3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 1 3.5.6 Verifying the Presence of Propane Odorant Drivers and plant unloading personnel.

Slides:



Advertisements
Similar presentations
Forktruck LP Gas Safety
Advertisements

3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
Student Book © 2004 Propane Education & Research CouncilPage Placing Appliances into Initial Operation Knowing the proper techniques and.
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
3.3.3 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders Operating a dispenser to fill DOT.
4.2 Student Book © 2004 Propane Education & Research Council Preparing and Installing Vapor Distribution System Components 4.2.
3.7.6 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
2.5 Student Book © 2004 Propane Education & Research Council 2.5 Operating a Truck, Tank Trailer or Tractor/Trailer to Deliver or Relocate ASME Tanks.
2.5.2 Student Book © 2004 Propane Education & Research CouncilPage Examining, Maintaining and Operating ASME Tank Setting Trailers For the safe.
3.7.4 Student Book © 2004 Propane Education & Research CouncilPage Identifying Testing Procedures for Anhydrous Ammonia (NH3) Contamination Because.
4.1.9 Student Book © 2004 Propane Education & Research CouncilPage Sizing and Selecting Vapor Meters for Gas Distribution Systems Vapor meters.
3.4.6 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Compressors Knowledge of the processes involved in maintaining.
3.2.5 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Requalifying DOT Cylinders by CGA External Visual.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
3.6.2 Student Book © 2004 Propane Education & Research CouncilPage 1 Many propane marketers receive railcar bulk propane shipments. Well-trained personnel.
1.1.2 Student Book © 2004 Propane Education & Research CouncilPage 1 A basic knowledge and understanding of propane’s physical properties and characteristics.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Student Book © 2004 Propane Education & Research CouncilPage Installing Buried Distribution Lines Using Polyethylene Tubing and Mechanical.
2.3.6 Student Book © 2004 Propane Education & Research CouncilPage Performing a Walk-Around Inspection of the Transport After Loading Performing.
Student Book © 2004 Propane Education & Research CouncilPage Installing Manifold Cylinders or Tanks When installing manifold DOT cylinders.
Transporting ASME, DOT Portable, and Intermodal (IM) Tanks
3.1.5 Identifying Procedures for Evacuating ASME Tanks at Bulk Plants or at Customer Locations A full understanding of the operation of the liquid evacuation.
Student Book © 2004 Propane Education & Research CouncilPage 1 To provide safe and efficient transporting of bulk containers, such as ASME tanks.
MODULE 7 Unload a Cargo Tank Motor Vehicle (CTMV).
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
5.1.2 Student Book © 2005 Propane Education & Research CouncilPage 1 NFPA 58, LP-Gas Code, sets out the minimum valve and fitting requirements for propane.
3.2.2 Student Book © 2004 Propane Education & Research CouncilPage Performing DOT Cylinder Evacuation and Vapor Flaring Operations Before DOT cylinder.
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
3.6 Student Book © 2004 Propane Education & Research Council 3.6 Performing Railcar Product Transfers.
4.1 Student Book © 2004 Propane Education & Research Council Layout, Design and Selection of a Vapor Distribution System 4.1.
4.1.5 Student Book © 2004 Propane Education & Research CouncilPage Determining the Proper Corrosion Protection Systems for Underground ASME Tanks.
3.6.6 Student Book © 2004 Propane Education & Research CouncilPage 1 In the wake of the September 11 th attack and continuing terrorist threats, shippers,
Student Book © 2004 Propane Education & Research CouncilPage Applying Protective Coatings to Storage Containers ASME tanks require proper.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
5.1.5 Student Book © 2005 Propane Education & Research CouncilPage 1 Specific measures are required by the LP-Gas Code for the prevention of dispenser.
3.5.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Following the proper procedures for filling bobtails is essential to a safe and efficient.
In this module you will learn to identify:
In this module you will learn to:
2.5.3 Student Book © 2004 Propane Education & Research CouncilPage Verifying Proper ASME Tank Condition Prior to Loading For the safe and efficient.
2.3 Student Book © 2004 Propane Education & Research Council 2.3 Operating a Transport To Deliver Propane.
5.1.7 Student Book © 2005 Propane Education & Research CouncilPage 1 Dispensers used to service portable cylinders require suitable scales for filling.
5.1.? Student Book © 2005 Propane Education & Research CouncilPage 1 Selecting the pump for a propane dispenser should include a complete understanding.
4.2.8 Student Book © 2004 Propane Education & Research CouncilPage Installing Aboveground ASME Tanks Installing aboveground tanks is an important.
3.4.7 Student Book © 2004 Propane Education & Research CouncilPage Examining Bulk Plant Electrical Systems Prevention of gas ignition in transfer.
7.3.5 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Function and Characteristics of Draft Fans & Controls High efficiency.
2.3.8 Student Book © 2004 Propane Education & Research CouncilPage Performing Pre-Unloading Cargo Tank Emergency Discharge System & Delivery Hose.
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
3.4.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Bulk Plant Security Procedures In the wake of the September 11 th,
3.7.3 Student Book © 2004 Propane Education & Research CouncilPage Identifying Safe Handling Practices for Flammable and Combustible Liquids Injecting.
Student Book © 2004 Propane Education & Research CouncilPage Documenting Vapor Distribution System Installations Documenting your work.
5.1 Student Book © 2005 Propane Education & Research Council 5.1 Designing & Installing Dispenser Transfer Systems.
5.1.9 Student Book © 2005 Propane Education & Research CouncilPage Installing Propane Dispensers Successful propane dispenser installations are.
MODULE 6 Vehicle Parking, Servicing, and Security.
Student Book © 2004 Propane Education & Research CouncilPage Reducing Cargo Tank Vapor Pressure Using a Plant Compressor In order to use.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
7.4.3 Student Book © 2005 Propane Education & Research CouncilPage Identifying Systematic Troubleshooting Techniques and Guidelines for Gas Operated.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
3.5.9 Student Book © 2004 Propane Education & Research CouncilPage 1 Although unloading a bobtail cargo tank in metered delivery service at the bulk plant.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
MODULE 3 Bobtail Equipment and Systems.
4.2.3 Student Book © 2004 Propane Education & Research CouncilPage Transporting Materials of Trade To transport hazardous material as a material.
3.3.4 Student Book © 2004 Propane Education & Research CouncilPage Operating a Dispenser to Fill DOT Cylinders by Volume DOT cylinders are designed.
4.1.2 Student Book © 2004 Propane Education & Research CouncilPage Determining System Load and Customer Demand Profile Designing a satisfactory.
Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Converting ASME Tanks in Ammonia Service to Propane.
3.1.8 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Conducting Container Vapor Flaring Operations Before.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
Installing DOT/ICC Exchange or Stationary Cylinders
Information to the Customer
Presentation transcript:

