Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

How Will it Help Me Do My Job?
MONITORING OF SUBGRANTEES
Structural Design Program Review Massachusetts Department of Transportation September 20-23, 2011.
MSCG Training for Project Officers and Consultants: Project Officer and Consultant Roles in Supporting Successful Onsite Technical Assistance Visits.
Project Planning: Assembling a Mortenson “Integrated Work Plan”
Migrant Education Comprehensive Needs Assessment
OVERVIEW Two major initiatives Published Catalog Automated Graduation Certification.
Planning for Program Delivery Presented By: Michael A. Haithcock, P.E. Assistant State Program Delivery Engineer October 27, 2009.
Receiving a Performance Audit Steven P. McKerney, CPA Director of Internal Audit Washington State Department of Transportation Association of Government.
2006 TEA Conference Terry Berends, PE Assistant State Design Engineer Washington State Department of Transportation Risk Based Estimating Tools at WSDOT.
1 Disaster Recovery “Protecting City Data” Ron Bergman First Deputy Commissioner Gregory Neuhaus Assistant Commissioner THE CITY OF NEW YORK.
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
Disability Access and Inclusion Planning Agents and Contractors DAIP Progress Reporting.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
Transportation Management Plan Overview Module 3.
The BIM Project Execution Planning Procedure
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
Work Zone Safety and Traffic Management Alazar Tesfaye, PE Traffic Operations Engineer Colorado DOT Transportation Systems Management and Operations Division.
A Handbook That Outlines When traffic impact studies should be required What analyses should be included How the study should be reviewed and used Who.
Old Policy – which no one ever seem to have heard of.
Freight Bottleneck Study Update to the Intermodal, Freight, and Safety Subcommittee of the Regional Transportation Council September 12, 2002 North Central.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Project Initiation Document (PID) Strategic Plan PID Committee Meeting - November 5, 2012.
TMP Evaluation and Performance Module 9. Assessing TMP Performance2 Module Outline Why Assess TMP Performance? Performance Assessment – Project and Program.
TSM&O FLORIDA’S STATEWIDE IMPLEMENTATION Elizabeth Birriel, PEElizabeth Birriel, PE Florida Department of TransportationFlorida Department of TransportationTranspo2012.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Overview of the Work Zone Safety and Mobility Rule Module 1.
1 Growth Centres Commission Corruption Prevention Network – Annual Forum 11 September 2008 Corruption Prevention Network Annual Forum.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
1 Approaches for Integrating Systems Engineering into Your Agency’s Business Practices Presented by: Amy Tang McElwain August 2, 2007 Talking Technology.
Rule on Work Zone Safety and Mobility SHA’s Road to Compliance Maryland State Highway Administration Office of Traffic and Safety Talking OperationsJawad.
C ONSIDERING L ARGE T RUCKS IN THE D EVELOPMENT OF T RAFFIC M ANAGEMENT P LANS Neil Boudreau, MassDOT State Traffic Engineer April 13, 2015.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
Presentation to HAUC (UK) Wednesday 30 May 2012 RINA London.
ITIL Overview 1 Configuration Management Working Group February 8, 2011.
Subcommittee on Design New Strategies for Cost Estimating Research on Cost Estimating and Management NCHRP Project 8-49 Annual Meeting Orlando, Florida.
Guidance and Support of ITS Programs Michael Freitas May 2000 US Department of Transportation Federal Highway Administration.
Work Zone Rule Virtual Workshop – Rule State of the Practice Overview.
1 Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba,
Using OMB Section 508 reporting in addressing your agency's program maturity. How to Measure Your Agency's 508 Program.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Using GPS To Locate Collisions Lessons Learned Division of Traffic Accident Surveillance Section.
ROAD SAFETY PEER REVIEW Stuart Dungworth I.Eng FIHE MCIHT Reg RSA (IHE) URS/Scott Wilson.
Integrated Corridor Management Initiative ITS JPO Lead: Mike Freitas Technical Lead: John Harding, Office of Transportation Management.
Integrated Corridor Management Initiative Dale Thompson Transportation Specialist Office of Operations R&D May 4, 2005.
Improving Communication and Coordination in Highway Work Zones Kimberly Peters Incident Management Program Director, INDOT Event Date.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
Washington State Work Zone Rule  Work Zone Rule Implementation  New Work Zone Policy Cathy Nicholas, FHWA - WA Division Office Frank Newboles, WSDOT.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
ITS Device Standards & Procurement Project PURPOSE  Develop a series of Standards & Strategies designed to guide and provide consistency across the development.
Restructuring of the Finnish Infrastructure Administration Draft
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
The Professional Engineer Stamp. PE Stamp Required: Optional Details Optional Procedures Optional Materials Structural Capacity Safety Results of.
0 Freight Activities: Year in Review Dec. 12 th 2015.
Kentucky Transportation Center Contractor Performance Evaluations S TEPS AND G UIDANCE Kentucky Transportation Center Kentucky Transportation Cabinet.
Chair: Linda Miller, Great Lakes West Comprehensive Center Statewide Systems of Support: The RCC & State Story.
4.4 Monitor and Control Project Work
Project Management Institute
Training for New District Test Coordinators
Program Control Services – Overview
Kathy Harvey, P.E. State Design Engineer Missouri DOT
SPR-B Research Coordination Webinar
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Presentation transcript:

Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation

TMP Process Work Zone Safety and Mobility Policy Work Zone Safety and Mobility Policy Developed by cross sectional team Developed by cross sectional team Planners, Traffic and Safety, Development, Communications, etc. Planners, Traffic and Safety, Development, Communications, etc. Effective September 1, 2007 Effective September 1, 2007 Guidance Document Guidance Document Applies to all MDOT work zones (construction, maintenance, permits/utilities) Applies to all MDOT work zones (construction, maintenance, permits/utilities) Work Zone Safety and Mobility Manual Work Zone Safety and Mobility Manual Roles, responsibilities, strategies, etc. Roles, responsibilities, strategies, etc. TMP process created while preparing the manual TMP process created while preparing the manual

TMP Contents Transportation Management Plans (TMP) Transportation Management Plans (TMP) Required on all projects Required on all projects Temporary Traffic Control Plan (TTCP) Temporary Traffic Control Plan (TTCP) Transportation Operations Plan (TOP) Transportation Operations Plan (TOP) Public Information Plan (PIP) Public Information Plan (PIP) Significant Project Significant Project TTCP, TOP and PIP Required TTCP, TOP and PIP Required Non-Significant Project Non-Significant Project TTCP Required TTCP Required TOP and PIP Recommended TOP and PIP Recommended

TMP Development TMP development begins in the project planning and scoping phase TMP development begins in the project planning and scoping phase Involves planning and design staff Involves planning and design staff Incorporates big picture issues Incorporates big picture issues Further details as project progresses Further details as project progresses Allows more accurate programming and budgets Allows more accurate programming and budgets Maintaining traffic schemes (Temporary structure for maintaining traffic, crossovers, etc.) Maintaining traffic schemes (Temporary structure for maintaining traffic, crossovers, etc.) Temporary ITS applications Temporary ITS applications Coordination with corridor and network projects Coordination with corridor and network projects

TMP Development Project Design Phase Project Design Phase Details flushed out Details flushed out Primary TMP development occurs during this stage in parallel with plan completion Primary TMP development occurs during this stage in parallel with plan completion Project delivery staff are engaged for better coordination and constructability reviews Project delivery staff are engaged for better coordination and constructability reviews Pay items are incorporated into the project plans and specifications Pay items are incorporated into the project plans and specifications Special provisions are documented for project specific and/or unique issues Special provisions are documented for project specific and/or unique issues

TMP Development Statewide Peer Review Team (SPRT) Statewide Peer Review Team (SPRT) Mobility analysis and thresholds Mobility analysis and thresholds Travel Time Travel Time Level of Service Level of Service Volume to Capacity Ratio Volume to Capacity Ratio Project Rating system Project Rating system Review Form Review Form Red, Yellow, Green Red, Yellow, Green Executive level engagement Executive level engagement Benefits Benefits Check and balance for mobility issues Check and balance for mobility issues Feedback from other areas Feedback from other areas Statewide Work Zone Administrator provides consistency Statewide Work Zone Administrator provides consistency Staff have been very receptive of this review Staff have been very receptive of this review

TMP Implementation Responsibility of project delivery staff Responsibility of project delivery staff Strategy implementation Strategy implementation Changes, variations, etc. provided to development staff Changes, variations, etc. provided to development staff

TMP Implementation Performance Performance Performance monitoring Performance monitoring Worksite trailers Worksite trailers Travel time Travel time Queues Queues Cameras / Detectors Cameras / Detectors Crashes Crashes How much did accidents decrease because of mitigation measures and comparable projects How much did accidents decrease because of mitigation measures and comparable projects Did accident severity decrease Did accident severity decrease Measurements versus expectations Measurements versus expectations How did actual measured delay compare with expected delay (travel time, queues) How did actual measured delay compare with expected delay (travel time, queues) Project documentation Project documentation

TMP Lessons Learned A TMP template was created to assist project development staff with TMP submittals A TMP template was created to assist project development staff with TMP submittals Uniformity Uniformity Critical Focus Area Critical Focus Area TMP reviews are now conducted as needed versus at pre-determined dates TMP reviews are now conducted as needed versus at pre-determined dates Less Time Crunch Less Time Crunch Better Quality Better Quality Better Use of Staff Resources Better Use of Staff Resources Faster Response for Project Offices Faster Response for Project Offices

TMP Lessons Learned Public involvement in the TMP development is critical Public involvement in the TMP development is critical Crash Analysis Crash Analysis Accurate Traffic Data Accurate Traffic Data

Work Zone Safety and Mobility Manual MDOT’s Work Zone Safety and Mobility Manual can be found at the following link. TMP information can be found in Chapter 4 MDOT’s Work Zone Safety and Mobility Manual can be found at the following link. TMP information can be found in Chapter 4 MobilityManual_233891_7.pdf MobilityManual_233891_7.pdf MobilityManual_233891_7.pdf MobilityManual_233891_7.pdf MDOT’s Work Zone Safety and Mobility Policy is not available on-line but the document can be electronically provided if requested MDOT’s Work Zone Safety and Mobility Policy is not available on-line but the document can be electronically provided if requested Contact Jason Gutting, P.E., Systems Operations and Management Engineer, Contact Jason Gutting, P.E., Systems Operations and Management Engineer,