October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger.

Slides:



Advertisements
Similar presentations
3D Sensor Processing - IBL G. Darbo – INFN / Genova Venezia, 4 June 2009 o IBL per Marzio G. Darbo - INFN / Genova Agenda page:
Advertisements

IBL Insertable B-Layer
HFT Technical Overview September 26, HFT 2013 TPC FGT 2011 STAR Detectors Fast and Full azimuthal particle identification EMC+EEMC+FMS (-1 ≤ 
IBL interim-MoU Annexes G. Darbo – INFN / Genova PEIB, 1 March 2010 o IBL interim-MoU Annexes Pixel Extended Institution Board CERN, March 1 st, 2010 NCP.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
ATLAS POH.P, G.D12/5/2009 IBL Update H. Pernegger, G. Darbo (PO 12/5/09) Organization and WG coordinator Schedule Decision Items Organization Tools & Meetings.
D. Lissauer, BNL. 1 ATLAS ID Upgrade Scope R&D Plans for ATLAS Tracker First thoughts on Schedule and Cost.
13 Dec. 2007Switched Capacitor DCDC Update --- M. Garcia-Sciveres1 Pixel integrated stave concepts Valencia 2007 SLHC workshop.
IBL Slides G. Darbo – INFN / Genova CSN1, 22 November 2010 o IBL Spare Slides Commissione I – 22 Nov 2010 G. Darbo - INFN / Genova.
Towards a TDR for the IBL G. Darbo - INFN / Genova AW, 24 February 2009 o Towards a TDR for the IBL ATLAS Upgrade Week CERN, 24 February 2009 Session:
ALICE ITS Coordination Board 16 July 2013 L. Musa 1.
The ATLAS Insertable B-Layer (IBL) Project C. Gemme, INFN Genova On behalf of the ATLAS IBL COllaboration RD11 Firenze July 2011.
IBL MoU G. Darbo – INFN / Genova 24 April 2010 o IBL MoU ATLAS Upgrade Week DESY, April 24 th 2010 M. Nordberg, M. Nessi, C. Gößling, H. Pernegger Presented.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
DOE/NSF Review of the U.S. ATLAS Construction Project June 3-4, 2002 WBS 1.1 Silicon Subsystem Abe Seiden UC Santa Cruz.
IBL Project Status G. Darbo – INFN / Genova AW, 9 October 2009 o Insertable B-layer Project Status ATLAS Week Barcelona, October, G. Darbo - INFN.
IBL Status, TDR & MoU G. Darbo – INFN / Genova ATLAS Week, 26 February 2010 o IBL Status, TDR & MOU ATLAS Week CERN, February 26, 2010 G. Darbo - INFN.
IBL MoU G. Darbo – INFN / Genova 17 April 2010 o IBL MoU Contribution prepared for Marzio’s talk at April RRB G. Darbo - INFN / Genova.
R&D status of FPCCD VTX and its cooling system Yasuhiro Sugimoto for FPCCD VTX group 1.
ATLAS Preparations for LHC Phase-I Upgrade G. Darbo – INFN / Genova ATLAS Week, 8 July 2009 o ATLAS Preparations for LHC Phase-I Upgrade ATLAS Week CERN,
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
SLHC SG: ATLAS Pixel G. Darbo - INFN / Genova SLHC SG, July 2004 ATLAS Pixel at SLHC G. Darbo - INFN / Genova Talk overview: A table with different High.
1 H. Pernegger/CERNVertex 2011 ATLAS Insertable B-Layer Overview Vertex 2011 Rust, Austria H. Pernegger / CERN on behalf of the ATLAS IBL collaboration.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese U.S. ATLAS Review Revised Version November 29, 2000.
Update on ATLAS IBL G. Darbo – INFN / Genova LHCC, 22 September 2009 o Update on ATLAS insertable B-layer LHCC Upgrade session CERN, September, 22 nd 2009.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
U.S. Deliverables Cost and Schedule Summary M. G. D. Gilchriese Revised Version December 18, 2000.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
ATLAS FP TRACKER PLANS Steve Watts School of Physics and Astronomy University of Manchester Well defined design in the FP420 Design Report Based on the.
