Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.

Slides:



Advertisements
Similar presentations
WECC TRD/NERC TADS Webinar
Advertisements

Questions about AVR & PSS
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
WECC Operating Committee and Planning Coordinating Committee Brian K. Keel Chair – Reliability Subcommittee June 18 & 19, 2009 WECC Reliability Subcommittee.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.
The Power Grid ELEC 403 The Citadel Mark McKinney.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.
April 15 and May 15, 2003 ERCOT System Disturbances ERCOT TAC Meeting June 4, 2003.
MARCH 31, 2014 Maine 2014 Outage Coordination CONTAINS CRITICAL ENERGY INFRASTRUCTURE INFORMATION – DO NOT RELEASE.
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Review of Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.
Team BUSS Backup Storage Source. Team BUSS Idaho Power Company Backup Storage Source Project Title Extra High Voltage (EHV) Station Second DC Storage.
Transmission Availability Data System (TADS) TADS Workshops: January 16, 2008 and February 6, UPDATED Workshop Session 2: Forms.
Distribution Lightning Protection Pilot Projects Reliability Engineering Team Lightning Arrester Initiative Presented by Tim Constanzo, PE.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
1 Power Quality Mary Santori, P.E. Senior Engineer September 12, 2013.
1 Entergy Transmission Asset Preservation Department 2004 Objectives Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
2. Terms and definitions1 # Terms and Definitions # Voltage Sags and Interruptions.
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
Electricity and the Grid SPH4C. Power Recall that the power delivered to a circuit or consumed by a load is:
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
VISUALIZATION WHY WE NEED SYNCHROPHASOR TECHNOLOGY IN OPERATIONS John Ballance – EPG Presented to ERCOT Phasor Technology Workshop – November 16, 2012.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
SIMPLE TRANSMISSION OUTAGE. Nodal Protocol Definition 2.26 Simple Transmission Outage A Planned Outage or Maintenance Outage of any Transmission Element.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
ISO Comparison – CAISO Alex Lee (ERCOT)
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Planning the CREZ 345 kV System for Multi-contingencies CREZ Technical Conference January 26, 2010 Bernie Pasternack AEP Service Corporation.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
POWER HOUSE.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Maximizing the Reliability of Electronic Systems Total Protection Solution.
OCTOBER 2, 2013 Maine 2013 Outage Coordination Redacted Copy.
Current Operational Challenges Computing the West – North Limits Potential IROLs Local Voltage & Thermal issue (OOME) High Voltage Outages.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
DISTRIBUTED GENERATION ISSUES Technical Issues Non-Technical Issues.
Integrated Reliability Measures Heide Caswell, Team Lead, Reliability Metrics Working Group (RMWG) Director of Network Performance, PacifiCorp Compliance.
Protection of Power Systems
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Comparison of AIS and GIS Grid Station Muhammad Ali Ashraf Management Associate (Electrical) CPP Project.
Probabilistic Transmission Planning - ERCOT
Power Quality at Solar Distributed Generation Facilities
System Modeling Discussion
Phase Angle Limitations
Modifications to Planning Charter
Compliance Report to ERCOT TAC February 2007
Reliability and Operations Subcommittee Report
Power Recall that the power delivered to a circuit or consumed by a load is:
Workshop Session 2: Forms
Workshop Session 1: Overview
WECC August 2017 Reliability Workshop James Merlo, PhD
Workshop Session 1: Overview
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
WECC August 2017 Reliability Workshop James Merlo, PhD
Presentation transcript:

Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error AC Transmission Outages - Failed AC Substation Equipment AC Transmission Outages - Failed AC Circuit Equipment AC Transmission Outages - Lightning AC Transmission Outages - Contamination AC Transmission Outages - Foreign Interference Total Element Availability Percentage (APC) Transmission System Unavailability AC Circuit kV Outages per Circuit AC Circuit kV Outages per 100 miles per year kVJan-12Dec-12 # Circuits Circuit Miles Multi-circuit Structure Miles Automatic Outages Circuit Data Outage InformationCountDuration (hrs) Automatic Non-Automatic Outage Data Outage InformationCount Duration (hrs) Two Elements94.82 Three Elements35.3 Four or More Elements118.3 Multiple Element Automatic Outages

Review of TADS Automatic Outage Data for 2012 ●Lightning, Contamination, and Unknown represent 73% of all momentary outages ●Momentary and Sustained automatic outages by month for 2012

Review of TADS Automatic Outage Data for 2012 ●Failed AC Substation Equipment represented 22% of sustained outage cause vs. 46% of sustained outage duration ●Failed AC Circuit Equipment represented 7% of sustained outage cause vs. 16% of sustained outage duration

Review of TADS Planned Outage Data for 2012

●55% of planned outage duration ranges from two to 24 hours ●37% of planned outage duration is greater than 24 hours

TADS Comparison, 2011 vs Outage InformationCountDuration (hrs)CountDuration (hrs) Automatic Non-Automatic Voltage Class kV MetricOutages/Number of circuitsOutages/100 mi/year AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error AC Transmission Outages - Failed AC Substation Equipment AC Transmission Outages - Failed AC Circuit Equipment AC Transmission Outages - Lightning AC Transmission Outages - Contamination AC Transmission Outages - Foreign Interference Total Element Availability Percentage (APC) Transmission System Unavailability

TADS Comparison,

TADS Comparison, April-May 2011 had higher than normal rate of contamination-related outages due to ongoing drought issues Sept 2011 had high sustained outage duration due to wildfires

Common Mode and Dependent Mode Outage Statistics Dependent Mode outages (defined as an automatic outage of an element which occurred as a result of another outage) Common Mode outages (defined as one or more automatic outages with the same initiating cause and occur nearly simultaneously) In 2012, represented 6.0% of all momentary outages, 26.3% of all sustained outages (6.6% of sustained outage duration), and 13.0% of all automatic outages.

NERC Adequate Level of Reliability (ALR) Metrics MetricDefinitionERCOT Metric NERC Metric ERCOT Metric NERC Metric ERCOT Metric NERC Metric ALR6-11Automatic Outages Initiated by Failed Protection Equipment 4.95%6.26%3.05%5.55%2.62%5.07% ALR6-12Automatic Outages Initiated by Human Error 1.41%6.57%6.77%6.87%4.26%6.55% ALR6-13Automatic Outages Initiated by Failed AC Substation Equipment 8.13%5.59%13.2%8.14%5.89%6.19% ALR6-14Automatic Outages Initiated by Failed AC Circuit Equipment 2.83%5.89%5.08%5.37%4.58%4.78% ALR6-15Element Availability Percentage 98.64%98.41%98.06%97.86%98.62%97.89% Comparison of ERCOT to NERC metrics for Adequate Level of Reliability measurements