Www.salga.org.za Portfolio Committee on Energy Briefing on the Approach to Distribution Asset Management (ADAM) Pilot Project 01 November 2013.

Slides:



Advertisements
Similar presentations
Tips and Resources IASC Cluster/Sector Leadership Training
Advertisements

Derek Taylor Nelson Mandela Metropolitan University Port Elizabeth South Africa.
THE DEVELOPMENT BANK OF SOUTHERN AFRICA
Review Municipal Infrastructure Grant Policy Framework Review
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
AMEU Legal and Statutory Committee Meeting SALGA/Eskom Partnering Agreement for Electricity Distribution 12 November 2014.
1 SOUTH AFRICA’S BUCKET ERADICATION PROGRAMME WISA AFRICA Iris Lebepe DWAF 22 November 2007.
OUTCOMES AND STRATEGIC ISSUES FROM THE MCC WSLG 19 November
1 Alignment to the Local Government Turn Around Strategy (LGTAS)
Professional Development in INTOSAI – a whitepaper Jan van Schalkwyk (SAI SA) INTOSAI Capacity Building Committee - Meeting in Lima, Peru 9-11 September.
Africa's Accelerated Industrial Development Action Plan “AIDA” AFRICAN UNION COMMISSION Department of Trade and Industry By Hussein Hassan Hussein Head.
DEPARTMENT OF COOPERATIVE GOVERNANCE AND TRADITIONAL AFFAIRS PRESENTATION TO THE PORTFOLIO COMMITTEE Municipal Infrastructure Grant (MIG) Projects and.
1 FINANCING PRESSURES OF A DISTRICT MUNICIPALITY SALGA NATIONAL MEETING WITH MUNICIPAL MANAGERS 28 FEBRUARY 2011 Cacadu DM Municipal Manager Ted Pillay.
Inputs to the Budget Vote 20 Sport and Recreation South Africa Presentation to the Portfolio Committee on Sport and Recreation 01 JULY.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
GHANA Developing CSA within the National Agriculture Sector Investment Plan while reinforcing inter-sectoral consistency: progress, bottlenecks and support.
1 UPDATE ON THE PILOT APPROACH TO DISTRIBUTION ASSET MANAGEMENT (ADAM) Mr. Goodman Nxumalo Energy Programmes and Projects 01 November 2013.
NATIONAL WASTE MANAGEMENT STRATEGY PRESENTATION TO PARLIAMENT- SALGA’S INPUT ON THE STRATEGY.
CENTLEC (SOC) LTD (Addressing EDI Service Delivery Challenges) Centlec Delegation (SOC) LTD Joint Hearing between PC on Energy & PC on Cooperative Governance.
PRESENTATION TO THE ROAD PAVEMENT FORUM 09 November 2010 Progress & Update since the Road Construction & Maintenance Summit.
1Confidential and Not for Publication PROGRESS ON DELIVERY AGREEMENT FOR OUTCOME 8: SUSTAINABLE HUMAN SETTLEMENTS AND IMPROVED QUALITY OF HOUSEHOLD LIFE.
1 Presentation By: Mr.O. Aphane Acting Deputy Director General: Electricity, Nuclear and Clean Energy (on behalf of the Director General, Ms N Magubane)
Briefing on Progress made with regard to Prevention and Management of Child Abuse and Neglect Especially Child Sexual Abuse Presentation at the Portfolio.
PACIFIC AID EFFECTIVENESS PRINCIPLES. Purpose of Presentation Provide an overview of Pacific Principles on Aid Effectiveness Provide an overview of Pacific.
STREAM 1B: SECTOR STRUCTURAL AND RESTRUCTURING ISSUES CLLR C JOHNSON, SALGA NEC ELECTRICITY DISTRIBUTION MAINTENANCE SUMMIT 9 JUNE 2008.
Institutional structures for Structural Funds assistance Ministry of Finance September 10, 2003.
April_2010 Partnering initiatives at country level Proposed partnering process to build a national stop tuberculosis (TB) partnership.
1 PRESENTATION TO PORTFOLIO COMMITTEE ON ENERGY ON MUNICIPAL ENERGY EFFICIENCY PROGRAMMES 31 January 2013 Linda Manyuchi Technical Specialist:
Presentation to the Portfolio Committee on Public Service and Administration 14 September Human Resource Development Council for South Africa (HRDCSA)