Communications G. Darbo – INFN / Genova IBL MB#15, 5 October 2009 o Bump Bonding Selex / INFN Roma, October, 30 th 2009 G. Darbo - INFN / Genova.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
ATLAS micromegas activities (MAMMA)
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
IBL - Opening G. Darbo - INFN / Genova AW, 25 February 2009 o IBL Introduction & Project Organization ATLAS Upgrade Week CERN, 25 February 2009 Session:
Trends and synergies in solid state tracking R&D Executive Summary of the session Frank Hartmann.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
IBL Kick-off Meeting – Summary & Issues G. Darbo – INFN / Genova UPO, 21 July 2009 o IBL kick off meeting summary and issues ATLAS Upgrade Project Office.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
3D sensors for tracking detectors: present and future applications C. Gemme (INFN Genova) Vertex 2013, Lake Starnberg, Germany, September 2013 Outline:
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
15/09/20111 ATLAS IBL sensor qualification Jens Weingarten for the ATLAS IBL Collaboration (2 nd Institute Of Physics, Georg-August-Universität Göttingen)
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
ATLAS Upgrade Plans ATLAS Hardware – Challenges and Opportunities Norwegian CERN “Town Meeting” Bergen
Activité LPNHE en 2012 et 2013 G.Calderini Tracker upgrade.
1 Heinz Pernegger / LHCC 16/11/10 IBL TDR : Questions and Answers H. Pernegger / CERN on behalf of the IBL collaboration.
IBL TDR G. Darbo / INFN Genova ATLAS CB – October 2010 o TDR of Insertable B-layer ATLAS CB, October 8 th 2010 G. Darbo / INFN - Genova Indico agenda page:
Leonardo Rossi – EB 68 – Oct 5, Pixel status and schedule Rad-hard electronics (has always been) on the critical path for the construction of the.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IBL Progress D. Ferrère for the IBL community LHCC Upgrade Session – June 14 th 2011 Detailed progress was reported at the IBL General meeting, June 8-10.
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
ATLAS Italia – IBL G. Darbo – INFN / Genova CERN, 2 March 2011 o IBL ATLAS Italia / Referee CERN, March 2 nd 2010 G. Darbo – C. Meroni INFN / GE – MI Agenda:
Atlas Upgrade week - November 15 th, 2011M. Raymond – CERN/PH-ADO-PO 1 Introduction Many activities are planned to be performed during the shut down
The ATLAS IBL Project – 5 th Trento Workshop G. Darbo – INFN / Genova Manchester, February 2010 o The ATLAS IBL Project The 5 th "Trento" Workshop.
The ATLAS Insertable B-Layer Detector (IBL) F. Hügging on behalf of the ATLAS IBL collaboration Pixel th International Workshop on Semiconductor.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
ATLAS Pixel Upgrade G. Darbo - INFN / Genova LHCC- CERN 1/76/2008 o Pixel/B-layer Developments LHCC Upgrade Session CERN, 1 / 7 / 2008 G. Darbo - INFN.
Manchester, 24/02/2010 G.-F. Dalla Betta The common floor-plan of the ATLAS IBL 3D sensor prototypes Gian-Franco Dalla Betta (Univ. Trento and INFN) for.
IBL project for DT Science-Techno Tea
IBL Technical Aspects H. Pernegger / CERN.
FBK / INFN Roma, November , 17th 2009 G. Darbo - INFN / Genova
IBL Overview Darren Leung ~ 8/15/2013 ~ UW B305.
Hybrid Pixel R&D and Interconnect Technologies
WG4 – Progress report R. Santoro and A. Tauro.
Communications Share Point Collaborative WS:
Update on ATLAS insertable B-layer
Presentation transcript:

