Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Machine operator priorities for Linac 2 and 3 G Bellodi, BE-ABP-HSL G Bellodi, BI- BOSS-2 meeting, 10 June 2015.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Strategy for SPS 200 MHz LLRF upgrade (1)  Each of the four cavities (2x 5 sections, 2x 4 sections):  1-T Feedback (loop around cavity and amplifier)
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
B.O.S.S. SPS ring and transfer lines Serge Massot for BE-OP-SPS European Organisation for Nuclear Research CERN CH-1211 Genève 23 Switzerland 27/05/2014CERN.
Linac4 FBCT’s 18/ L4 BI BCT review Lars Søby On the behalf of: M. Andersen, D. Belohrad, L. Jensen, Franco Lenardon and J. C. Allica Santamaria.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
STATUS REPORT: ALIGNMENT OF COLLIMATORS P. BESTMANN /O. ABERLE Collimation Working Group 26/09/2011.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
The Quadrupole Pick-up in the CPS -intro and progress report PPC 3 Dec 1999 A. Jansson.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
Next Steps, Priorities, Strategy for Spares Ray Veness.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
BI Activities for LS2 Ray Veness for BE-BI.
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Instrumentation and Tools for LIU and HL-LHC B. Mikulec with the invaluable input from many colleagues from ABP, OP, RF and BI HL-LHC/LIU Day 15 th of.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
K.Hanke / TDR Meeting / 13 June 2006 Linac 4 Diagnostics L4: K. Hanke, M.Pasini (requirements, specifications, integration) AB/BI: U.Raich et al. (technical.
Commissioning of the PSB with Linac4 K.Hanke / CERN Review on PS Booster with Linac4 CERN, January 15-16, 2009.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Challenges in Beam Instrumentation Rhodri Jones (BE/BI) LIU-2011 Event, 25 November 2011, CERN.
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
E. Benedetto, 24/04/14, LIU-PSB Meeting, MDs planning for 2014 MDs planning for 2014 E. Benedetto Thanks: G. Rumolo, B. Mikulec and the RF, OP, ABP, BI.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
Agenda 1 BOSS Meeting - 27/5/ : :10 Introduction and aims of the workshop 10‘ 09: :25 Priorities from OP for PSB and transfer lines 15'
INJECTORS BLM SYSTEM: PROGRESS REPORT Christos Zamantzas on behalf of the BLM team. MSWG 28/08/2015.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
G Bellodi - L4BCC meeting – 26/05/ /05/2011 G Bellodi - L4BCC - meeting BE/ABP Setting requirements & specifications Coordination (G Bellodi) OP.
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
LIU Day 2014 – M.Bodendorfer - LEIR model. LEIR model A plan for understanding/upgrading the LEIR performance limitations M.Bodendorfer BE/ABP & LEIR.
Status of the BI Work Package in the LIU-PSB frame
Experience with beam instrumentation at Linac4
J.-L. Sanchez Alvarez(PSB-EIC)
LIU Wire Scanner Milestones June 2017
Automatic emittance measurement in the CERN 1.4 GeV Booster
BE-BI Software for LINAC4
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Status of the BI Work Package in the LIU-PSB frame
WPs concerned by L4 connection:
Acknowledgments: LIU-PT members and deputies, H. Bartosik
Summary of week 7 Hardware Commissioning:
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
SPS Transverse Damper System
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin

Scope BOSS mini-workshop 27/05/  Overview of beam instruments  Installed in PSB injection line (BI line)  Installed in PSB rings (BR)  Installed in PSB extraction lines (BT, BTP, BTM, BTY)  Operational/development/obsolete  Criticality  Other issues  Beam instrumentation to be installed for the PSB upgrade (LIU-PSB) not mentioned here

PSB Injection BOSS mini-workshop 27/05/  Splitting into 4 PSB rings downstream of BI.SMV10  (synoptics still to be updated for naming changes…)  LT+LTB lines are under Linac2 responsibility

BI (PSB Injection) Line BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BPMs12operationalCritical for operation (beam steering) New BPMs installed during LS1 BLMs6operationalCritical for operation (loss control) ACEMs  to be replaced by LHC- type ICs (LS2) BCTs5operationalCritical for operation (loss control, Vistar, OP display, statistics) New electronics (TRIC); rewinding for BI.BCT10/20 to be compatible with Linac4 BTVs4operationalCritical for setting up All instruments except BLMs are declared in layout DB.

PSB Rings BOSS mini-workshop 27/05/  Only sections 7-11 (out of 16 PSB sections) are shown here as example…

PSB Rings – Pickups BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BRr.BPMiL3 (i=1…16) 4x16operationalCritical for operation (orbit correction, radial loop, measurement of optic parameters) Turn-by-turn electronics renovation to be finalized BRr.BPTF4L54x1operationalCritical for operation (transverse feedback) RF-related BRr.BPP1L5/5L1 /8L1/11L2/14L4 4x5operationalCritical for operation (phase pickup) RF-related BRr.BPMT3L14x1operationalCritical for performance* (tune measurement) BRr.BPM7L24x1For MDsNot critical for operationHalf-turn pickup BRr.UQD3L11For MDsQuadrupolar pickup; not critical for operation Name should be changed…; no remote readout All instruments are declared in layout DB. r=1…4 (PSB ring number) * Critical for performance: PSB could operate without the instrument for a limited time.

