1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status 2004-2005 plan nm-project collaboration & plan ATF review 6/17/2004.

Slides:



Advertisements
Similar presentations
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
Advertisements

Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
1 ATF Status LCPAC K.KUBO Introduction Emittance Single bunch and multi-bunch in DR Extracted beam Wiggler study Other experiment, Instrumentation.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF DR Overview Introduction Low emittance history Present status S.Kuroda ( KEK ) GDE Review 3rd Apr.2013.
Special Lecture- ATF The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK ILC School at KEK History and Machine.
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Results on recent technology developments at ATF - Beam extraction study by a Fast Kicker - N. Terunuma, KEK LER11, Heraklion, Crete, Greece, 2011/Oct/5.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
ATF2 project in the ATF international collaboration, including coordination issues Junji Urakawa, KEK ATF2-IN2P3-KEK kick-off meeting Annecy, LAPP, for.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
Linear Collider For Japan-US HEP Program Committee May, 2003 Nobu Toge (KEK, Accelerator Lab)
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF Fast Ion Study Plan N.Terunuma (KEK) Results in 2007, 2008 Vertical emittance studies at ATF Plan.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
1 Fast kicker study Machine Time 2011/10/18~10/29(2 weeks) TB meeting 2011/01/14 T.Naito.
ATF Damping Ring in 2010 autumn Multibunch instability study Measurement (S. Kuroda, T. Naito and K. Kubo) and Calculation of ion trapping (Kubo)
Welcome and the ATF2 international collaboration in future 1.Introduction 2.Mission of ATF/ATF2 3.Organization of ATF/ATF2 4.International Collaboration.
ATF status M. Ross October 15, 2004 The ATF is the largest test facility built exclusively for linear collider RD –Utility not reduced by the selection.
2016/3/31 Fast kicker Experiment at ATF ATF2 - 40nm beam production, measurement Extraction kicker The difficulty of the beam extraction is that the kick.
Japan-US Collaboration /3/7 Japan-US Collaboration /3/7 Fast kicker development The beam extraction design from DR to the extraction line and.
Non-EC R&D KEK Junji Urakawa at INFN. Discussing issues : 1. Experimental confirmation for the threshold of Fast ion instability Need clear data.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
1 Experiments with pulse supplies and strip-lines at ATF, Plans for fast extraction kicker for ATF2 1. Fast Kicker R&D at ATF 2. Instrumentation at ATF.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Beam plan at STF phase1 12/6/2005 TTC-WG3 H. Hayano STF phase1 1st step : DC-gun + photo-cathode (2006) quick beam source( DC gun exist), no pre-acceleration,
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
V.Shiltsev 1 Comments on What Kind of Test Facility(ies) the ILC Needs Vladimir Shiltsev/ Fermilab.
Two-beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
Expected hardware status and Priority of the commissioning task
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Auxiliary Positron Source
CLIC Damping ring beam transfer systems
Test of Optical Stochastic Cooling in CESR
Fast Ion Experiments at ATF
Junji Urakawa (KEK) for ATF International Collaboration
ATF Intrabeam Scattering Results
Strip-line Kicker R&D at KEK-ATF
Junji Urakawa ( for collaborators ) March KEK at LNF
CLIC damping rings working plan towards the CDR
Instability measurement plans at ATF
N. Terunuma (KEK) ILC2010, Beijing, March 29th, /2/28.
Presentation transcript:

1 H. Hayano ATF Status June/2004 H. Hayano ATF: emittance status beam study status plan nm-project collaboration & plan ATF review 6/17/2004

2 Single bunch Transverse Emittance by Laser wire X emittance determined by Ring Design. Measured data points are fit to simulation. Y emittance =6.5pm at GLC intensity, is below GLC design.

3 High quality multibunch beam from RF-gun Cathode block with CsTe coating Beam Intensity: ~1x10 10 /bunch Normalized Emittance:  y = 4 ~ 7 x10 -6 rad.m Bunch length:  z= 3 ~ 6 ps Q.E. of CsTe cathode: 16% initial, ~ 1% with RF ON & keep constant over few weeks

4 Multibunch Vertical Emittance by Laser wire Projected Y emittance is around 1% from X, However, twice much from GLC Design. Blowup at tail bunch is seen.

5 Preliminary result of Fast Ion Instability simulation Behavior of Y emittance is very similar. Schematic of the Fast-Beam Ion Instability simulation

6 DR vacuum pressure Low emittance was observed at DR pressure < 4 x10 -7 Pa Emittance growth observed with vacuum pressure > 4 x10 -7 Pa, even small bunch charge. 20 bunch, 1 train = 52mA ~15 A.hour (ex. 150mA.100hours)

7 DR scrubbing status GLC intensity: 20 bunch, 1 train = 52mA: 3 train = 156mA ~5.5 A.hour 45 hours 150mA EXT kicker pressure dominant 6/12/2004 ~ 6/14/2004

8 Extraction Kicker detail

9 Multibunch Vertical Emittance after 5.5 A.hours scrubbing Projected Y emittance is around 1% from X, However, insufficient tuning of Y emittance.

10 Multibunch Vertical Emittance after 5.5 A.hours scrubbing No big tail rise was seen, However, insufficient tuning of Y emittance. Scrubbing seems to be effective

11 Recent Beam studies in ATF Polarized Positron study FEATHER study RF-gun study ODR study SR study( interference, streak, longitudinal osc.) XSR study LW study X-band cavity BPM study SLAC nm-BPM study SLAC ring-BPM study QMUL FONT study

12 Other Developments in ATF Wiggler study Correction coil for residual kick is preparing. Damping time and emittance will be tested in fall-run. X-Y coupling at extraction Multi-pole component of kicker and septum is under study. KEK nm-BPM study 3 set of new C-band cavity BPM with laser based active stabilization. fabrication is now under way. S-band detuned structure study Basic study of new detuned method is now under way. Fast sweep LW at EXT plan (UK) Fast sweep over multibunch scan is now under planning.

13 FEATHER stripline Kicker FEATHER BPM Fast feedback control study for collision feedback FEATHER(KEK), FONT(UK) Collision feedback

14 ODR( Optical Diffraction Radiation ) beam size monitor Achieved resolution ~10µm

15 Beam image (x:39µm, y:7.3µm) X-ray SR beam size monitor Achieved resolution ~6µm

16 Cavity BPM nm resolution study LLNL Design mover, Improved electronics, installed Mar Achieved resolution 90nm

17 KEK nm-BPM study 3 cavity BPM system 1 cavity BPM almost finished. 2 more will be in September. 1 mover stage done. 2 more under fabrication. Active mover & nm sensor are preparing. Reference monitor & optical anchor is under study.

18 ATF Plans for MB emittance study Y emittance will be confirmed by Laser Wire after scrubbing. Longitudinal oscillation is studied now. Wiggler study Damping time and emittance will be confirmed with wiggler ON. Extraction of low emittance beam multi-pole component of kicker and septum are under study. nm resolution BPM test & demonstration Development of new precise mover & new cavity-BPM electronics(SLAC). KEK version of cavity BPM and active mover development are under way. combination of two system for study of active stabilization. Fast feedback test & demonstration Basic test of feedforward and feedback are under way. Stable beam extraction is essential. Fast feedback test by 3 train extraction will be done. Instrumentation developments LW, XSR monitor, ODR monitor, MB-BPM, (SB, MB) longitudinal feedback, etc.

19 Plan : nm-project at ATF