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage Verifying the Presence of Propane Odorant Drivers and plant unloading personnel must comply with NFPA 58 to perform documented sniff tests during transfer operations. In this module you will learn to: (1)Identify regulations pertaining to odorization (2)Use the sniff test method to verify propane odorization (3) Use alternate methods to verify propane odorization

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 1 Propane Odorization Regulations NFPA 58 U.S. DOT regulations and NFPA 58 require that propane be odorized prior to transportation to the ultimate consumer, except when the propane will be used in a manufacturing process that requires the use of “unstenched” LP-gas. NFPA …the presence of the odorant shall be deter- mined by sniff-testing or other means and the results shall by documented as follows: (1)When the LP-Gas is delivered to a bulk plant (2)When shipments of LP-Gas bypass the bulk plant

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 1 Propane Odorization Regulations NFPA 58 To comply with NFPA 58, drivers and plant unloading personnel should perform documented sniff tests at the time propane is received. Many companies routinely document sniff tests as part of any bulk plant transfer operation.

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 1 & 2 Sniff-Test Method for Verifying Odorization Protect your eyes and hands by wearing suitable gloves and goggles, or splash face shield. Technical Tip Vent only a small quantity of liquid propane. Sniff only after the vent is closed and propane liquid has vaporized. Be sure you know your company’s policies & standard operating procedures, how to document the presence of propane odorant and how to react if you have reason to believe propane is not properly odorized.

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 2 Sniff-Test During Cargo Tank Loading Step 1:After the plant liquid transfer hose is secured on the cargo tank connection and before filling the cargo tank, briefly open and close the transfer hose end valve. Step 2:Vent a small quantity of liquid through a #54 vent and then close it. Step 3:Sniff the area immediately after the liquid vaporizes. Step 4:Verify that the product is odorized. Step 5:If you can smell propane odorant, record your sniff test on your loading ticket, daily routing report, or other company form and proceed with the loading operation.

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 2 Sniff-Test During Cargo Tank Loading CAUTION: If you cannot smell propane odorant, some general guidelines include: 1.DO NOT load the cargo tank. 2.DISCONNECT the transfer hoses & SECURE them in their storage racks. 3.CONTACT your supervisor immediately. 4.TELL others in the area not to load until approved by the facility manager or supervisor. If your company procedures call for it, close and tag the withdrawal valves on the storage container so that it is not distributed to consumers.

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 2 Sniff-Test Cylinder Filling Operations 1.Bulk plant personnel who operate dispensers and cylinder filling equipment should also be alert to potentially improperly odorized propane. 2.In the course of disconnecting cylinder and motor fuel tank filling adapters, sufficient liquid propane is vented to enable the operator to perform a sniff test. 3.If, at any time, the operator has reason to believe that odorant is not present in the vented propane, he or she should take the steps listed above for cargo tank loading operations.

3.5.6 Student Book © 2004 Propane Education & Research CouncilPage 3 Alternative Methods for Verifying Odorization Other Odorization Testing Methods Stain Tubes Laboratory Tests of Liquid Samples (gas chromatography) Specialized Testing Instruments

3.5.6 Student Book © 2004 Propane Education & Research CouncilPages 4 & 5 Time to See If You Got the Key Points of This Module… Complete the Review on page 4. See if you are ready for the Certification Exam by checking off the performance criteria on page 5.