October RRB G. Darbo & H. Pernegger RRB – October 2010 o October RRB Slides for Marzio’s RRB talk CERN, October, 11 th 2010 G. Darbo & H. Pernegger

October RRB G. Darbo & H. Pernegger RRB – October Material from Raphael/Neal The Insertable B-Layer (IBL) is a fourth layer added to the present Pixel detector between a new beam pipe and the current inner Pixel layer (B-layer). IST IBL Support Tube Alignment wires PP1 Collar IBL Detector IBL Staves Sealing service ring IBL key Specs / Params 14 staves, = mm CO 2 cooling, T < 0.2 W/cm 2 X/X 0 < 1.5 % (B-layer is 2.7 %) 50 µm x 250 µm pixels 1.8º overlap in ϕ, <2% gaps in Z 32/16 single/double FE-I4 modules per stave Radiation tolerance 5x10 15 n eq /cm 2 IBL key Specs / Params 14 staves, = mm CO 2 cooling, T < 0.2 W/cm 2 X/X 0 < 1.5 % (B-layer is 2.7 %) 50 µm x 250 µm pixels 1.8º overlap in ϕ, <2% gaps in Z 32/16 single/double FE-I4 modules per stave Radiation tolerance 5x10 15 n eq /cm 2

October RRB G. Darbo & H. Pernegger RRB – October IBL Layout Beam-pipe reduction: Inner R: 29  25 mm Very tight clearance: “Hermetic” to straight tracks in Φ (1.8º overlap) No overlap in Z: minimize gap between sensor active area. Material budget: IBL Layer (with IST): 1.5 % of X 0 Other Pixel layers: ~2.7 % of X 0 Beam-pipe (BP) extracted by cutting the flange on one side and sliding (guiding tube inside). IBL Support Tube (IST) inserted. IBL with smaller BP inserted in the IST

October RRB G. Darbo & H. Pernegger RRB – October IBL Technical Design Report ATLAS TDR includes: Overview and motivation for the project Study of the physics performance Technical description of the project with baseline and options for critical issues Three sensor technologies. Beam-pipe, extraction/insertion, installation, ALARA. Organization of the project and resources Editorial team: M. Capeans (technical editor), G. Darbo, K. Einsweiller, M. Elsing, T. Flick, M. Garcia-Sciveres, C. Gemme, H. Pernegger, O. Rohne and R. Vuillermet. Approved by the ATLAS Collaboration Board (October 2010 ATLAS Week) 43 Institutions and 300 people in IBL CERN-LHCC , ATLAS TDR 19

October RRB G. Darbo & H. Pernegger RRB – October Physics Performance b-tagging performance crucial for: New Physics (3 rd generation !) observation of H → bb through boosted WH production Main conclusions of IBL performance Task Force: performance at 2x10 34 with IBL is equal to or better than present ATLAS without pile-up w/o IBL and 10% B-layer inefficiency: b-tagging ~ 3 times worse at 2x10 34 than today b-tagging with pile-up & inefficiencies b-tagging with pile-up 2 jets of 500 GeV event with 2 x pile-up Same event w/o pile-up IBL IBL Physics & Performance Task Force – M. Elsing et al.

October RRB G. Darbo & H. Pernegger RRB – October The New Front-end Chip (FE-I4) FE-I3 (Pixel) FE-I4 (IBL) 80 columns 336 rows 19 mm 20.2 mm 60 KGD / Wafer

October RRB G. Darbo & H. Pernegger RRB – October Sensor Technologies for IBL Planar sensors (3 producers) slim edge n-in-n & n-in-p require the lowest temperature and high bias voltage. have very well understood manufacturing sources, mechanical properties, relatively low cost, and high yield. ATLAS Pixel FE-I3 diamond module IBL FE-I4 diamond sensors Thin n-in-p Planar Sensor 3D Sensor 450 µm n-in-n slim edge IBL layout 3D column 11 µm 3D sensors (3 producers) Active edge, single/double side require the lowest bias voltage, intermediate operating temperature, and achieve the highest acceptance due to active edges. their manufacturability with high yield and good uniformity must be demonstrated. Diamond sensors (2 producers) polycrystalline CVD (pCVD) require the least cooling and have similar bias voltage requirements to planar sensors. their manufacturability with high yield, moderate cost, and good uniformity must all be demonstrated. Selection in summer 2011 Three candidate sensor technologies address the IBL requirements with different trade-offs: Prototyping with FE-I4 – qualification with irradiation (5x10 15 n eq /cm 2 ) and test beam – production yield