PSB Rings – Intensity/Current BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BRr.BCTDC9L14x1operationalCritical for operation Vistar, Samplers, OP display, Statistics, LHC beam quality check, Beamscope BRr.BCTF8L14x1operationalCritical for performance (fast beam intensity) OASIS BRr.BCTI8L14x1Installed, but not yet operational Critical for operation from LS2 (intermediate beam intensity) Will be used with Linac4 (injection watchdog); new electronics BRr.BCW8L14x1operationalCritical for operation (longitudinal profile measurement for bunch shape measurement, tomoscope) RF-related. Vacuum leak during LS1. All instruments are declared in layout DB. r=1…4 (PSB ring number)

PSB Rings – Other Instruments BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BRr.BWS.2L1 (wire scanners) 4x2operationalCritical for operation (Profile + Emittance measurement) (only 1 transv. emittance meas. instrument per ring/plane!) Calibrated spares have to be available; MDs to be repeated to validate performance. LHC beam quality check. BR.BTV15L11operationalCritical for setting up BLMs16x2 operationalCritical for operation (beam loss) ACEMs + LHC-type ICs (new!) in parallel; loss studies to be done this run, but electronics not yet available! ACEMs to be replaced during LS2. BR3.MSF1L1 (SEM fil) 1obsoleteWill be removed during LS2. All instruments except BLMs are declared in layout DB. r=1…4 (PSB ring number)

BT Line BOSS mini-workshop 27/05/  Complex recombination 4  2  1 ring…

BT (PSB Transfer) Line BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BPMs10operationalCritical for operation (beam steering) New BPMs; difficult geometry (tilts, offsets) BLMs7operationalCritical for operation (loss control, interlocks) ACEMs  to be replaced by LHC- type ICs (LS2) BCTs1operationalCritical for operation (loss control, Vistar, OP display, statistics) New BCT (+TRIC) BTVs5operationalCritical for setting up All instruments except BLMs are declared in layout DB.

BTP Line BOSS mini-workshop 27/05/  Wall between PSB and PS tunnels

BTP (PSB Transfer to PS) Line BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BPMs4operationalCritical for operation (beam steering) New BPMs BLMs2operationalCritical for operation (loss control, interlocks) ACEMs  to be replaced by LHC- type ICs (LS2) BCTs1operationalCritical for operation (loss control, Vistar, OP display, statistics) New BCT (+TRIC) BTVs1operationalCritical for setting up All instruments are declared in layout DB.

BTM Line BOSS mini-workshop 27/05/  PSB measurement line (emittance measurement) and PSB dump.

BTM (PSB to Measurement) Line BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BPMs2operationalCritical for operation (beam steering) New BPMs BLMs3operationalCritical for operation (loss control, interlocks) ACEMs  to be replaced by LHC- type ICs (LS2) BCTs1operationalCritical for operation (loss control, Vistar, OP display, statistics) Old BCT (+TRIC) SEM grids3operationalCritical for operation (profile + emittance measurement) Renovated electronics. Cross- check with BWS. BTVs3operationalCritical for setting up All instruments are declared in layout DB.

BTY Line BOSS mini-workshop 27/05/  Splitting into ISOLDE GPS and ISOLDE HRS targets at the end.

BTY (PSB to ISOLDE) Line BOSS mini-workshop 27/05/ InstrumentsNumber Installed StatusUsageComments BPMs4operationalCritical for operation (beam steering) New BPMs BLMs9operationalCritical for operation (loss control, interlocks, beam steering at high intensity) ACEMs  to be replaced by LHC- type ICs (LS2) BCTs4operationalCritical for operation (loss control, GPS/HRS watchdogs, OP display, statistics) New BCTs (+TRIC) SEM grids3operationalCritical for Isolde setting up (profile + beam alignment on target) Several setups per month. Renovated electronics. BTVs5operationalCritical for setting up The BTY line is not yet declared in the layout DB.

Instrument Summary BOSS mini-workshop 27/05/ InstrumentsTotal # installed SetupPerformanceOperationMDObsolete BPMs BLMs91 BCTs24420 BTVs19 BWS88 SEM grids633 Others

Conclusions 278 BI equipment currently installed in PSB complex (187 without BLMs) Practically all installed instruments in the PSB are critical for operation. Many instrument modifications (equipment + electronics + software) during LS1. New instruments for LS2. Instruments in layout DB except for BTY line and certain BLMs; will follow Optics have been updated Positions are currently being corrected in layout DB GEODE will be updated with new names BOSS mini-workshop 27/05/

Beam off BRr.BCTDC9L1: beam intensity in the rings; also used for ISOLDE+EAST beams intensity interlock BRr.BCW8L1: essential for bunch synchronisation BRr.BPTF4L5: no high intensity beams in case of failure BPMs in extraction lines: failure of 1 can be worked around short-term, but need to compensate with others (recombination and bunch spacing) BCTs in extraction lines: failure of 1 can be worked around short-term, but need to compensate with others BLMs in extraction lines: could probably live a few days with one broken (would need to be removed from interlock!) BOSS mini-workshop 27/05/