Municipal Infrastructure Support Agent ____________________________________________________ Contribution of the Municipal Infrastructure Support Agent.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
“The rural water voice - Learning through sharing for sustainable rural water services management” 11/15/2015Prepared by: DWSMF1.
DCoG Presentation to the Appropriations Committee HEARINGS ON THE MEDIUM TERM BUDGET POLICY STATEMENT 2 November 2010.
Portfolio Committee on Energy Update on the 2013/14 NERSA determinations on Municipal Tariffs 30 July 2013.
Presentation of the Property Rates Debt to the Port Folio Committee on Cooperative Governance & Traditional Affairs 25 October 2011 Presented by: Cathy.
OECD Water Programme Pillar 1, Output 1 “Pricing Water Resources and Water & Sanitation Services” World Water Week Stockholm, August 2008.
Municipal Infrastructure Support Agent ____________________________________________________ The Approach to Distribution Asset Management (ADAM) Briefing.
DBSA SUPPORT TO LOCAL GOVERMNENT Ben Mokheseng Manager: Infrastructure Finance Local Government SA Financing Division.
1 PRESENTATION TO THE PORTFOLIO COMMITTEE ON THE OVERVIEW OF THE NDPW PRESENTED BY THE TOP MANAGEMENT COMMITTEE 26 MAY 2004.
INTERACTIVE TRAINING ON IDP FOR COUNCILLORS ________________________
Sport Infrastructure Grant. Pre-2004 there was a national grant for municipal sports infrastructure managed by SRSA This funding was incorporated into.
1 Consolidated Municipal Infrastructure (CMIP) and Municipal Infrastructure Grant (MIG) DPLG PRESENTATION TO THE PORTFOLIO COMMITTEE ON LOCAL GOVERNMENT.
Issues from the CDM Institutional Reviews CDM Dialogue, Barbados March 2006 Ian C King Project Manager, UNDP CRMI.
1 Response to Financial and Fiscal Commission Submission for The Division of Revenue 2010/2011 Presentation to Select Committee on Finance 06 August 2009.
DCOG’s Comments regarding underperformance of Rural Household Infrastructure Grant Standing Committee on Appropriations Friday, 17 August 2012.
Integrated National Electrification Programme (INEP): Overall Performance (End of January 2012) Dr Wolsey Barnard.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
PROVINCIAL INFRASTRUCTURE GRANT NCOP 06 March 2006.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION Portfolio Committee on Water Affairs and Forestry 22 June 2005 V.227.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
Presentation to the Portfolio Committee on Provincial & Local Government Branch: Free Basic Services and Infrastructure Mr Yusuf Patel 19 ~ 20 February.
The Association of Municipal Electricity Undertakings (Southern Africa) Experiences and views of the AMEU on the EDI and related issues Michael J Rhode.
"Learning and achievements of SWA Global platform and its relevance to achieving Hygiene and Sanitation Development in India" India WASH Summit 17 th February.
INSTITUTIONAL REFORM OF WATER SERVICES PROVISION
Presentation to the Portfolio Committee on Energy
Municipal Water Infrastructure Grant (MWIG)
Donor Coordination Process
ELECTRICITY DISTRIBUTION INDUSTRY DECISION
RESTRUCTURING OF THE ELECTRICITY DISTRIBUTION INDUSTRY
PRESENTATION TO THE PORTFOLIO COMMITTEE
SALGA Comments on LG Grants Division of Revenue Bill, 2011
Presentation by Department: Water Affairs 22 March 2011
Portfolio Committee On Sports and Recreation 7 November 2017
FFC Briefing to the Portfolio Committee on Energy
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
PROGRAMME 3 WATER SERVICES
Progress on the Bucket Eradication Programme
The Electricity Distribution Industry
SALGA Comments on the 2011 MTBPS Standing Committee on Appropriations
Presentation transcript:

