9015 Mountain.
Marianna Kramarikova Dallas, TX - February 2014 The document to which this cover statement is attached is submitted to a Formulating.
*****Please review TIA Standards Development Procedures (ECOP) Optional Disclosure on Submission Cover – when required Source can add optional.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #17, Dallas Closing Plenary Date Submitted: November, 2006 Presented.
DOCUMENT SUBMITTED TO: TR-41 Meeting The document to which this cover statement is attached is submitted to a Formulating Group or sub-element thereof.
Q: How do I view and upload a document? First, Login to NTREIS Transactions First, Login to NTREIS Transactions.
7-Sep-07 Project NumberPN Rv1 Document TitleIEEE STIT’s Proposal on revising ITU-T P.79 SourceK. Allen Woo, Plantronics, Inc. Contact Name:K. Allen.
IEEE MEDIA INDEPENDENT HANDOVER DCN: REVP m-session-63-closing-report Title: m Session #63 Closing Report Date Submitted:
Electronic Tools for TIA Standards Development David Thompson Member of the Technical Staff GCS/EWG Meeting Sapporo, Hokkaido, JAPAN August 2000 TC
DOCUMENT SUBMITTED TO: TSSC and TC The document to which this cover statement is attached is submitted to a Formulating Group or sub-element thereof of.
Bluetooth™-IEEE Working Group and IEEE P Working Group for WPANs Liaison Meeting Ian Gifford P Vice Chairman December 8, 1999.
Session # Maintenance Task Group Closing Plenary Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE maint-09/0009.
February 24, 2004 TR-45 Lawfully Authorized Electronic Surveillance (LAES) Packet Solutions Industry Meeting March 19 th, 2004 Terri L. Brooks Chair TR-45.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.
February 21, 2001TR CFR PART 68 – pre R&O Refers to the document published by the FCC Contains the following sub-parts –Subpart A –Subpart.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Melbourne Closing Plenary Date Submitted: September, 2006 Presented at.
Doc.: IEEE Submission July 2006 Ho-In Jeon, Kyung-Won UniversitySlide 1 NOTE: Update all red fields replacing with your information;
ISO/IEC JTC 1/SC 7 Working Group 42 - Architecture Johan Bendz
TIA’s Activities in the Areas of ICT and the Environment
Summary of issues and results from GSC-12 IPR WG
DOCUMENT SUBMITTED TO: TSSC and TC
Jim Matthews Standards Engineering Director Corning Incorporated
TTC Activities on IPR in Standards
API RP 17A - Discussion Points
TIA Liaison Report to IEEE
Cheryl Blum VP, Technology and Standards TIA
July 2006 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: ISO/IEC JTC1 SC6 Liaison Report Date Submitted:
IEEE MEDIA INDEPENDENT HANDOVER
nd Vice Chair’s Report – Mar 2012
Stephen R Whitesell TR-41 Chair VTech Communications
Steve Shellhammer Chair
LMSC Policy and Procedures Update
TIA TR-50 M2M-Smart Device Communications
IEEE P Wireless RANs Date:
TGn Closing Report – July ‘06
IEEE MEDIA INDEPENDENT HANDOVER
Presentation transcript:

DOCUMENT SUBMITTED TO: TIA TSSC, UPED and TC The document to which this cover statement is attached is submitted to a Formulating Group or sub-element thereof of the Telecommunications Industry Association (TIA) in accordance with the provisions of Sections inclusive of the TIA Engineering Manual dated March 2005, all of which provisions are hereby incorporated by reference. SOURCE:Tyco Electronics CONTACT:Herbert V. Congdon II, PE 3704 County Home Road Conover, NC Ph: Fx: E: TITLE:TR-42, User Premises Telecommunications Cabling Infrastructure, Report PROJECT NUMBER (PN):None DISTRIBUTION:TIA TSSC, TC and UPED INTENDED PURPOSE OF DOCUMENT: ___FOR INCORPORATION INTO TIA PUBLICATION _X_FOR INFORMATION ___OTHER (Please describe) _________________________________ ABSTRACT: This report is a summary of recent activities in the TR-42 Formulating Committee Telecommunications Industry Association (TIA) (Contribution #) Baltimore, MD, USA May 2, 2006

TIA TR-42 User Premises Telecommunications Cabling Infrastructure Herb Congdon, Chair Bob Jensen, Vice-chair

Published Standards Standards –ANSI/TIA-942 Data Center Cabling (April 2005) –TIA-569-B Pathways and Spaces (Oct 2004) –ANSI/TIA-758-A Customer-owned OSP (May 2004)

Published Standards Addenda –568-B.1-7 Array Connector (MPO) Polarity (Jan 2006) –568-B.2-9 Category 6 Balance Reqt’s (yet to publish) –568-B.2-11 Increased Diameter for Cable (Dec 2005)

Published Documents TSBs –TSB-162 Cabling for Wireless Access Points (Mar 2006) –TSB-140 Field Fiber Testing (Feb 2004)

Work in Progress Addendum 10 to ANSI/TIA-568-B.2, Augmented Category 6 TSB155, Additional Guidelines For 4-pair 100 Ω Category 6 Cabling For 10GBASE-T Applications TIA-1005 for Industrial Cabling –Coordinating work in ISO and IEC Coaxial Cabling requirements –Addendum initiated for coax in residential –TSB initiated for coax in data centers

Work in Progress 568-B.1-6 –DC Power on Cabling TSB on Healthcare Facility Cabling –Expected to become a standard

Work Progress 568-C Series –Three-part series to become 4-part series –568-C.0, Generic cabling (for designers) –568-C.1, Commercial cabling (for designers) –568-C.2, Copper cabling (for manufacturers) –568-C.3, Optical Fiber Cabling (for manufacturers)

TR-42 Initiatives Operational Guide Updates –Reaching consensus Strive for consensus in development a must during ballot Editorial or Adding TBD: >50% Technical and Administrative: >2/3rds –Document revision cycle Revise standard prior to 4th addendum –Ballot close dates to synchronize with ANSI close dates

TR-42 Initiatives Titles and Scopes revised Ballots can be done off-line with upload of Word Document (Ballot comment sheet) TR-42 Updates continue at BICSI –8 hour sessions at major BICSI events

TR-42 Wish List Electronic rosters for sign-in at meeting –Quorum call & tracking attendance –Ease of incorporating database into meeting reports –Hotel room nights An FTP site that works Status of Staff Responsibilities

Other Notes Tendency for some members to file issues directly with TIA executives –Often before attempts to resolve at Plenary level –Would prefer to address issues in Plenary first