October RRB G. Darbo & H. Pernegger RRB – October SPARE SLIDES

October RRB G. Darbo & H. Pernegger RRB – October History of IBL Project - Time Line 1998: Pixel TDR B-layer designed to be substituted every 3 years of nominal LHC (300 fb -1 ): due to then available radiation hard sensor and electronic technologies. 2002: B-layer replacement became part of ATLAS planning and was put into the M&O budget to RRB. 2008: B-layer taskforce B-layer replacement cannot be done – Engineering changes to fulfil delayed on- detector electronics (FE-I3, MCC) made it impossible even in a long shut down. Best (only viable) solution: “make a new smaller radius B-layer insertion using technology being developed for HL-LHC prototypes”. This became the IBL. 2009: ATLAS started IBL project: February: endorsed IBL PL and TC April: IBL organization in place (Endorsed by the ATLAS EB) 2010: TDR and interim-MoU TDR is under approval in ATLAS Interim-MoU is collecting last signatures.

October RRB G. Darbo & H. Pernegger RRB – October Interim-MoU - Institutions There are 43 institutions in the IBL project Large interest for the sensor (22 Institutions) Full effort and funding requirements are covered 300 people have expressed their interest to contribute to the project many have already started to work. In most cases institutes contribute with money where also there is contribution with manpower.

October RRB G. Darbo & H. Pernegger RRB – October Management Board (MB) Module WG (2 cordinators) FE-I4 Sensors Bump-Bonding Modules Procurement & QC Irradiation & Test Beam Module WG (2 cordinators) FE-I4 Sensors Bump-Bonding Modules Procurement & QC Irradiation & Test Beam Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave TM HDI (Flex Hybrid) Internal services Loaded stave Procurement & QC Stave WG (1 Phys + 1 Eng.) Staves Cooling Design & Stave TM HDI (Flex Hybrid) Internal services Loaded stave Procurement & QC Integration & Installation WG (2 Eng.) Stave Integration Global Supports BP procurement Ext. services inst. BP extraction IBL+BP Installation Cooling Plant Integration & Installation WG (2 Eng.) Stave Integration Global Supports BP procurement Ext. services inst. BP extraction IBL+BP Installation Cooling Plant Off-detector (1 Phys + 1 E.Eng.) BOC/ROD Power chain & PP2 DCS & interlocks Opto-link Ext. serv.design/proc. Procurement & QC System Test Off-detector (1 Phys + 1 E.Eng.) BOC/ROD Power chain & PP2 DCS & interlocks Opto-link Ext. serv.design/proc. Procurement & QC System Test IBL Management Board (MB) Membership: IBL PL + IBL TC 2 cordinators from each WG Plus “extra” members IBL Management Board (MB) Membership: IBL PL + IBL TC 2 cordinators from each WG Plus “extra” members MB ad-interim membership IBL Project Leader: G. Darbo IBL Technical Coordinator: H. Pernegger “Module” WG (2 Physicists): F. Hügging & M. Garcia- Sciveres “Stave” WG (1 Phy. + 1 M.E.): O. Rohne + D. Giugni “IBL Assembly & Installation” WG (2 M.E. initially, a Phy. Later): F. Cadoux + R. Vuillermet “Off-detector” WG (1 Phy. + 1 E.E.): T. Flick + S. Débieux “Extra” members: IBL/Pixel “liaison”: Off-line SW: A. Andreazza, DAQ: P. Morettini, DCS: S. Kersten Ex officio: Upgrade Coordinator (N. Hessey), PO Chair (M. Nessi), Pixel PL (B. Di Girolamo), ID PL (P. Wells), IB Chair (C. Gößling)

October RRB G. Darbo & H. Pernegger RRB – October FE-I4 Table FE-I3FE-I4 Pixel size [µm 2 ]50x40050x250 Pixel array18x16080x336 Chip size [mm 2 ]7.6x x19.0 No. of transistors [millions]3.587 Active fraction74%89% Analog/digital current [µA/pix]26 / 1710 / 10 Digital current [µA/pix]1710 Analog/digital voltage [V]1.6 / / 1.2