Portfolio Committee on Energy Briefing on the Approach to Distribution Asset Management (ADAM) Pilot Project 01 November 2013

Presentation Content 1.Background 2.Infrastructure Maintenance and Development 3.Factoring the Approach to Distribution Asset Management (ADAM) Programme 4.The Role of SALGA on the ADAM Programme 5.Progress to Date 6.Skills and Capacity Development 7.Action Plan in Addressing Municipal Challenges 8.Conclusion

Background  When municipalities were established and assumed responsibility for various municipal infrastructure services functions, they inherited old infrastructure some of which was way overdue for replacement. In some cases was already more than 30 years old.  This required huge investments in refurbishment of infrastructure. –In a sense municipalities inherited a liability rather an asset because by taking up these functions, they accepted a huge responsibility of replacing and refurbishing old infrastructure that was associated with the function. –The Electricity Distribution Industry (EDI) developed a significant backlog over the last couple of years in terms of electricity distribution related asset maintenance, refurbishment and strengthening.

Background (Cont…)  In December 2010, Cabinet approved the termination of the Regional Electricity Distributors (REDs) creation project, with a mandate to rather focus on resolving the regulatory problems afflicting the sector, including lack of investment in infrastructure, financial sustainability and poor service delivery.  This mandate was given to the Department of Energy (at the beginning of April 2011 this function formally became the DoE’s responsibility) –No budget allocation was made in the 11/12 financial year.

Infrastructure Maintenance and Development  During the long period of uncertainty regarding future ownership of distribution assets, there has been a significant underinvestment in infrastructure. – Some municipalities were reluctant to invest in infrastructure in a situation where there was no certainty regarding the future of such investment.  This added to inherited maintenance backlogs that also accumulated as a result of the country’s prioritization of extension of infrastructure to the unserved rather than focusing on maintaining infrastructure that served a minority. –A study done by Electricity Distribution Industry Holdings (EDIH) in 2008 estimated the maintenance, refurbishment and strengthening backlog in the EDI (Eskom and Municipalities) to be at a total of about R32 bil and growing at an alarming rate of R2.5 bil per annum 5

Infrastructure Maintenance and Development (Cont…)  The deteriorating state of the electricity distribution infrastructure is one of SALGA’s serious concerns as it negatively affects service delivery at local level. –Given this concern SALGA will continue to rigorously work with the Department of Energy, NERSA, Eskom and other key stakeholders to ensure investment in electricity distribution infrastructure coupled with maintenance and refurbishment.  The 2011 SALGA National Conference resolved to lobby for the: - –Establishment of a National Municipal Infrastructure Refurbishment Fund that will provide for the rehabilitation of municipal infrastructure at the required scale (This fund should be used to leverage private sector investment). –Establishment of national Geographic Information System (GIS) based databases and national programmes to collect data and manage information on an on-going basis on the state of infrastructure. 6

Factoring the Approach to Distribution Asset Management (ADAM) Programme  In November 2012 the DoE took the ADAM principle for decision to Cabinet for approval. Cabinet approved the following with regard to ADAM: - –Noted the Electricity Distribution Asset Management (ADAM) Turnaround Programme; –Agreed that the funding plan for the Electricity Distribution Asset Management Turnaround Programme be finalised as a matter of urgency; and –Agreed that the governance structure of the programme be clarified and that it be continuously aligned with the work of the Presidential Infrastructure Coordinating Commission (PICC) and relevant Strategic Integrated Projects (SIPs) to ensure better coordination and implementation.

Factoring the Approach to Distribution Asset Management (ADAM) Programme (Cont…)  The DoE initiated the development of a strategy to implement the Approach to Distribution Asset Management (ADAM) programme. –ADAM can be defined as a multi-year service delivery improvement initiative targeted at addressing maintenance, refurbishment and strengthening electricity network backlogs. –The multi phased “Approach to Distribution Asset Management” (ADAM) programme is aimed at dealing with EDI challenges and address maintenance backlogs, refurbishment and upgrading of the Electricity Distribution networks. –The initial work done on implementing ADAM focused on the Capital and Skills Shortages that existed in the EDI in general, hence the process will have to be conducted in phases.

The Role of SALGA on the ADAM Programme  SALGA is part of the newly established multi-stakeholder Mini Approach to Distribution Asset Management (ADAM) Steering Committee (MASC) chaired by the DoE, and will continue to lobby for a strategy to address municipal refurbishment challenges.  SALGA therefore, welcomes and supports the launch of the Approach to Distribution Asset Management (ADAM) project that has been launched in line with Strategic Integrated Projects (SIPs) 6 and 10 of the Presidential Infrastructure Coordinating Commission’s (PICCs) National Infrastructure Plan.  As part of the MASC, together with the DoE and other stakeholders SALGA is jointly responsible for the business issues associated with the Mini Adam project. –Approving budgetary strategy, Defining and realising benefits, and Monitoring risks, quality and timeliness. 9

Progress to Date  In the 1 st phase of the Mini ADAM” project, about 9 Municipal distributors were identified to receive assistance.  The majority of these municipal distributors didn’t have the resources (finance and human) to identify and develop high level electricity master plans in terms of normalizing their networks.  The “mini ADAM” phases primarily focuses on the most vulnerable municipal distributors to receive technical analysis assistance and to ensure funding for initial upgrading projects. –It needs to be emphasized that ADAM is not a “grant funding” to upgrade networks. It is a holistic process to ensure that shortcomings are clearly understood, addressed, managed and monitored by a multi-stakeholder Steering Committee.

Progress to Date (Cont…)  The total Approach to Distribution Asset Management (ADAM) pilot project budget for 2013/14 for 7 local municipalities (including 2 Metros ) is R320 million which was allocated as follows: - –NB: No further funding has been allocated in the next financial years for the ADAM programme 11 MunicipalityTotal ('000) King Sabata Dalindyebo LM (Umthatha) (EC) R Nelson Mandela Metro (EC) R Ngwathe LM (Koppies) (FS) R Moqhaka LM (Kroonstad) (FS) R Nala LM (FS) R Mangaung Metro (FS) R Sol Plaatjie LM (NC) R Tlokwe LM (NW) R Total R

Skills and Capability Development  In general there is a shortage of skills in the engineering sector –Metro’s have an ability to attract and retain specialised engineering skills, however even Metro’s tend to be out-competed by the private industries. –SALGA acknowledge that small municipalities face a severe challenges in terms of attracting and retaining skilled resources.  In an effort to assist smaller municipalities with the skills gap, the following is being done:- –SALGA has initiated a businesses-adopt-a-municipality programme. –We also encourage Metros and Secondary Cities to partner with and support smaller municipalities. 12

Action Plan in Addressing Municipal Challenges  In an effort to assist and support municipalities, SALGA has put in place the following Action Plan:- –Provision of hands on support through the SALGA/AMEU National Electricity Technical Task Team and the CoGTA Municipal Infrastructure Support Agency (MISA); –On-going workshops in collaboration with relevant stakeholders on infrastructure maintenance and refurbishment; –The need to strengthen collaboration between SALGA, DoE, National Treasury, CoGTA, NERSA, AMEU and the private sector in addressing challenges experienced by municipalities; –Encouraging Metros and other performing secondary cities to partner with and support struggling / smaller municipalities ; –Dealing with the human resource constraints within municipalities by initiating accredited training in partnership with the Energy and Water Sector Education and Training Authority (EWSETA) and other relevant Electrical Engineering Training institutions. 13

Action Plan in Addressing Municipal Challenges (Cont…)  During October 2013, SALGA tabled a submission at the National Treasury Budget forum. The key recommendations were that National Treasury in consultation with SALGA, and other key stakeholders address the current municipal infrastructure financing gap through the following mechanisms:- –Infrastructure Renewal: exploring options of funding Municipal Infrastructure Renewal fund/grant and a Local Government Loan Fund –Municipal Bulk Infrastructure: the establishment of dedicated/conditional bulk infrastructure grants for electricity, solid waste, water and sanitation, and roads 14

Conclusion  With ADAM being funded from the fiscus, this will allow municipalities to start using existing tariffs to cover the costs related to the provision of the service, resulting in the speedy delivery of universal access to electricity.  The total Approach to Distribution Asset Management (ADAM) pilot project allocation should be seen as a start of addressing the EDI’s infrastructure backlog. –It is a Critical Emergency Intervention which will be part of implementing the overall ADAM strategy. –The DoE should also clarify the application criteria and allocation process or guidelines as to how this funding should be accessed and spent. –The programme should be aligned with the work of the Presidential Infrastructure Coordinating Commission (PICC) and relevant Strategic Integrated Projects (SIPs) to ensure better coordination and implementation. 15

THANK YOU